When signing a construction contract, we must abide by national laws and conform to national policies. In case of any dispute arising from this contract, both parties shall first negotiate amicably. If negotiation fails, a lawsuit may be brought to the people's court where the contract is signed. Are you looking for and preparing to write a model contract for water, electricity and fire protection? I have collected relevant information below for your reference!
Demonstration contract of hydropower and fire fighting contracting construction 1
Employer (hereinafter referred to as Party A):
The Employer (hereinafter referred to as Party B):
After consultation, Party A and Party B sign the following agreement on Party A entrusting Party B to build _ _ _ _ _ greening project:
I. Overview of the Project
1. Project name: _ _ _ _ Greening Project.
2. Project location: _ _ _ _ _ _.
3. Construction scope: green area of _ _ _ square meters (see green design for details). The above-mentioned projects are carried out according to the requirements of drawings jointly reviewed by both parties and the items, specifications, remarks, quantities and requirements listed in the attached budget summary table.
Second, the construction period
1. Commencement date: The project duration is * * * days to * * days.
2. During the construction period, the construction period may be postponed due to water stoppage, power failure, heavy rain, rainstorm days, etc. or confirmed by Party A in writing.
3. If Party A fails to hand over the construction site in time, the construction period will be postponed.
Third, the project contract price
Through negotiation, the total contract price of this contract is RMB Yuan only. During the construction, if Party A needs to increase the project due to the change, the settlement shall be made according to the actual situation.
Fourth, the construction mode.
1. Party B shall contract and package the materials for the greening project; Package quality, package acceptance, package safety, package construction period and package civilized construction.
2. During the construction period, Party A shall be responsible for Party B's construction water and electricity consumption.
V. Payment method of project funds
1. Within 3 days after the signing of this contract, Party A shall pay Party B a deposit of 30% of the contract price, that is, RMB 10,000 Yuan only. Party B will arrange personnel to enter the site for construction the next day after receiving the payment.
2. After the project is completed, Party A shall pay Party B 60% of the contract price of the project within 3 days, that is, RMB 10,000 Yuan only.
3. Pay Party B 65,438+00% of the contract price of this project within one month after the completion acceptance, that is, RMB ten thousand Yuan only.
4. The taxes and fees required for the project have been included in the project cost and paid by Party B. ..
Six, engineering quality requirements
1. Party B must carry out the construction in strict accordance with the contents and requirements of the design and construction drawings approved by Party A and the relevant landscaping construction specifications.
2. In the process of construction, Party B must obey the supervision and management of Party A. If it is found that Party B does not meet the requirements of the construction drawings and violates the operation specifications, Party A has the right to propose and require rework and modification, and all economic losses caused by its shutdown and rework shall be borne by Party B. ..
Seven, project completion acceptance settlement
Party B shall notify Party A within three days after completion, and Party A shall organize acceptance within five days after receiving the notice, and give qualified recognition or put forward rectification opinions according to the design and construction drawings and contracts within five days after acceptance. After the acceptance, Party A shall settle the account according to the contract and the list of additional project visas, and complete the settlement within 30 working days.
Eight. Liability for delaying breach of contract
Party B must ensure the quality and quantity within the construction period and complete the project on schedule. If the project is delayed, 200 yuan will be fined for each day of delay; If the project is delayed due to Party A's responsibility or force majeure, Party B shall make a written request, and Party A shall confirm in writing that the construction period can be extended within three days. If Party A fails to make payment according to the contract, and the payment is overdue for three days, Party B has the right to stop work or close the completed project, and Party A shall be responsible for the construction delay and economic losses caused thereby.
Nine. defects liability period
1. Party B shall complete the construction tasks with good quality and quantity, on schedule and safely according to the construction drawings. Three months after the completion acceptance is the maintenance period of greening planting, and Party B shall be responsible for the quality problems during the maintenance period.
2. During the construction period, Party B must do a good job in safety production prevention, implement various safety measures, ensure construction safety, assume the responsibility for safety construction, and educate construction personnel to abide by the law.
3. Party A shall be responsible for providing Party B with the construction site (which shall meet the requirements of three links and one leveling), the location of water and electricity within the construction scope, the location of survey baseline and leveling points, and the underground pipe network map in the construction site three days before the commencement of construction. If Party A fails to provide the construction site in time, Party B has the right to postpone the construction period.
4. Party A is responsible for coordinating the relationship between construction sites and ensuring the construction progress of Party B. ..
5. After the project is completed, Party B is responsible for cleaning up the garbage within the construction scope so as to clean up the site after work.
X. entry into force and termination of the contract
This contract shall come into effect after being signed and sealed by the representatives of both parties. Upon the expiration of the project warranty period, this contract shall be terminated after Party A settles the payment.
XI。 This contract is made in duplicate, one for each party, with the same legal effect.
Matters not covered in the performance of the contract shall be settled through negotiation as far as possible. Relevant agreements can be countersigned, and the countersigned agreement has the same legal effect as this contract.
Representative of Party A: _ _ _ _ _ _ _
Date of signature: _ _ _ _ _ _ _
Representative of Party B: _ _ _ _ _ _ _
Date of signature: _ _ _ _ _ _ _
Demonstration contract of hydropower fire fighting contracting construction II
Party A: (hereinafter referred to as Party A)
Party B: (hereinafter referred to as Party B)
In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC), the Measures for the Administration of Agricultural Capital Construction Projects, the Measures for the Administration of Rural Biogas Project Construction Funds, the Regulations on Rural Renewable Energy in Hunan Province and other relevant laws and administrative regulations, and following the principles of equality, voluntariness, fairness, honesty and credibility, Party A and Party B entered into a construction contract for this project through full consultation.
I. Overview of the Project
1, project name:.
2. Project location:
Second, the way and scope of project contracting
1. Contracting method: Party B will contract the construction of this project by contracting for work and materials.
2. Project scope: All the project contents within the construction scope, including equipment installation and debugging, agreed by both parties through consultation, according to the project in the construction drawings designed by _ _ _ _. Ensure the normal operation and carry out the construction according to the technical indicators required by the design.
Third, the contract cost.
General contracting cost of the project: RMB: Yuan; Rmb Yuan only: RMB Yuan only. In case of engineering change during construction, the changed project shall be settled according to the actual quantities of the comprehensive unit price division project in the bidding documents; For partial projects with no comprehensive unit price in the bidding documents, the labor cost and machinery cost shall be determined according to the bidding documents; The prices of main materials should be quoted by themselves in the bidding documents. If there is no self-quotation, the guidance price or market price for the same period should be adopted.
Fourth, the project quality
1. During the construction of this project, Party B shall carry out the construction in strict accordance with the agricultural industry standard of the People's Republic of China "Technical Specification for Construction and Acceptance of Biogas Engineering" to ensure the engineering quality is qualified.
2. During the construction of this project, all raw materials (except ground materials) and equipment used in civil engineering and equipment installation must be qualified. Equipment and raw materials without product certificate are strictly prohibited in this project.
Verb (abbreviation of verb) payment method
Within 65,438+05 days after Party B's personnel enter the site, Party A shall pay 30% of the project reserve to Party B in advance, and the project progress payment shall be paid to 85% according to the actual completed quantities. The examination and approval of each project progress payment shall not exceed three days. Except for the 5% quality guarantee, other payments shall be paid by Party A within 15 days from the date of acceptance of the project. The warranty period of the project is one year, counting from the date when Party A passes the acceptance.
Sixth, the construction period
After Party A and Party B sign this contract, the mobilization time will be determined by the Municipal Energy Office, and the construction period of civil engineering and installation works will be 240 days according to the effective construction date. If the project cannot be started on schedule due to Party A's reasons, the losses caused can be solved through negotiation. In case of irresistible natural disasters, the construction period will be postponed.
Seven, safe production and civilized construction
1. During the construction process, Party B must pay full attention to safety production, carry out the construction in strict accordance with the operating rules for safety production, formulate safety construction safeguard measures, do a good job in accident work injury insurance, and put an end to all major and minor safety accidents. In case of safety accidents, all responsibilities and economic losses caused by casualties and property losses shall be borne by Party B, and Party A shall not be held responsible.
2. In the process of construction, Party B must strictly abide by the relevant national laws, regulations and rules, and shall not cause environmental pollution due to construction, keep the construction site clean and tidy, and stack materials in strict accordance with the safety operation regulations.
Eight. Responsibilities of Party A and Party B
Party A's responsibilities:
1. Be responsible for the work of three links and one leveling on the construction site, and provide necessary working and living conditions for Party B's on-site construction and debugging, such as: the expenses for temporary water, electricity and construction electricity shall be borne by Party A; Be responsible for introducing tap water and main power supply to the location designated by Party B in the biogas station. Test water and pressure at Party B.
Provide sufficient water for Party B during the test. Do a good job in epidemic prevention and isolation in the construction area and pig breeding production line.
2. Organize the technical disclosure of design and supervision, and the blue prints.the design, and coordinate the relationship between design, supervision, construction and other units, and handle the relationship between local governments and village and group farmers to ensure the normal construction of the project.
3. In this project, Party A will appoint 65,438+0 construction technicians (with corresponding qualifications) as permanent representatives of the construction site to be responsible for the management of the whole project and the contact with relevant departments.
4. Allocate the project funds in time according to Party B's construction progress to ensure that the project funds are in place in time according to the contract requirements. According to Party B's construction progress, organize on-site acceptance of partial projects. Cooperate with Party B to organize the commissioning and operation of the project, and send personnel for internship, operation and commissioning.
Party B's responsibilities:
1. Perform the responsibilities of the construction unit according to the contract requirements, ensure that the project tasks are completed on schedule with good quality, and strive to maximize the investment of the construction unit.
2. During the installation and commissioning, the operators of biogas stations selected by Party A shall receive on-site training, so that Party A can master the necessary operation skills.
3. Party B's construction personnel shall abide by the on-site disinfection system.
4. The equipment shall be guaranteed free of charge within one year from the date of commissioning and acceptance, and delivered to the site within 48 hours after receiving the maintenance notice from Party A. ..
5. Party B shall not transfer this project.
Nine. responsibility for breach of contract
After this contract is signed by both parties, neither party shall breach it. In case of unilateral breach of contract, the breaching party must compensate the observant party for the actual economic losses and pay 20% of the total project price as liquidated damages.
X. Ways to resolve contract disputes
During the performance of this contract, all disputes shall be settled through friendly negotiation between Party A and Party B. If negotiation fails, either party may bring a lawsuit to the people's court where Party A's unit is located.
XI。 others
1. When Party A pays 100% of the contract price, the ownership of the subject matter of this contract belongs to Party A..
2. If the biogas project can't run normally and be accepted normally due to Party A's reasons, Party A shall unconditionally settle all the contract money for Party B within 365 days after the installation of the contract equipment is completed.
3. For matters not covered in this contract, Party A and Party B shall sign a supplementary agreement separately, which shall have the same legal effect as this contract after being signed by both parties.
4. This contract is made in sextuplicate, with Party A and Party B holding two copies respectively, and the two copies shall be filed by the municipal and county authorities. It will take effect as of the date of signature and seal by both parties.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Model contract for water, electricity, fire protection and construction 3
Party A:
Party B:
In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law and the current relevant regulations, Party A and Party B, on the premise of equality, mutual benefit and voluntary cooperation, have agreed to contract out the road project of Wangjiawan residential area to Party B in the form of a single package. In order to ensure the interests of both parties, both parties have reached the following agreement:
I. Project management:
Party B is a professional worker to which Party A belongs, and the daily work of all workers is carried out under the unified management of the company. In order to speed up the progress of the project, ensure the quality of the project, and give full play to the management role of professional types of work, Party B accepts the inspection and supervision of Party A within the scope stipulated in the contract and agreement, and everything must be subject to the unified management of Party A (the project management system is attached).
Second, the basic situation of the project
Project Name: Road Project of Residential Quarter
Construction site: _ _ residential area
Third, the contract form:
In order to ensure the common interests of both parties, Party B contracts all the contents of this contract, and Party B shall meet the requirements of quality and progress as required by Party A..
Four, the specific content of project contracting:
1, road engineering leveling and rolling;
2. According to the design width of road engineering, macadam base 10㎝, c30 concrete surface 20 ㎝;
3. Earthwork excavation of roadside rainwater pipes, sewage pipes and inspection wells;
4, manhole every 12 meters masonry a rainwater manhole and a sewage manhole;
5. Install roadside rainwater pipes dn300, sewage pipes dn400 and precast reinforced concrete pipes;
6. Party B is responsible for the post-construction maintenance of the road, and Party A is responsible for the expansion and excavation of the road;
7. The sidewalk is flat (excluding cushion and brick);
8. If other matters not covered actually occur, Party A and Party B shall settle them through negotiation.
5. Project price: 406,000.00 yuan (four hundred and sixty-six thousand yuan only).
Sixth, the construction period
After signing the construction agreement with Party A, Party B shall organize the construction in strict accordance with the construction period of Party A, and organize capable construction personnel and management personnel to ensure that the project is completed on time. If Party B fails to complete the project as required by Party A, all economic losses and consequences caused thereby shall be borne by Party B. ..
The proposed commencement time is: according to the requirements of the project department.
The planned completion time is: stipulated by the project department.
Seven. Project quality
1, the quality grade of this project is qualified.
2. Party B shall carefully organize the construction, carefully manage and take strict quality control measures to ensure the engineering quality level stipulated in the contract. Party A has the right to check the quality of the project at any time, put forward rectification opinions on the parts that do not meet the quality standards, and impose economic penalties on Party B when necessary. Party B shall actively cooperate. If the quality of the project continues to fail to meet the standard and reaches the quality level after rectification, Party A has the right to withdraw the contracting right, and all economic losses and consequences caused thereby shall be borne by Party B..
Eight, construction safety
Party B shall carry out the construction in strict accordance with the safety operation regulations, and sign a special safety contract with Party A for implementation. Party B must carry out safety education and construction safety disclosure for all workers on duty to prevent all safety accidents. If Party B neglects safety management and does not listen to Party A's safety management, resulting in safety accidents, all economic and legal responsibilities shall be borne by Party B, and Party A shall not be held responsible. Party A is responsible for providing safety supplies for Party B's construction personnel (the safety contract is attached). Including safety helmet (expenses shall be borne by Party B)
Nine, civilized construction management
Civilized construction management is a symbol of a company's comprehensive management ability. The quality of civilized construction management directly affects the company's image. Party B shall conduct management in accordance with the relevant regulations on civilized construction, ensure that the construction site is clean and tidy, and ensure that the civilized model site is reached.
X. Family planning management
Party B must carry out family planning management for the construction personnel in accordance with the relevant regulations of the State on family planning management. All construction personnel must hold the family planning certificate of floating population from the local family planning department, and those who do not meet the family planning regulations shall not use it, and shall be inspected by the relevant departments. If Party B fails to use the personnel without family planning certificate as required, all economic losses caused thereby shall be borne by Party B. ..
XI。 Public safety management
Party B must educate the constructors about public security, check their ID cards and submit copies to Party A for future reference. Those suspected of crimes of unknown origin shall not be used, and shall be inspected by the local public security department. If Party B fails to manage personnel as required, or a fight occurs during the construction, Party B shall bear all economic and legal responsibilities.
Twelve, the project payment settlement method
1, sign the contract lump sum table according to the budgeted cost.
2. If the total budget price is not priced, it will be adjusted according to the on-site visa and included in the total settlement price.
XIII. Payment Method of the Project
After Party B's project is completed and accepted, it will be settled in one lump sum without paying any fees.
Fourteen Rights and obligations of Party A
1. Party A shall make technical disclosure and management disclosure to Party B. ..
2. Party A shall perform the terms of the contract.
3. Party A has the right to supervise and inspect Party B at any time according to the contract.
Fifteen. Rights and obligations of Party B
1. Party B shall abide by the terms of the contract.
2. Party B shall manage according to the contract.
3. Party B has the right to make suggestions to Party A. ..
4. If Party A fails to abide by the contract, Party B has the right to appeal.
Sixteen. other terms
If Party B leaves his post or fails to perform the contract, Party A will not settle the project payment for Party B, and all expenses will be borne by Party B.. In the process of construction, in order to realize convenient, timely and effective management, the first responsible person of Party B must live in the construction site.
17. This agreement is made in duplicate, with each party holding one copy. It will take effect after signing, and will automatically become invalid after the project is completed and the final payment is paid.
18. Other matters not covered shall be settled by both parties through negotiation and a supplementary agreement shall be signed.
Nineteen. Any dispute arising from the performance of this contract shall be submitted to Lichuan Arbitration Commission for arbitration.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Model contract for water, electricity, fire protection and construction 4
According to the cooperation intention of both parties, Party B provides computer and network security engineer rental service to Party A to deal with the security problems of Party A's computer and network system operation.
I. Rights and obligations of Party A
1. Enjoy comprehensive and thoughtful "network management and computer maintenance" service.
2. Enjoy the decentralized or centralized services of network engineers.
3. Enjoy the comprehensive maintenance of Party B's network management engineer once every two weeks.
4. Comprehensive overhaul and maintenance:
Check whether the operating systems of individual computers and servers are running normally;
Whether the Internet and LAN are unblocked and whether other network devices are connected and working normally;
If problems are found, they should be eliminated in the shortest time without affecting the normal work of Party A. ..
5. Enjoy the 24-hour free consultation service of "Network Management and Computer Maintenance". The hotline is _ _ _ _ _ _ _.
6. Enjoy at least _ _ _ _ _ _ _ hours of computer knowledge training provided free of charge during the contract period.
7. During the implementation of Party B's services, Party A shall actively assist Party B to avoid service interruption.
8. In order to ensure that the problem can be solved quickly, timely and accurately in the rescue process, before Party B's engineer leaves for the site, Party A has the obligation to accurately describe the site situation and answer the questions raised by Party B's engineer.
9. In case of force majeure that hinders the smooth progress of cooperative business, both parties shall discuss how to solve the problem on the basis of mutual understanding.
Two. Rights and obligations of Party B
1. After this agreement comes into effect, Party B shall ensure that _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ After Party A's network or single machine fails and gives an alarm, it shall come to the door immediately within the working hours stipulated by the state, and it shall not exceed _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
2. Free telephone consultation. The number of emergency door-to-door services provided within _ _ _ _ _ hours shall not exceed _ _ _ _ _ _ _ times/year. After the emergency rescue, Party B shall sign for confirmation.
Three. Service content of Party B
1. Hardware service:
Party B shall ensure the maintenance and repair of the computer mainframe (motherboard, hard disk, CD-ROM, board card, etc.). ), monitors, peripherals (printers, scanners) and network equipment insured by Party A in that year, and ensure the normal operation of hardware equipment.
Note: In case of hardware damage, Party B shall be responsible for hardware maintenance. For the hardware that cannot be repaired, Party B shall put forward the specifications, models and quotations of the accessories, which can be purchased by Party A itself or by Party B on your behalf (subject to the market price).
2. Network management and software security services
A. Create data files and system driver files for each computer, peripheral device, etc.
B. Hardware repair and maintenance;
C. software installation and debugging;
D. virus protection and network security;
E. network planning, design, installation and maintenance;
F. information data recovery and backup;
G. technical consultation and free computer training;
H. data collation;
First, password management;
J. periodic system optimization;
K system beautification, system speed optimization, advanced system optimization, disaster rescue and recovery;
3. For commercial contents not covered in the above contents, both parties shall negotiate separately.
Fourth, the quotation standard
10 The following unit: _ _ _ _ _ _ _ Yuan/month
1 1 ~ 20 sets: _ _ _ _ _ _ yuan/month.
2 1 ~ 30 sets: _ _ _ _ _ _ yuan/month
3 1 ~ 40 unit: _ _ _ _ _ _ yuan/month
4 1 ~ 50 sets: _ _ _ _ _ _ yuan/month
More than 50 sets: negotiable
Verb (abbreviation for verb) agreement payment
1. Charging standard: RMB _ _ _ _ _ _ _ yuan/month.
Individuals reprint the contents of this site, please be sure to keep the source information of the above articles! No media can reprint it without permission!
2. Payment method: Party A shall pay RMB _ _ _ _ _ _ _ _.
Secrecy clause of intransitive verbs
Party A shall allow Party B to check the relevant information in the hard disk or other storage devices when necessary for maintenance and rescue work. Party B shall guarantee the confidentiality of Party A's information. If Party B neglects or intentionally loses or divulges Party A's confidential documents or materials, Party B will bear all legal responsibilities and economic losses.
Seven. liability clause
1. The main service scope of network management is to ensure the normal operation of a single computer operating system; Internet and local area network are unimpeded, and other application software is not within the scope of service, but Party A shall try its best to provide technical guidance.
2. If Party A's hardware is damaged or data is lost due to the fault of Party B's service personnel, Party B shall be responsible for compensation.
3. Considering uncertain factors such as computer software hackers and viruses, Party B is obliged to remind Party A to back up important data in real time, but it cannot bear other responsibilities caused by this agreement, including data loss, commercial loss, civil infringement or other permanent losses, and incidental, subsequent and indirect losses caused by this agreement.
4. Unforeseen circumstances, such as policy reasons or natural disasters, such as floods, fires, strikes, etc. , the two parties negotiate again to determine the specific contents of the terms of this agreement.
Eight. Dispute clause
Party A and Party B are obliged to complete all the contents stipulated in this agreement. In case of any dispute, both parties shall settle it through friendly negotiation in the spirit of equality and mutual understanding. If negotiation fails, both parties agree to solve it through legal channels, and both parties unanimously agree to _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
X. Entry into force of the Agreement
This contract is made in duplicate, one for each party; Have the same legal effect.
The effective date is _ _ _ _ _ _ _ _ _ _.
Party A (seal): _ _ _ _ Party B (seal): _ _ _ _ _ _
Representative (signature): _ _ _ _ Representative (signature): _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Signing place: _ _ _ _ _ Signing place: _ _ _ _ _ _