Chuangxiang international construction decoration

Interior wall: the walls of the hall and room are painted with high-grade glue, and glazed tiles are attached to the foot of the wall, and the foot line is 10cm high.

Windows and doors: white aluminum alloy window frames with green glass are installed in residential windows and floor-to-ceiling doors and windows in foyer, and marble is laid on the floating window sill.

Install fireproof composite steel doors.

The room adopts high-quality beech plywood door with door cover.

Kitchen: the kitchen adopts high-quality beech plywood door with door cover; The kitchen floor is paved with antique tiles.

Tile the kitchen.

Plastic gusset plates are used in the kitchen.

Toilet: the bathroom adopts high-quality beech plywood door with door cover; Tile the bathroom.

Tile the bathroom; Adopt high-quality sanitary ware.

Power supply: indoor wires are installed with open wires.

Water supply: an independent water meter is used, and the water supply pipes in the kitchen and bathroom are equipped with cicadas.

Gas supply: every household is equipped with pipeline gas, which can be used as long as it is properly applied to the gas company (the registration fee is paid by itself).

Heating: each household reserves the location of the main engine and reserved holes, and uniformly installs and distributes condensation droppers.

Communication: Cable TV connection port is reserved in the lobby, which can be used once declared; Install IDD program-controlled telephone socket in the lobby.