Labor internal contract 1
Employer: (hereinafter referred to as Party A)
Contractor: ID number: (hereinafter referred to as Party B)
In accordance with the Labor Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC), the Contract Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, and following the principles of equality, voluntariness, fairness and good faith, both parties reached an agreement on the subcontracting of this construction project and concluded this contract.
Article 1: Project Overview
1, project name:
2. Project location:
Article 2: Method of project contracting
Labor fee contracting
Article 3: Scope of Project Contracting
1. Skirt building, main masonry project, overhead layer, standard layer plastering project, roofing project (except CPS waterproof), external wall decoration project and other professional convergent hole filling projects; Erection and removal of simple indoor plastering scaffolding; Plastering and muck filling in the toilet pit; Mortar sealing engineering for doors and windows, etc.
Second, the ground engineering to the design elevation.
Third, the design increases and decreases the changes of the project content.
4. Explicit or implied work contents (except main structure reinforcement, concrete pouring, erection and dismantling of external frame, formwork fabrication and installation, water and electricity installation, moisture preservation and waterproofing) included in the design elevation of drawings shall be completed and accepted.
Article 4: Construction Period
1. Commencement date: year month day (subject to the notice of the project department).
2. Completion date: year month day (subject to the construction progress plan of the project department).
3. The penalty will be 1000 yuan for each day of delay in the construction period.
Article 5: Contract Price
1, plus or minus 0.000 above decoration engineering, roofing engineering, etc. The comprehensive unit price according to the construction area is 98.00 yuan/㎡.
2, masonry engineering standard layer (basement shall be calculated separately) according to the construction area of 24.00 yuan/m? , the unit price includes the secondary structure construction, calculated in real terms.
3. Temporary visa employment outside the contract 120.00 yuan/working day.
Article 6: Calculation Method of Engineering Quantity and Construction Content
1. The contract area is mainly subject to the design drawings.
2. Decoration project construction content: plastering of internal and external walls, plastering of external walls, cement mortar floor of floors, cement mortar for stair treads, wall tiles of elevator foreroom, floor tiles, backfill plastering of toilet pits, patchwork plastering of railings, plastering of roofs (except waterproofing).
3. Construction content of masonry project: concrete pouring and brick masonry of all secondary structures required by the construction drawing.
4. Construction tools and materials: the construction tools are self-care, and the construction materials include polyvinyl alcohol, steel wire mesh, insulating nails, glue, iron wire, steel nails and nails.
Article 7: Work Contents Included in the Contract Price
The work content included in the comprehensive unit price of this contract is the same as Article 3: The work content included in the project contracting scope is a one-time comprehensive lump sum price, which will not be adjusted during settlement. This comprehensive unit price also includes: labor cost, safety protection cost (safety helmet, safety belt, etc. ), labor training fees, cleaning fees, safety and civilized construction measures fees, finished product protection fees, management fees, super-high-rise fees, overtime fees, social pension planning, unemployment, work-related injuries, insurance fees, risk fees, edge sealing fees, and hole filling include the following work contents:
A, masonry engineering work content:
(1) Gymnastics scope: fabrication and installation of all masonry, including reinforced concrete lintels, including indoor and outdoor infilled walls and parapets, roof chimneys, pipeline well masonry, indoor flue wells, air wells and squat pits, as well as concrete pouring and maintenance of all installed bricks, including lintels and structural columns that are inconvenient to prefabricate, and filling and hanging holes after the installation of cast-in-place concrete doorjambs, window sills and water and electricity.
(2) Preparation: Be familiar with the construction drawings, cooperate with the construction personnel of this project for lofting, and make preparations before construction.
(3) Preparation of mortar: all the operation processes such as transportation, batching, weighing (over-bucket) and cleaning machines and tools of sand, cement and other materials.
(4) Transportation: All materials such as bricks, mortar, blocks and precast concrete are transported horizontally and vertically on site. Transportation includes laying and moving the pickup plate; Brick transportation includes watering or soaking bricks; The material transportation equipment is provided by the labor service team, and the material transportation is subject to the unified arrangement of Party A. ..
(5) Cleaning: clean the wall and floor tiles (red bricks and blocks), transport the ashes, all materials and garbage before and after construction to the place designated by Party A for classification and stacking, and wash the ground where mortar is stacked with water every day to keep the ground clean.
(6) Other work: Leave reserved holes within the scope of drawings and place embedded iron pieces; Cooperate with Party A and other work.
(7) See the technical disclosure for specific operating procedures and methods. (The technical disclosure document is a supplement to this contract document)
Second, gypsum:
(1) Construction site: plastering all internal and external walls, beams and ceilings.
(2) Construction content: erection and removal of simple plastering and scaffolding, turnover of internal and external scaffolding, cleaning and repair, wetting of base surface, nailing of steel wire mesh, shotcreting, wall hole plugging (installation of air conditioning holes, hanging holes on the ceiling of internal and external wall downpipe holes, indoor toilets, kitchens and other walls, fire box plugging, doors and windows plugging, structural reserved pay-off holes, and repeated repair in coordination with installation, etc. ).
(3) External wall tiling: cleaning and repairing, wetting the base surface, plastering and leveling in layers, typesetting and setting out, selecting bricks, sawing bricks, facing, jointing, cleaning and sweeping.
(4) Preparation of mortar: raw materials and semi-finished products are transported horizontally on the ground, and mortar components are fed, weighed, stirred and transported.
(5) Transportation: including ground transportation of raw materials and semi-finished products, as well as horizontal transportation and vertical transshipment of plastering in each floor.
(6) See the technical disclosure for specific operating procedures and methods. (The technical disclosure document is a supplement to this contract document)
Three, exterior wall decoration engineering work content:
(1) Specific scope of work: exterior wall (including outdoor courtyard wall) decoration, cleaning of each surface layer after construction, finished product protection, bamboo scaffolding turning, cleaning, repairing, wetting the surface of base course, partially chiseling away the wall surface, blocking the screw holes through the wall, caulking around doors and windows, nailing steel wire mesh, layered plastering of exterior wall, plastering, typesetting and lofting of exterior wall bricks, and selecting sawn bricks.
(2) Preparation of mortar: raw materials and semi-finished products are transported horizontally on the ground, and mortar components are fed, weighed, stirred and transported.
(3) Transportation: including the ground transportation of raw materials and semi-finished products, as well as the horizontal transportation and vertical transshipment of plastering finishes of each layer.
(4) Others: See the technical disclosure for specific operating procedures and methods. (The technical disclosure document is a supplement to this contract document)
Four, the floor work content:
(1) Cleaning, mending, wetting the surface of the base, partially planing the floor, paving the floor tiles, selecting bricks, sawing bricks, overlaying, and cleaning include mending, cleaning, sweeping, and finished product protection.
(2) Preparation of mortar: raw materials and semi-finished products are transported horizontally on the ground, and mortar components are fed, weighed, stirred and transported.
(3) Transportation: including the ground transportation of raw materials and semi-finished products, as well as the horizontal transportation and vertical transshipment of plastering finishes of each layer.
(4) See the technical disclosure for specific operating procedures and methods. (The technical disclosure document is a supplement to this contract document)
(5) Cement mortar floor includes lighting and roughening.
Five, roofing engineering work content:
(1) Specific scope of work: protective layer, moisture-retaining and heat-insulating layer of all roofs (except roof waterproof layer) in the contract building number and all bricklayers' related work in the roofing project.
(2) Cleaning, repairing and wetting of base surface and local gouging of roof structure layer, including repairing and cleaning in coordination with hydropower installation.
(3) Preparation of mortar and fine concrete: raw materials and semi-finished products are transported horizontally on the ground, and mortar and fine concrete are fed, weighed, stirred and transported.
(4) Transportation: including ground transportation and vertical transportation of raw materials and semi-finished products.
(5) See the technical disclosure for specific operating procedures and methods. (The technical disclosure document is a supplement to this contract document)
(6) Ceramsite slope leveling; Roof rigid concrete construction, steel binding, frame joint cutting.
Six, the secondary structure engineering:
The work content of the secondary structure includes: constructional column, lintel of doors and windows, small structure of edge closing, air conditioning panel structure, balcony railing structure and structures that need secondary structure construction;
(1) Reinforcement installation and binding;
(2) concrete mixing, transportation, pouring and curing;
(3) Formwork shall be manufactured, installed, dismantled, cleaned and stacked at the place designated by Party A;
(4) The installation of structural tie rods and the work required for rebar planting.
Article 8: Technical Requirements for Project Construction
1. Party A's construction technicians shall make technical disclosure to Party B, which shall be signed by Party B's representative in writing, and Party A shall provide Party B with a set of construction drawings.
2. The representative of Party B must guide the workers to carry out the construction in strict accordance with the technical disclosure and construction acceptance specifications.
3. Post-plugging of masonry shall be carried out after 7 days of wall masonry, otherwise Party B shall bear all responsibilities for quality accidents.
4. The floor is a brushed floor.
5, in strict accordance with the construction drawings and technical changes in construction, all processes should comply with the design and construction specifications.
Article 9: Responsibilities and Work of Both Parties
(I) Work of Party A:
1. Coordinate relevant working relations smoothly for Party B's construction.
2. Release the construction plan to Party B. ..
3. The builder of Party A shall arrange Party B's project progress and construction steps, guide Party B's construction, solve technical problems, and conduct quality supervision and inspection on quality and safety work.
4. Make technical disclosure to Party B as the construction basis.
(II) Work of Party B:
In the decoration work, the interior and exterior walls are plastered with one piece of material. In engineering practice, intermediate or ordinary plastering is often done first, and then a piece of material is put on the plastering layer. Then, when we smear a piece of material on the wall, do we need to paint the wall again, or do we include the amount of wall plastering in the plastering layer? We all know that if it is wall paint painting, plastering wall paint painting has a fixed purpose, that is to say, painting does not include the amount of wall plaster, please give me some advice!
1, strictly implement the time limit for a project, quality and safety requirements in this contract, obey the arrangement of the site builder, and carry out the construction in strict accordance with the construction drawings and technical disclosure and the current national construction specifications.
2. The construction shall be carried out in strict accordance with the design and construction specifications, and shall not exceed the specification requirements in the Specification for Household Acceptance of Residential Buildings. If defects left by the previous shift due to construction are found, they shall be handled by themselves if there is no response. If it is difficult to deliver the house, Party B shall bear all the responsibilities.
3. Strengthen the management of laborers, educate laborers to abide by the law, and strengthen the awareness of safety, fire prevention and theft prevention. Workers are strictly required to carry out construction operations in accordance with the safety technical operating rules of construction workers and do their own safety work well.
4. Organize civilized construction of workers and strengthen the management of the construction site. Workers are not allowed to fight and call names (safety and civilized construction regulations shall be signed separately) so as to clear the field after work.
5, do a good job of quality self-inspection, establish the idea of quality and safety first, put an end to quality and safety accidents.
6. If there are sporadic projects and sporadic employment outside the scope of the contract, Party B will unconditionally cooperate with Party A's work arrangement. If there are receiving items, both parties negotiate the price.
7. After the completion of the project, do a good job in the delivery and maintenance of the house in the later period (if it is not well maintained, Party A has the right to make other arrangements, and the expenses will be deducted from Party B's deposit).
Article 10 Project quality acceptance:
1, in strict accordance with the current national construction specifications and quality evaluation standards and household acceptance standards for acceptance. All contracted subdivisional work shall meet the qualification standards.
2, each division subdivisional work does not meet the acceptance criteria, beyond the household acceptance criteria and the deviation stipulated in the construction specification, the project rework itself, until it is qualified, its labor costs shall be borne by itself, and the lost materials shall be compensated according to the price, and the project department shall punish it.
3. If Party B fails to guarantee the technology, quality and progress of the project, fails to carry out the construction according to the procedures and causes quality problems, Party A has the right to unilaterally terminate this contract and choose another team. After the partial subdivisional work completed by Party B is accepted by the relevant units, Party B shall settle the account according to 60% of the labor cost of the contract amount (excluding any fees) and leave the site.
4. Party B has the obligation to put forward quality hidden dangers and various rationalization suggestions to Party A. ..
5. All the quality warranty of this project is 1 year, and if there are quality problems within 1 year, it is unconditionally guaranteed.
Article 1 1: settlement and payment:
1. 80% of the monthly progress of this sub-project and the task list issued by relevant personnel of the project department and Party B after joint acceptance have been paid.
2. After the completion and acceptance of all contracted projects, the final accounts shall be made, and the total loan amount (progress payment), living expenses and fines shall be deducted. Its calculation method: total project price-monthly project payment payable-withholding = final project payment.
Article 12: Other agreements:
1. During the contract period, if Party B stops work or leaves the site for no reason, and Party A refuses to pay the labor service fee (if it does not listen to the arrangement of the management personnel), the contractor shall be fully responsible for all the labor service wages of Party B ... and pay liquidated damages to Party A, and compensate Party A according to 15% of the total labor cost of the sub-project, and other economic losses caused to Party A therefrom shall be fully compensated by Party B. ..
2. Except for Party A's vertical transportation and mixer, other small tools shall be solved by Party B, and the equipment borrowed by Party A shall be kept by Party B during the construction period. If someone compensates or repairs the damage.
3. It is forbidden to subcontract some contracted projects to others, otherwise Party A has the right to terminate this contract. After the acceptance of partial projects, 60% of the completed amount shall be settled to Party B, and it shall be retired.
4. If Party B fails to meet the requirements of quality, time limit for a project and civilized construction due to the poor quality and skills of workers, and commits illegal acts, Party B's contractor shall be solely responsible for all losses caused thereby.
5. Party A shall provide accommodation for Party B. If Party B's personnel cause losses to Party A's public property, Party A shall pay compensation according to the price.
6. If Party B's construction quality reaches the first acceptance, Party A will reward 1 yuan /m? .
7. The relevant regulations, management methods and detailed rules of the Project Department and the Company are an integral part of this contract.
8. As an annex to this contract, the Measures for the Administration of Engineering Outsourcing Workers have the same legal effect and should be strictly observed and implemented.
Article 13: For matters not covered, both parties shall negotiate to form new contract terms, which shall be abided by both parties.
Article 14: This contract is made in quadruplicate, with each party holding two copies, all of which have the same legal effect. It will take effect after being signed by both parties. After the project is completed and accepted, the balance will be settled according to the contract, which will naturally become invalid.
Party A: Party B:
Tel: Tel:
Signature time:
Labor internal contract II
Party A:
Party B:
Based on the principles of voluntariness, equality and good faith, Party A and Party B sign the following contract for this project:
Article 1: Project Overview
1, project name: fire protection project of Tianhong Ruiyuan Community in Wuhai City
2. Project site; Haibowan, Wuhai City
3. Project content; Fire engineering underground parking lot.
Article 2: the scope of the contract; The contractor does not include materials, including smoke control and ventilation systems. Mainly based on the effective drawing facilities provided by Party A .. The blueprint is not designed, and it shall be implemented according to the fire control acceptance standard.
Article 3: Quality Requirements
This project is qualified by the quality inspection station.
Article 4: Contract Price and Calculation Method
1, price and calculation method:
Underground part: the smoke control part is calculated by galvanized iron sheet per square meter, and the 37 yuan per square meter (including valve part). The calculation method of fan installation fee is based on #65 yuan (including auxiliary materials).
2. Payment method: Party A shall pay the daily living expenses before calculating the engineering quantity, but it shall not exceed 65,438+00% of the existing engineering quantity; Party A shall pay 65% of the existing quantity every month after measurement; 80% of the total amount after all underwriting work is completed and qualified; 95% of the total project price shall be paid after the completion acceptance, and the remaining 5% shall be used as the quality guarantee, which shall be paid in one lump sum within one month after the quality guarantee expires.
Article 5: Safety
1. Party B must set up special safety officers at the construction site to cooperate with Party A's management personnel to conduct uninterrupted comprehensive inspection and management of the quality and safety of the construction site.
2. If Party B's management is not in place or fails to operate according to relevant safety operation regulations, all casualties caused thereby shall be borne by Party B. ..
Article 6: Insurance
1. Party A shall uniformly handle work-related injury insurance for the construction personnel entering the site, and the expenses shall be paid by Party B..
Article 7: Obligations of Party A
1. Provide the contractor with construction site, water source and power supply with construction conditions, and the expenses shall be borne by Party A. ..
2, responsible for coordinating the relationship between design, supervision and field work.
3, responsible for the management and supervision of the contractor's engineering quality and safety work.
4. Be responsible for other work that Party A should do.
Article 8: Obligations of Party B
1. Be responsible to the contractor for the engineering quality within the scope contracted by Party A in this contract, and organize skilled workers with corresponding qualification certificates to work at their posts; Without the authorization or permission of Party A, it is not allowed to establish working relationship with the construction unit and relevant departments without authorization; Consciously abide by laws and regulations and relevant rules and regulations;
2. Party B shall submit the construction plan to Party A according to the requirements of the overall progress plan of the construction organization design, and submit the ten-day and weekly construction plans required by Party A when necessary, and complete the labor arrangement plan corresponding to the above construction plans by stages and time periods, which shall be strictly implemented after being approved by Party A;
3. Carefully organize the construction in strict accordance with the design drawings, construction acceptance specifications, relevant technical requirements and construction organization design to ensure that the project quality meets the agreed standards; Scientifically arrange the operation plan and invest enough manpower and material resources to ensure the construction period; Strengthen safety education, conscientiously implement safety technical specifications, strictly abide by the safety system, and implement safety measures to ensure construction safety; Strengthen site management, strictly implement the management regulations of the competent construction department and relevant departments of environmental protection, fire protection and health on the construction site, and achieve civilized construction; Bear the loss compensation and all kinds of fines caused by quality modification, rework, construction delay, safety accidents, messy site and so on.
4. Consciously accept the management, supervision and inspection of Party A and relevant departments; Accept Party A's inspection of the valid certificates and certificates of its operators at any time; Coordinate with other units on site and take the overall situation into consideration.
5. Stack materials, machines and tools according to Party A's unified planning, set up signs according to Party A's standardized site requirements, manage the living quarters well, and do a good job in public security in their own responsibility areas;
6. Keep and reasonably use the machines, tools and other facilities provided or leased by Party A to Party B, and compensate the losses according to the price.
7. Party B shall obey the instructions of the representative of the construction unit and the supervision engineer handed over by Party A. ..
8. Unless otherwise agreed in this contract, Party B shall be responsible for the implementation and completion of its operation contents.
Article 9: Acceptance
1. Party B shall ensure that the quality of the completed project meets the quality standards agreed in this contract. After the construction is completed, Party B shall submit the completion report to Party A and notify Party A for acceptance. Party A shall, within 7 days after receiving Party B's above-mentioned report, check and accept Party B's construction achievements. However, if the acceptance results of concealed works between Party A and Party B or the completion acceptance results show that Party B's construction quality is unqualified, Party B shall be responsible for free repair, without extending the construction period, and bear the relevant losses caused to Party A therefrom.
Article 10: Liability for breach of contract
1. If Party B fails to implement it according to Party A's schedule, Party B shall pay Party A a penalty of 5,000 yuan for each day of delay.
2. If Party B's safe production and civilized construction can't reach the level agreed in this contract, Party B shall bear the penalty of 5% of the contract cost, and pay additional compensation of 15% of the total contract cost to Party A;
3. When one party breaches the contract and the other party requests the breaching party to continue to perform the contract, the breaching party shall continue to perform the contract after assuming the above liabilities for breach of contract.
4. If Party A breaches the contract, it shall bear the losses for breach of contract, and the construction period shall be postponed accordingly.
Article 1 1: Disputes
1. In case of any dispute during the performance of this contract, both parties can mediate by themselves. If mediation fails, both parties agree to bring a lawsuit to the people's court of Haibowan District, Wuhai City.
Article 12: Warranty
1. After the acceptance of the project, Party B's agreement on the construction quality, warranty period and warranty fund of the contracted project: the warranty period shall be implemented in accordance with relevant national regulations; The warranty money shall be kept at 5% of the total project amount, and shall be paid without interest at maturity.
Article 13: Number of Contract Copies
This contract is made in duplicate, one for each party. It shall come into effect after being signed by representatives of both parties and audited and sealed by Party A. ..
Supplementary terms:
Permanent Representative of Party A: Tel: Permanent Representative of Party B:
Party A (employer) (official seal): Party B (contractor) (official seal):
Domicile: domicile:
Legal representative:
Authorized Agent: Authorized Agent:
Fax: Fax:
Bank of deposit: Bank of deposit:
Account number: Account number:
Labor internal contract 3
Party A: (hereinafter referred to as Party A)
Party B: (hereinafter referred to as Party B)
In order to ensure the smooth completion of the construction project of Gulei City House (No.5 plot) undertaken by Party A, Party A and Party B reached an agreement on the water and electricity service contracting of Gulei City House (No.5 plot) construction project based on the principles of equality, voluntariness and mutual benefit in accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant regulations.
I. Overview of the Project:
Project Name: Gu Lei Residential Construction Project (No.5 Plot)
Project address: Gulei Town, Beichuan County
Engineering structure: brick-concrete structure with bottom frame
Construction area: about 320 ㎡ (based on the actual completed area) Contract duration: 120 days (commencement date: 20_ year, completion date: 20_ year), and the construction period will be postponed except for natural disasters that are irresistible to human beings. Quality grade: it is qualified according to the current national construction quality standards and meets the acceptance standards of the owners' committee.
Second, the contracting method and scope of work:
1. Party B is responsible for all temporary water and electricity consumption of the main project and all water, electricity and lightning protection services shown in the drawings of this project.
2. The machines and materials used by Party B are within the scope of the contract (including covered electrode and welding machine).
Third, the project cost and payment method:
1. According to the actual completed area, the lump sum unit price is 18 yuan/m2.
2, the project installment:
(1): 20% of the total paid price for the foundation works, 20% for the first floor, 20% for the second floor and 20% for the main works.
(2): The balance shall be settled within 30 days after the completion of project acceptance.
Fourth, the quality requirements:
1, the engineering quality requirements are qualified, and the quality grade is evaluated by the engineering quality inspector according to the national acceptance standard, reaching the acceptance standard recognized by the quality inspection station, the construction unit, the supervision unit and the owner (the measured points reach more than 80% for qualification).
2. If Party B's construction quality does not meet the quality standards, it must be reworked to meet the standards, and all expenses during this period shall be borne by Party B;
Five, the time limit for a project guarantee:
Party B shall ensure that the contents of the construction contract are completed according to the contract time limit, and shall not delay the construction time limit without reason due to the scope of the contract. Otherwise, it shall be calculated according to the time limit for a project delay loss fee of 500 yuan/day. If Party B completes the construction task ahead of schedule with good quality and quantity, Party A will reward Party B with 500 yuan/day. (Except for design changes and natural disasters caused by force majeure)
The responsibility of party a and party b with intransitive verbs
1. Party A shall provide the engineering materials needed for this project in time.
2. If there is any difference between the drawings and the original drawings, Party A shall calculate the quantity of work increased by Party B (if it is necessary to make changes after construction, Party A shall confirm the cost of rework).
3. Party B shall stick to the site 24 hours a day, and ask for leave from the person in charge of Party A's management under special circumstances.
4. Party B must obey the management regulations of all departments of Party A, ensure the stability of the team and do a good job in the ideological work of workers. If any workers make trouble in Party A or government departments, Party B will fine 20 yuan every time.
5. Party B shall carry out the construction in strict accordance with the drawings, relevant laws and regulations and construction specifications.
6. Party B shall carry out real-name management of the construction personnel according to Party A's rules and regulations, register the construction personnel and related materials, and report them to the relevant management departments of Party A for the record.
7. If Party B does not obey Party A's arrangement, and the progress, quality and safety can't meet the requirements of construction specifications, Party A has the right to order Party B to make rectification, and if serious consequences are caused, Party A has the right to order Party B to leave the site, and not to calculate all the quantities of illegal buildings.
8. Under normal circumstances, if Party B withdraws or has unfinished projects, the unfinished project quantity will be deducted from the project quantity by 3 times of the contract unit price. On the other hand, if Party A or other reasons force Party B to leave his post, the work done by Party B shall be calculated to Party B at one time and bear the corresponding economic losses, and Party B's service fee shall not be deducted for any reason.
9. Party B shall not employ/kloc-children under 8 years old and disabled people over 55 years old.
10. During the construction period, Party B shall not waste Party A's materials at will so as to clean up the site after the construction. Those who waste materials beyond the construction drawing budget shall be compensated and punished according to the corresponding price.
Seven. Liability for breach of contract:
Party A shall guarantee the required materials according to the plan put forward by Party B. If Party A fails to provide the required materials in time, it will stop work for materials, and all expenses caused by the shutdown will be borne by Party A, and the construction period will be postponed. If either party breaches the contract, it shall compensate the observant party for a penalty of 5% of the total price.
Eight. Matters not covered in this contract shall be settled by both parties through friendly negotiation. This contract is made in duplicate, one for each party, and shall come into effect after being signed and sealed by both parties. And * * * are compliant and have the same legal effect.
Representative of Party A (signature and seal): Party B (signature and seal):
ID number: ID number:
Tel: Tel:
date month year
Three related clauses of labor internal contract:
★ The last three internal contracts of the project.
★ 3 Internal contract management contract
★ 3 Project internal contract standards
★ Internal Contract of Model Workers (3)
★ The latest three model clauses of the company's internal contract management contract.
★ Three latest internal construction contracts.
★ 3 copies of the company's internal contract model.
★ 3 samples of internal economic contracts
★ Internal Contract of Model Workers (2)
★ Sample of Internal Contract for Construction Services (2)