The specific problems and regulatory requirements of this 14 case, which was initially verified, are hereby announced as follows:
Hefei Economic and Technological Development Zone 1
Question: Hefei Economic and Technological Development Zone is a state-level development zone with 342 production enterprises. Development Zone Construction and Development Bureau is suspected of ultra vires approval of construction projects. The construction of supporting pipe network is slow, and most of the wastewater generated by enterprises in the development zone does not enter the completed urban sewage treatment plant and is directly discharged into the tributary of Chaohu Lake. All enterprises failed to pay sewage charges according to law.
Supervision requirements: please ask Anhui Environmental Protection Bureau to urge Hefei Municipal Government to order the development zone to complete the planning environmental assessment within a time limit and improve the urban sewage treatment plant pipe network according to the requirements of the provincial government; Instruct Hefei Environmental Protection Bureau to order enterprises that have not gone through the EIA approval procedures and environmental protection "three simultaneities" acceptance to stop production and rectify, and comprehensively levy sewage charges. The Anhui Provincial Supervision Department, together with relevant departments, is requested to investigate and deal with the performance of duties by local governments and regulatory authorities. The handling opinions shall be implemented after being approved by the two ministries and bureaus.
2. Nanning Economic and Technological Development Zone
Question: Nanning Economic and Technological Development Zone is a national development zone. Of the 72 construction projects approved by the Development Zone Environmental Protection Bureau since 2003, 24 have not gone through the "three simultaneities" acceptance procedures for environmental protection; Except for two municipal enterprises, no other enterprises have paid sewage charges according to law. The Environmental Protection Bureau of Nanning Economic and Technological Development Zone verbally agreed that Guangxi Jinkai Edible Phosphorus Chemical Co., Ltd. will produce 60,000 tons of phosphoric acid annually for one and a half years. The company's production wastewater failed to be reused by 65,438+000% according to the requirements of EIA approval, and failed to meet the environmental protection "three simultaneities" acceptance requirements. The environmental protection bureau of the development zone has failed to supervise the construction projects of the park. Supervision requirements: Please ask the Environmental Protection Bureau of Guangxi Zhuang Autonomous Region to urge the Nanning Municipal Government to rationalize the environmental supervision system of the development zone, and order the enterprises in the development zone that have not passed the "three simultaneities" acceptance of environmental protection and Guangxi Jinkai Edible Phosphorus Chemical Co., Ltd. to stop production and rectify, and resume production only after the environmental protection department has passed the acceptance; Instruct Nanning Environmental Protection Bureau to comprehensively collect sewage charges according to law. The Supervision Department of Guangxi Zhuang Autonomous Region shall, jointly with relevant departments, investigate and deal with the behavior of local governments and supervision departments in performing their duties. The handling opinions shall be implemented after being approved by the two ministries and bureaus.
3.Xi Economic and Technological Development Zone
Question: Xi Economic and Technological Development Zone is a national development zone with 324 construction projects. Development Zone Management Committee is suspected of ultra vires approval of construction projects. Development Zone Management Committee can only provide 15 environmental protection "three simultaneities" acceptance data for construction projects. The wastewater from enterprises in the development zone is directly discharged into the Weihe River through the urban sewage pipe network. Supervision requirements: Shaanxi Environmental Protection Bureau is required to organize a comprehensive clean-up of the construction projects approved and accepted by the xi 'an Economic Development Zone Management Committee, and make rectification according to law; Urge the Xi government to formulate a feasible plan, build a sewage treatment plant within a time limit, and improve the pollution prevention facilities of enterprises in the park. The Shaanxi Provincial Supervision Department, together with relevant departments, is requested to investigate and deal with the performance of duties by local governments and regulatory authorities. The handling opinions shall be implemented after being approved by the two ministries and bureaus.
4. Hancheng Longmen Ecological Industrial Park in Weinan City
Question: hancheng city Longmen Circular Economy Ecological Demonstration Park was built in 2004, which is a provincial circular economy ecological demonstration park. * * * There are 23 construction projects/kloc-0, of which 42 projects such as cement and coking do not meet the industrial policy requirements of the Guidance Catalogue for Industrial Structure Adjustment (2005 edition), and the pollution is serious. The full collection rate of sewage charges of enterprises in the park is less than 30%. Supervision requirements: Please ask Shaanxi Environmental Protection Bureau to urge Weinan Municipal Government to ban and close enterprises that do not meet the national industrial policy within a time limit and complete the environmental impact assessment of park planning within a time limit. Instruct Weinan Environmental Protection Bureau to order enterprises in the park to go through the EIA approval procedures; Enterprises that fail to meet the "three simultaneities" of environmental protection can stop production and rectify, and can resume production only after passing the acceptance of environmental protection departments; Comprehensive collection of sewage charges according to law. The Shaanxi Provincial Supervision Department, together with relevant departments, is requested to investigate and deal with the performance of duties by local governments and regulatory authorities. The handling opinions shall be implemented after being approved by the two ministries and bureaus.
5. Ferroalloy production enterprises in Guanyang County and quanzhou county, Guangxi Zhuang Autonomous Region.
Question: After preliminary investigation, 44 submerged arc furnaces of 23 ferroalloy production enterprises in Guanyang County and 36 ferroalloy production enterprises in quanzhou county did not meet the requirements of industrial policy. All enterprises have not gone through the EIA approval and environmental protection "three simultaneities" acceptance procedures, and there are no environmental protection treatment facilities, resulting in serious pollution. Supervision requirements: Please ask the Environmental Protection Bureau of Guangxi Zhuang Autonomous Region to urge the Guilin Municipal Government to ban and close enterprises in Guanyang County and quanzhou county that do not meet the national industrial policy within a time limit; Instruct Guilin Environmental Protection Bureau to order enterprises that comply with industrial policies and have not gone through the EIA approval procedures and environmental protection "three simultaneities" acceptance procedures to stop production and rectify, and resume production only after the environmental protection department has passed the acceptance. The Supervision Department of Guangxi Zhuang Autonomous Region shall, jointly with relevant departments, investigate and deal with the behavior of local governments and supervision departments in performing their duties. The handling opinions shall be implemented after being approved by the two ministries and bureaus.
6. Anhui Bayi Chemical Co., Ltd.
Problem: The nitrochlorobenzene and p-aminophenol projects of Bengbu Anhui Bayi Chemical Co., Ltd. were put into operation in 2005, and no supporting pollution control facilities were built. Production wastewater is directly discharged through three sewage outlets, and the discharged wastewater COD, benzene and toluene all exceed the standard seriously, and the sewage charges are in arrears for a long time. Supervision requirements: please ask Anhui Environmental Protection Bureau to urge Bengbu Municipal Government to order Bayi Chemical Co., Ltd. to stop production and rectify, and resume production only after the environmental protection department has passed the acceptance; Bengbu Environmental Protection Bureau was ordered to recover sewage charges according to law. Please ask the Anhui Provincial Supervision Department to investigate and deal with the enterprise's compliance with environmental laws and regulations in conjunction with relevant departments; Investigate and deal with the performance of local governments and regulatory authorities. The handling opinions shall be implemented after being approved by the two ministries and bureaus.
7. He Xin Paper Mill in Dancheng, Zhoukou City
Question: Dancheng Hexin Paper Mill is a private enterprise, which was completed and put into operation in 2006. It uses jet blasting to make paper, with an annual output of 36,000 tons. After inspection, the factory exceeded the trial production period, did not apply to the environmental protection department for environmental protection "three simultaneities" acceptance, the sewage treatment pool leaked seriously, the factory area did not have any anti-seepage measures, and the sewage was directly discharged into the puddle, which seriously exceeded the standard. Supervision requirements: Please ask Henan Environmental Protection Bureau to urge Zhoukou Municipal Government to order Dancheng Hexin Paper Mill to stop production and rectify, properly dispose of seepage pit sewage, and resume production only after the environmental protection department has passed the acceptance; Zhoukou Environmental Protection Bureau was ordered to recover sewage charges according to law. The Henan Provincial Supervision Department, together with relevant departments, is requested to investigate and deal with the performance of duties by local governments and regulatory authorities. The handling opinions shall be implemented after being approved by the two ministries and bureaus.
8 Kaifeng Yongda Chemical Co., Ltd.
Question: Kaifeng Yongda Chemical Co., Ltd. is a joint-stock enterprise, which was merged by Kaifeng Yongmei Group in early 2007, with an annual output of 50,000 tons of ammonium bicarbonate. After inspection, the technical transformation project of the company's liquid ammonia plant did not go through the EIA approval procedures, the company had no sewage treatment facilities, the production wastewater was discharged directly, and the ammonia nitrogen seriously exceeded the standard. Supervision requirements: Please ask Henan Environmental Protection Bureau to urge Kaifeng Municipal Government to order Kaifeng Yongda Chemical Co., Ltd. to stop production and rectify, and resume production only after it is accepted by the environmental protection department; Kaifeng Environmental Protection Bureau was ordered to recover sewage charges according to law. The Henan Provincial Supervision Department, together with relevant departments, is requested to investigate and deal with the performance of duties by local governments and regulatory authorities. The handling opinions shall be implemented after being approved by the two ministries and bureaus.
Nanning nannan aluminum co., ltd.
Problem: The aluminum profile expansion project of Nannan Aluminum Co., Ltd. was put into production without additional sewage treatment facilities according to the requirements of EIA approval. The dosing device of the company's comprehensive sewage treatment station has been idle for a long time, and a gate is set next to the treatment facility to directly discharge wastewater, which seriously exceeds the standard.
Supervision requirements: Please ask the Environmental Protection Bureau of Guangxi Zhuang Autonomous Region to urge the Nanning Municipal Government to order Nannan Aluminum Co., Ltd. to stop production and rectify, improve pollution control facilities, and resume production only after passing the acceptance of the environmental protection department; Nanning Environmental Protection Bureau was ordered to recover sewage charges according to law. The Supervision Department of Guangxi Zhuang Autonomous Region shall, jointly with relevant departments, investigate and deal with the behavior of local governments and supervision departments in performing their duties. The handling opinions shall be implemented after being approved by the two ministries and bureaus.
10, Liuzhou Nonferrous Smelting Co., Ltd.
Problem: The pH value, total zinc, total lead, total cadmium and other pollutants in the wastewater outlet and rainwater outlet of the sewage treatment station of Liuzhou Nonferrous Smelting Co., Ltd. seriously exceeded the standard. The company's hazardous waste has no "three prevention" measures, and it is dumped at will, resulting in chaotic management.
Supervision requirements: Please ask the Environmental Protection Bureau of Guangxi Zhuang Autonomous Region to urge Liuzhou Municipal Government to order Liuzhou Nonferrous Metallurgy Co., Ltd. to stop production and rectify, and resume production only after passing the acceptance by the environmental protection department; Liuzhou Environmental Protection Bureau was ordered to recover enterprise sewage charges according to law. The Supervision Department of Guangxi Zhuang Autonomous Region shall, jointly with relevant departments, investigate and deal with the behavior of local governments and supervision departments in performing their duties. The handling opinions shall be implemented after being approved by the two ministries and bureaus.
1 1, Zigong Shunwei Phosphorus Chemical Co., Ltd., Sichuan.
Problems: Fushun Shunwei Phosphorus Chemical Co., Ltd. in Zigong City began to expand the sulfuric acid project after being acquired in 2005, and did not go through the "three simultaneities" procedures of environmental impact assessment and environmental protection. The pollution control facilities were not matched, and the sewage discharge seriously exceeded the standard. The company installed submersible pumps to directly discharge sewage and sludge into Fuxi River, a tributary of Tuojiang River, which has been in arrears for a long time. Supervision requirements: please ask Sichuan Environmental Protection Bureau to urge Zigong Municipal Government to order Fushun Shunwei Phosphorus Chemical Co., Ltd. to stop production and rectify, and resume production only after it is accepted by the environmental protection department; Zigong Environmental Protection Bureau was ordered to recover sewage charges according to law. The Sichuan Provincial Supervision Department, together with relevant departments, is requested to investigate and deal with the performance of duties by local governments and regulatory authorities. The handling opinions shall be implemented after being approved by the two ministries and bureaus.
12, Sichuan Tianzhu bamboo resources development co., ltd.
Problems: The wastewater from the white mud sedimentation tank of alkali recovery unit of Yibin Tianzhu Bamboo Resources Development Co., Ltd. is discharged directly into the Yangtze River without treatment. The sewage treatment station is not operating normally, and biochemical sludge is secretly discharged by using concealed pipes.
Supervision requirements: please ask Sichuan Environmental Protection Bureau to urge Yibin Municipal Government to order Tianzhu Bamboo Resources Development Co., Ltd. to stop production and rectify, and resume production only after it is accepted by the environmental protection department; Supervise Yibin Environmental Protection Bureau to recover sewage charges according to law. The Sichuan Provincial Supervision Department, together with relevant departments, is requested to investigate and deal with the performance of duties by local governments and regulatory authorities. The handling opinions shall be implemented after being approved by the two ministries and bureaus.
13, Weinan Fuping aorong paper co., ltd.
Question: Fuping Aorong Paper Co., Ltd., a pulp and paper enterprise, was established in 2002 with a production scale of 37,000 tons/year. Failing to pass the "three simultaneities" acceptance of environmental protection, the company stopped using the sewage treatment facilities without authorization and discharged the production wastewater into the wasteland (the company purchased the right to use the wasteland 20 meters wide and about 5 kilometers long downstream of the factory), which seriously exceeded the standard. Supervision requirements: please ask Shaanxi Environmental Protection Bureau to urge Weinan Municipal Government to order Fuping Aorong Paper Co., Ltd. to stop production and rectify, and resume production only after passing the acceptance of environmental protection department; Weinan Environmental Protection Bureau was ordered to recover sewage charges according to law. The Shaanxi Provincial Supervision Department, together with relevant departments, is requested to investigate and deal with the performance of duties by local governments and regulatory authorities. The handling opinions shall be implemented after being approved by the two ministries and bureaus.
14, Pucheng Sanhe Bora Paper Mill
Question: Pucheng Sanhe Bora Paper Mill is a recycled paper manufacturer, which was built in 200 1 with a production scale of 30,000 tons/year. The environmental impact assessment approval and environmental protection "three simultaneities" acceptance procedures were not handled, and there were no sewage treatment facilities. The production wastewater was directly discharged into six sewage tanks designed by ourselves, which seriously exceeded the standard. Supervision requirements: request Shaanxi Environmental Protection Bureau to urge Weinan Municipal Government to order pucheng county Sanhe Baolai Paper Mill to stop production and rectify, and resume production only after the environmental protection department has passed the acceptance; Weinan Environmental Protection Bureau was ordered to recover sewage charges according to law. The Shaanxi Provincial Supervision Department, together with relevant departments, is requested to investigate and deal with the performance of duties by local governments and regulatory authorities. The handling opinions shall be implemented after being approved by the two ministries and bureaus.