Summary of supervision completion work

Completion is a legally binding acceptance of completed buildings by relevant state units according to national acceptance standards, and relevant legal documents are issued. I sorted out the summary of supervision completion work for reference!

Overview of completion supervision (I) 1. Project overview:

The project is the student experimental building of Fengxian Vocational Education Center, with a construction area of 7,500 square meters, a design service life of 50 years, a structural safety grade of Grade II and a seismic fortification intensity of Grade VI. The project is located in the campus of vocational education center, with five floors of frame structure and C30 concrete, and the seismic grade of the frame structure is Grade 4. The quality control grade of masonry engineering is Grade B, the fire resistance grade is Grade II, the wall masonry is M5.0 mixed mortar, the ground is terrazzo surface, aluminum alloy window, internal wall mixed mortar and external wall cement mortar, and the roof is thermal insulation rigid roof.

Second, the performance of the supervision contract

The supervision unit supervises the project according to the existing relevant laws, regulations, standard documents and mandatory provisions, has completed all the contents of the design drawings and related changes, has delivered the building materials of the completed laboratory to Party A for the record, and has supervised the construction unit to rectify the related problems raised by the construction acceptance.

Thirdly, the effectiveness of supervision.

From the commencement to the completion of this project, according to the specific conditions of this project, the detailed supervision rules are compiled according to the supervision planning, the project is effectively controlled according to the detailed rules, the drawings are carefully reviewed, and the construction is arranged according to the organization design of the construction unit. The supervision unit has formulated the on-site quality and safety management system, put forward the responsibility of the construction unit, and checked and accepted the incoming materials before they can be used, thus eliminating the unqualified materials and ensuring the engineering quality. In the process of construction, the construction unit is required to report to the supervisor for acceptance after passing the self-inspection. During this period, the supervisor implements the parallel inspection system, and puts forward timely rectification in advance for the sub-inspection lots that do not meet the requirements. In the process of acceptance, the timeliness is improved and the project quality is guaranteed. In terms of safety, the construction unit is required to inform in advance that there is no potential safety hazard.

After the completion of the project, timely sort out and improve the project data, and actively organize pre-acceptance and completion acceptance. The problems raised during the completion acceptance were supervised by the construction unit, and the project was well evaluated by relevant departments and experts in terms of data and perception.

Overview of completion supervision (II) I. Overview of the project

The building was developed by Handan Junziju Real Estate Development Co., Ltd., designed by Beijing Century Zhongtian International Architectural Design Co., Ltd., constructed by Handan No.4 Construction and Installation Co., Ltd., and supervised by Hebei Tianfeng Engineering Project Management Co., Ltd.

The project address is located in the east of buildings 4#, 8#, 12#, 15# and 20# of the second phase of Longshan Junziju in Shexian County. There are 2 floors above ground and 3 floors locally, with building height 10. 15 m and building area of 5776.72㎡. Structure type: reinforced concrete frame structure, building safety grade II, seismic fortification intensity 7, frame seismic grade III, and reasonable service life of the building 50 years.

The foundation is reinforced concrete cast-in-place pile with C 15 concrete cushion. The concrete strength of all structural members is C30, and that of all non-structural members is C20. The rebar specifications are HPB235 hot rolled rebar and HRB400 hot rolled ribbed rebar. The infilled wall masonry is autoclaved aerated concrete block. Roof insulation adopts 60 thick extruded polystyrene foam and slag as insulation layer. The roofing waterproof material is 3+3 thick SBS waterproofing membrane.

Second, the supervision organization staffing

In order to do a good job in supervision, our company established the on-site supervision department and implemented the responsibility system of general supervision projects. A professional supervision engineer is responsible for all supervision work. Chief supervision engineer: Guo Shaozhou, civil engineering supervision engineer: Wang Shengli, Wang Hanting and Yang Shuitai. Supervision engineer of water heating and electricity: Yao.

Third, the performance of the supervision contract

After signing the project supervision contract with Handan Junziju Real Estate Development Co., Ltd., our company strictly fulfilled the contract, formulated various control measures based on the terms of the contract, adhered to the principle of strict supervision and enthusiastic service, adopted measures such as patrol, parallel inspection and on-site supervision, and adopted technical guidance and pioneering ideas to deal with the problems existing in the project process scientifically and fairly, so as to effectively control the project quality and investment. Do your best to promote the realization of the progress goal. The supervision contract has been well fulfilled.

Fourthly, the effectiveness of supervision.

According to the supervision contract and the authorization of the owner, the supervision unit actively guides and supervises the construction unit to strictly perform the project construction contract, correctly uses the responsibility skills of supervision, and handles the problems seriously and orderly in accordance with the fair procedures and requirements of supervision. The overall goal of the construction project has been achieved well. When dealing with the relationship among construction period, quality and investment, we should try our best to sum up the personal work of industrial construction projects in accordance with the principle of "taking quality as the center, focusing on construction period and aiming at investment benefit".

In terms of quality control, the emphasis is on the review of the construction scheme, labor, materials and machinery submitted by the construction unit. Whether the quality management and assurance system is sound and whether the technical measures are targeted and effective have been strictly inspected and supervised. Adhere to the inspection system of raw materials by item and division. Unqualified materials are not allowed to be used in the project, and the construction unit is required to clear the site. Unqualified projects are prohibited from the next working procedure. Taking engineering quality control as the center, control points are set for prevention. Pay attention to the key parts and weak links of this project. For the problems existing in the construction, issue supervision instructions and order the construction unit to rework or rectify and review, so as to effectively control the project quality. After joint acceptance, the quality grade of this project is qualified.

In terms of schedule control, according to the requirements of the total construction period of the project department, the logical relationship of the project schedule compiled by the construction unit, the balanced investment of construction procedures and resources, and the impact on the construction quality and contract construction period, the gap between formulation and implementation, key routes and important events are controlled, and effective implementation measures are put forward. Thereby completing the construction period well.

In terms of investment target control, the construction unit is required to organize the construction reasonably by reviewing the organization design, construction scheme and reasonable expenditure, so as to avoid unreasonable overtime expenses. Strengthen the review and coordination of design changes, handle changes reasonably, and reduce the conditions and opportunities for both parties to file claims. Strictly control the quality and acceptance of the project, and the unqualified quantities will not be measured. So that the target has been reasonably controlled.

Five, the problems in the process of construction in a timely manner.

There are some common quality problems in the process of foundation and main body construction. Such as irregular steel blanking, fixed deviation of formwork verticality and flat-fell seam, concrete exposure and small honeycomb phenomenon, and unequal masonry brick joints. On-site supervision issues supervision instructions in time, and urges the construction unit to carry out rectification. After rectification, the next process will be carried out after re-acceptance.

In the decoration construction stage, the supervision of plastering, internal and external wall coatings, plastic steel processing, water, heating and electricity projects has been strengthened. The construction unit is required to rework and repair the existing problems in time. For example, plastering is empty, anti-magnetic coating falls off, switch socket is uneven, the ground is sunken, doors and windows are improperly opened and closed, and hardware is loose and unstable. The above quality problems have been strictly supervised by the supervision unit. The quality rectification notice was issued, and the quality of the project was effectively controlled through reinspection after rectification. In a word, with the close cooperation of the owner, the supervisor and the constructor, all the construction objectives have been successfully completed.

Overview of completion supervision (III) I. Overview of the project

The chemical building project of Institute of Technology is located in the University Town of Jiangsu Institute of Technology, with a building area of16388m2 and a frame structure of 5 floors. The elevation of +0.00 in this project is equivalent to the elevation of 5.75m in Qingdao. The construction unit entrusts the Construction Supervision Co., Ltd. to supervise the construction stage of the project.

Second, supervise the investment in facilities.

In order to check and control the quality of the project, the project department has invested in level, theodolite, rebound instrument, magnifying glass, camera, telephone and testing toolbox. In order to ensure the cleanliness of engineering data, the project department is equipped with a computer and a printer.

Third, the performance of the contract

During the establishment of the project implementation stage, according to the national standards, technical documents, design drawings and documents, and mandatory standards for engineering construction, the quality, progress, safety and civilization of the project were effectively controlled by the supervision criteria of "honesty, law-abiding, fairness and science" and the working methods of "standing by, patrolling and parallel inspection". The quality of the project meets the requirements of the acceptance specification, the progress of the project basically meets the requirements of the contract, and no quality and safety accidents have occurred in the whole project. The specific work is as follows:

1. According to the signed supervision contract and engineering characteristics, we set up the supervision department with Huangfu Guofang as the chief supervision engineer, and equipped with ***5 supervisors from various disciplines to meet the needs of supervision work.

2. After the supervision personnel enter the site, according to the contract requirements, we compiled the supervision specifications and detailed rules in time, and handed them over to the construction unit before the project started. In the process of supervision, we work conscientiously and diligently according to the working system, procedures, methods and measures in the supervision planning. In the process of fulfilling the contractual obligations, the supervisor provides advice to the client to safeguard the legitimate rights and interests of the construction parties. And at the end of each month, provide the monthly supervision report to the client and report the supervision work this month. 34 monthly supervision reports were prepared.

3. Be familiar with the drawings and participate in the design disclosure and the blue prints.the design.

According to the principles of safety, optimization and economy, six suggestions on technical problems in engineering design are put forward. 15 of the engineering changes were proposed by the project owner, and 15 of the engineering changes were approved by the design department, and the supervision issued a supervision notice to the construction unit for implementation.

4. Carefully examine and approve the project construction organization design and technical scheme. Before construction, the chief supervision engineer shall organize supervisors to review the construction organization design and the construction scheme of the first procedure submitted by the construction unit. We put forward suggestions to the contractor and submit a written report to the owner on the principle of ensuring quality, ensuring construction period and reducing cost.

5. Quality control of raw materials and components: After the products of raw materials and components enter the site, we will review the quality assurance materials such as their certificates, and check the physical objects one by one to see whether their varieties, specifications, appearance and quality meet the relevant specifications and design requirements. Steel, cement, bricks and waterproof materials are not allowed to be used in the project until they are sampled by the supervisor and sent to a qualified testing institution for re-inspection. We witnessed the sampling: (1) reinforcing bar Ф 6.5 ~ Ф 25 for 59 times, flash butt welding for 6 times, taper thread for 9 groups, electric welding and pressure welding for 16 times, hollow brick for 6 times, sintered brick for 3 times, face brick and rubber waterstop for 1 time, and sand and gravel for 3 times. Materials that have not been submitted for inspection or failed to pass the inspection are not allowed to be used in the project. We witnessed the production of 60 concrete test blocks and 60 mortar test blocks, and we also checked the certificates of various raw materials, accessories and equipment used in hydropower installation projects.

6. Do a good job of rechecking the measuring and setting-out results. Check the positioning, elevation, axis, template size, elevation size of reserved windows and doors, and pipeline laying of water, electricity and sanitation projects respectively, and make records.

7. Strictly implement the patrol station and parallel detection system. In the process of structural concrete construction of the whole project, we all use the on-site station to effectively control the quality of concrete pouring and the protective layer of steel bars. The "quality inspection" of each working procedure of concealed works adopts the methods of parallel inspection and on-site inspection, and can only be used or entered into the next working procedure after meeting the requirements of design and construction acceptance specifications and mandatory standards. We conducted the 3 15 parallel inspection and filled in the inspection records carefully. We found that the construction unit violated the mandatory standards and did not meet the construction quality acceptance specifications, and we took effective measures to stop and correct them. During the whole process, we issued 12 quality improvement notices. 19 copies are safe. After rectification, the construction of the next working procedure can only be carried out after the supervision has passed the acceptance.

8. Hold an on-site meeting. We have a regular meeting on the construction site once a week. We check the progress and quality of last week's project, the implementation of the matters solved at the last meeting, and put forward opinions on the plans and requirements for next week. Various issues were also coordinated at the meeting, and important coordination matters were reported to the client in advance. After the meeting, the Ministry of Supervision timely sorted out the minutes of the meeting. The whole project held 40 regular site meetings and 5 special meetings.

9. Earnestly do a good job in the acceptance of inspection lots, sub-projects, sub-projects and unit projects: The supervisor will re-examine sub-projects, sub-projects and concealed projects on the basis that the construction unit has passed the self-inspection, and verify the quality grade of sub-projects according to design drawings, national standards, quality evaluation standards and relevant regulations. Without the signature of the supervisor, the construction of the next working procedure cannot be carried out, and it will be issued to the construction unit in the form of supervision instructions. After the completion of concealed works, the construction unit must fill in the quality acceptance notice of concealed works after passing the self-inspection, full inspection and initial inspection, and report it to the on-site supervision engineer for acceptance before concealment. After the completion of the unit project, the construction unit will submit the project completion acceptance report after the initial inspection is qualified. After receiving the report, the chief supervision engineer will organize the construction parties to conduct pre-acceptance before completion under the supervision of Wujin District Quality Supervision Station.

10. Project cost control: We timely check the completed project measurement according to the contract, so as to avoid the passive situation of admitting the completed project quantity without the approval of the supervisor, and strictly implement the fund visa. All visas involving capital expenditure, such as suspension visa, employment visa, use of machinery visa, material substitution, material price adjustment, etc. , will eventually be approved by the project chief supervision engineer and submitted to Party A for approval. Regularly report the investment trends to the owner and the company in the form of monthly supervision report. All kinds of visas are authorized by Party A according to the contract requirements. In the process of project construction, the monthly project progress payment shall be paid after being reviewed and confirmed according to the project quality measurement.

1 1. In accordance with the Regulations on Safety Management of Construction Projects, do a good job in safety production supervision and perform supervisory duties. In the patrol inspection, problems such as non-compliance with the construction plan, violation of mandatory standards and illegal operation are found, and the supervision engineer is immediately notified to ask the construction unit to rectify and supervise the rectification results. After meeting the requirements, construction is allowed to continue.

12, do a good job in project file management. In the process of supervision, we timely urge and check the construction unit to collect, bind and archive the engineering data according to the requirements of the Code for Filing and Arrangement of Construction Engineering Documents. At the same time, the supervisor also appointed a supervisor to collect, sort out and file the supervision data. Be true and complete, and classify in an orderly manner. After filing, it shall be handed over to the construction unit.

Verb (abbreviation of verb) supervises the effectiveness of work.

In order to ensure the quality of the project and strive for high-quality projects, the supervision department will organize all construction units to conduct mutual inspection as soon as the project starts, popularize good construction methods, and organize visits and studies for sub-projects with excellent construction quality. In the process of engineering construction, all units are organized to conduct appraisal, forming a competitive atmosphere of comparison, learning, catching up and surpassing. Through a series of quality activities, Jinling Beiyuan Project supervised by our unit was rated as a provincial civilized project and a municipal quality project. Project investment is under control. All unit projects are constructed in strict accordance with the design standard drawings and design changes, and in strict accordance with the relevant provisions of the construction contract. During the whole construction process, the main part of the foundation meets the requirements of design and construction acceptance specifications, the structure is safe and reliable, the roof is waterproof and impervious, and other functions meet the design requirements. The whole project process did not violate the "Regulations on Quality Management of Construction Projects" and the mandatory provisions of engineering construction standards. Material approach, product certificate, test report and other relevant quality assurance materials are complete.