How to write the building electrical installation contract?

Party A:

Party B:

In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, and following the principles of equality, voluntariness, fairness and good faith, both parties have reached an agreement on the hydropower installation project contracting of this project through consultation.

I. Overview of the Project:

1. 1, project name:

1.2, project address:

1.3, structural form: high-rise short-leg shear wall structure, with two floors underground and 27 floors above ground (18), and the height above ground is 2.9m.

The total floor area of this residential building is about.

1.4 contract scope:

Construction drawings and design changes include the following work contents.

(1) water supply system embedment and installation;

(2) Burying and installation of drainage system;

(3) Installation and debugging of water supply equipment;

(4) Burying and installation of heating system (except floor heating);

(5) Embedding and installation of lighting system line equipment and switches;

(6) Installation of lightning protection system;

(7) Embedded fire water and electricity system and installation of equipment and facilities;

(8) The lines of weak current systems such as TV, telephone, network and security intelligence are embedded and wired;

1.5, contract method:

1.6. Contract content: The aproll distance of all pipelines of water, electricity, heating and fire protection systems is 1500mm, and the pipelines within the contract scope shall be rustproof, anticorrosion and thermal insulation; Design and plugging of all reserved holes and casings, cleaning of tube wells, reserved embedded pipes and boxes, relevant experimental debugging (including cooperating with the external network construction unit to complete the comprehensive debugging and acceptance of the system), positioning, installation and debugging of equipment and facilities, and wiring of weak current embedded pipelines and ensuring smooth flow. Party B shall be equipped with tools, equipment and tools other than those provided by Party A, such as rhinestones, electric hammers, silk suits and hand-held cutting machines.

Second, the construction period requirements:

2. 1. Commencement time: year month day;

Completion time: year month day;

Remarks: If the mobilization time changes, Party A shall notify Party B to make preparations 15 days in advance.

Third, the quality requirements:

3. 1 Party B must be responsible for the quality of the contracted project according to the national regulations. If economic losses and safety accidents are caused by unqualified construction quality, all economic and legal responsibilities and all consequences shall be borne by Party B, not Party A. ..

3.2 In the process of construction, Party B must strictly abide by the mandatory provisions of the national engineering construction standards and the current building construction norms and operating procedures, and the engineering quality requirements meet the qualified standards. In case of any dispute between the two parties on the quality of the project, the evaluation by the local quality supervision station, relevant units and experts shall prevail.

Four, safe and civilized construction requirements:

5. 1 Party B must strictly abide by safety laws, regulations and rules in the whole construction process. All kinds of safety precautions must be implemented on site. Closed construction shall be carried out at the site to ensure the absolute safety of construction personnel and related personnel.

5.2 Party B is responsible for the loading and unloading, orderly stacking and storage of all incoming and outgoing materials. Party B shall designate a special person to receive the incoming materials and turnover tools and keep them properly. When Party B leaves the site, he will be fined ten times for counting the losses exceeding the quota.

5.3 Party B shall provide all safety protection articles such as safety belts, safety helmets, rubber shoes and insulating gloves according to relevant regulations and special construction plans, and ensure that they are worn and used according to regulations.

Verb (abbreviation for verb) Obligations of both parties:

(I) Obligations of Party A:

1. Provide Party B with a set of construction drawings;

2. Complete technical disclosure, safety education and disclosure;

3. Provide temporary water and electricity interface for construction to Party B. ..

4. Provide electric welding machine, power cord and welding handle cord, toothless saw and power cord, power cord of silk making machine and bench drill, without equipment.

(II) Obligations of Party B:

1. Be responsible to Party A for the project quality within the scope of the contract, and carry out the construction in strict accordance with the design drawings and construction acceptance specifications to ensure that the project quality meets the qualified standards;

2, in strict accordance with the schedule specified by Party A, invest enough manpower and material resources to ensure the construction period;

3, strengthen safety education, conscientiously implement the safety technical specifications, strictly abide by the safety system, the implementation of safety measures, to ensure construction safety; Party B shall complete the technical disclosure, safety disclosure and three-level safety education of the team according to the regulations, and complete the signature, which shall be reviewed and filed by Party A ... Provide Party A with a true and effective certificate of special type of work for the record, and ensure that the certificates are consistent during the construction process;

4. Party B must designate a person in charge of the site to be responsible for the management of the construction site and the interface with Party A's project department. The site management personnel designated by Party B shall perform their due management duties during the construction period, and shall not leave the site or make changes without the permission of Party A; However, after a period of running-in, those who are still incompetent should be replaced immediately;

5. Party B shall submit the material plan signed by the project leader to Party A 10 days in advance; Materials entering the site shall be loaded, unloaded, stacked and managed by themselves, and the materials shall be stacked on the construction site according to the unified planning of Party A;

6. Party B shall protect the finished products and semi-finished products in the construction process, and Party B shall fully compensate for the damage to equipment and facilities, fire losses and third party losses caused by Party B's responsibility.

Six, safety accident treatment:

1. In case of heavy casualties and other safety accidents, Party B shall report to Party A in time and handle them according to relevant national laws and administrative regulations.

2. Party B shall pay attention to safety education, safety disclosure and safety self-inspection. All responsibilities shall be borne by Party B for safety accidents caused by Party B's illegal operation and illegal command.

Seven. Contract price and payment method:

1. The total contract price is 3 1 yuan/building square meter. The total price includes labor cost, mechanical cost (Party A provides one electric welding machine, one set of oxyacetylene and gas cutting equipment, one set of toothless saw and saw blade), installation auxiliary materials cost, installation and installation cost, debugging cost, insurance and risk cost, etc. This unit price will no longer be adjusted due to all factors such as design change, quota adjustment and market change.

2. The down payment in this contract is from the main construction of two residential buildings to the completion of concrete pouring on the first floor roof, and Party A pays 80% of the completed project price to Party B; After that, on the 5th of each month, Party A and Party B shall check the output value completed last month and pay Party B 80% of the output value of last month before this month 15. After all the projects agreed in this contract are completed and accepted by Party A and the supervision unit, Party A shall pay 95% of the settlement project funds to Party B; 5% of the project payment is the quality guarantee fund, which will be paid to Party B in one lump sum within two years from the date when the project is put on record and accepted without quality problems.

3. The comprehensive unit price of this contract is 3 1 yuan, which is divided into the following settlement items as the basis for project payment:

(1) The electrical system is embedded in 4 yuan/m2.

② Electrical threading 4 yuan /m2.

(3) electrical equipment, facilities, switch panel lamp installation 4 yuan /m2.

④ 3 yuan /m2 for comprehensive electrical debugging and acceptance.

(5) 4 yuan/m2 shall be reserved for water, heating and fire protection systems.

⑥ Installation of main pipes of water, heating and fire fighting systems 5 yuan /m2.

All landowners water, heating, fire protection system branch pipe installation and equipment installation in place 4 yuan /m2.

⑧ 3 yuan /m2 for comprehensive debugging and acceptance of water, heating and fire protection.

Nine. Dispute resolution:

In case of any dispute between Party A and Party B during the performance of this contract, they may settle it by themselves or ask the relevant competent department for mediation. If either party is unwilling to settle or mediate, or mediation fails, both parties agree to bring a lawsuit to the people's court where the project is located.

X. termination of the contract:

The project contracted by Party B has passed the acceptance of Party A, the construction unit and the supervision unit. After the work results are delivered to Party A, both parties have fulfilled all their obligations under this contract, and this contract is terminated.

Twelve, the number of copies of the contract:

This contract is made in sextuplicate, with the same effect. Party A holds four copies and Party B holds two copies.

Party A: (signature) Party B: (signature)

Seal: seal:

Year, month, sun, moon, sun.