Quality assurance measures of greenhouse engineering
Engineering quality assurance system diagram
Section 1 Quality Management Objectives
Quality management objectives
The qualified rate of sectional works is 100%, and the excellent rate is 90%.
Division project qualification rate
Sub-projects such as foundation and foundation, main structure, decoration engineering, electrical installation, water heating installation and steel roof truss installation are guaranteed to be excellent.
The unit project is excellent.
The scoring rate of visual quality is over 85%.
The technical information is basically complete.
Section 2 Quality Assurance Measures
On-site personnel with high professional level, strong sense of responsibility and rich construction experience are selected to form the project team.
Choose a construction team that cooperates with our unit for a long time and forms an organizational system, and has experience in creating high-quality projects. At the same time, according to the progress of the project image, the required labor force can be mobilized at any time within the city.
Hierarchical management, layer by layer, the implementation of total quality management, strengthen the quality control of each link in the construction process. The management and the service layer should conduct counterpart disclosure, counterpart management and counterpart control.
Conscientiously implement the enterprise quality assurance system and adhere to the procedural, standardized and standardized construction.
Strictly implement the inspection and acceptance system at all levels, and its specific operation flow: after each sub-project (or process) is completed, the team leader will conduct self-inspection. After passing the self-inspection, the monitor and team leader shall report to the technical department and the quality inspector for inspection and acceptance. After passing the inspection, fill in the inspection records and inspection evaluation forms and report them to the chief engineer of the quality supervision group for inspection. After passing the inspection, the quality inspector will fill in the inspection form and submit the relevant construction technical data to the supervision unit for final verification. After verification, the supervision engineer shall issue corresponding construction instructions. After receiving the written instruction from the supervision engineer, each team will proceed to the next working procedure.
At the end of the subdivisional work (or process) that has not passed the inspection or acceptance, the next process is prohibited. Otherwise, the necessary punishment will be given to the parties according to the relevant rewards and punishments on site. After the approval of the technical director in charge, the engineering technology team will handle or rework the subdivisional work. Never allow the project to leave quality hidden dangers.
If the sub-project fails to pass the inspection and supervision, the operation team leader will personally guide the relevant team to repair it, and then re-apply for inspection and go through the relevant visa procedures until it is qualified.
On-site construction management personnel of various ministries, including project managers, engineers, technical directors and quality inspectors. Be familiar with all design drawings and requirements, negotiate changes, and assist the construction unit to do a good job in design technical disclosure and blue prints.the design.
Managers of various ministries, especially technical directors, are familiar with relevant construction technical specifications, procedures, process standards and regulations according to their own business scope.
The Engineering and Technical Quality Inspection Department shall provide technical disclosure of construction organization design to relevant construction managers and construction team leaders, teams and team leaders, so as to ensure that managers at all levels understand and master the construction scheme, technical requirements, engineering quality standards, construction period and schedule of various technical measures.
For the key parts and important factors affecting quality, organize professionals to tackle key technical problems, and conduct special monitoring according to special procedures during construction.
Emphasis on "model system" in construction. After the completion of the model project, the large-scale construction will be carried out after the acceptance of Party A, design, supervision and Party B.
Strictly control the quality of all kinds of raw materials, outsourced products and other equipment in engineering construction. After all kinds of equipment enter the site, they shall be rechecked and rechecked according to the relevant provisions of the Municipal Construction Committee and the Municipal Supervision Station. All materials or products that fail to pass the re-inspection and re-inspection are strictly prohibited for engineering construction and installation, and should be removed from the scene in time to avoid misuse.
In strict accordance with the "quality inspection system" stipulated by the site, the sub-projects shall not be exempted from inspection for any reason or excuse.
Do a good job in site construction test, focusing on weld inspection, boiler and pipeline debugging, concrete block production, pressure test, witness sampling, roofing and waterproof layer paving and leakage test.
Do a good job in the collection and collation of construction technical data. The data compilation shall be timely, accurate, true and complete, and shall not be supplemented synchronously with the progress of the project.
On-site measuring instruments and measuring equipment shall be calibrated according to the specified period. In actual operation, the measurement should be accurate, the surveyors should always check the use of equipment and make records in time, and the surveyors should hold relevant certificates.
It is necessary to seriously promote the application of new materials, new technologies and new processes, raise the construction technology to a new level, and actively promote the new technologies that are mainly promoted by the Ministry of Construction and suitable for this project.
Efforts should be made to avoid planing the main structure, and professionals in civil engineering, plumbing and steel structure should be organized to check the drawings. If there are contradictions or omissions in the drawings, it is necessary to negotiate with the design in advance.
Implement finished product protection measures, arrange special personnel to inspect and supervise the implementation, and ensure the integrity of finished products.
Establish and improve the "reward and punishment system" for on-site technical quality.