Tripartite Entrustment Contract Template _ Tripartite Entrustment Contract Template

A tripartite contract is a contract signed by Party A, Party B and Party C, and one of them is a witness or an intermediary. The following is a model of tripartite entrustment contract that I have carefully arranged for you. Welcome to reading.

Model text of Party A's tripartite entrustment contract:

Party B:

Party C:

According to the construction contract signed by Party A and Party C, Nadamu National Sports Ground (artificial lake), the original ecological cultural tourist scenic spot of Mongolian in Dedu, Qilian Mountain, was fully invested by Gansu Yanglan Investment Management Group Co., Ltd. and undertaken by Qinghai Second Construction and Installation Engineering Co., Ltd.

Now, Party A, Party B and Party C, based on the principles of voluntariness, equality and fairness, have entered into this agreement through friendly negotiation and abide by it jointly.

The Nadam National Stadium (artificial lake) in the scenic spot was directly built by Party B (Qinghai Jiade Mining Development Co., Ltd.) under Gansu Yanglan Investment Management Group Co., Ltd., and participated in the progress, quality and cost control management of the Nadam National Stadium (artificial lake) construction project in the scenic spot. The progress payment of the project was allocated by Gansu Yanglan Investment Management Group Co., Ltd. to Qinghai Guardian Mining Development Co., Ltd. and paid directly by Qinghai Guardian Mining Development Co., Ltd. In the future, the payment and final accounts of the project funds will be directly reported to Qinghai Guardian Mining Development Co., Ltd., which will reply and pay.

Any dispute arising from the performance of this Agreement shall be settled by Party A, Party B and Party C through negotiation as far as possible; If negotiation fails, it shall be submitted to the people's court of the place where this agreement is signed for litigation.

This Agreement shall come into effect as of the date of signature and seal by Party A, Party B and Party C (if Party A and Party B are natural persons, their legal representatives or entrusted agents shall sign and affix their official seals); This agreement is made in triplicate, with Party A, Party B and Party C holding one copy respectively, and each copy has the same legal effect.

If Party A is a natural person (signature); If Party A is the company (seal):

Legal representative or entrusted agent (signature):

If Party B is a natural person (signature); If Party B is the unit (seal):

Legal representative or entrusted agent (signature):

Party C (seal):

Legal representative or entrusted agent (signature):

Date of signing this agreement:

date month year

Model Tripartite Entrustment Contract Article 2 Entrusting Party: (hereinafter referred to as Party A)

Tester: (hereinafter referred to as Party B)

Construction party: (hereinafter referred to as Party C)

In order to ensure the construction quality of this project, Party A entrusts relevant inspection and test work to Party B, and through negotiation between Party A and Party B, the following contract terms are reached on relevant matters for common compliance.

I. Overview of the Project

Project address: 20 14, bid 2 of comprehensive renovation project of existing building facade in Xiling District.

Project leader of the construction unit: Gu Yuanshun Tel: 07 176053598 Construction unit: Chongqing Hong Xin Construction Co., Ltd.

Project leader of the construction unit: Lu Yuanfeng Tel: 1354 575666 Sample sender: Zhu Hongxia Tel: 13872585808 Supervisor: Yichang Hongye Project Management Company Witness: Tel: Project construction area: district and county where the project belongs:

Second, the test items

The inspection items entrusted by Party A and Party C to Party B include (subject to "√"):

√ Witness sampling inspection √ Main structure engineering inspection √ Equipment installation engineering inspection □ Foundation engineering inspection □ Steel structure engineering inspection □ Indoor environment inspection □ Deformation measurement □ Building energy-saving inspection □ water quality inspection □ Foundation pit monitoring □ Safety protection articles inspection.

□ Others:. See Annex I for specific test items, quantity, basis and test parameters.

Three. Basis and standard of charges

1. charging standard: 70% of the charging standard for quality inspection and testing of construction projects in Hubei Province (Efu [2008] No.20) issued by the Provincial Price Bureau and the Provincial Construction Department.

2. Witness sampling inspection (building materials inspection), site inspection of main structure engineering, equipment installation engineering inspection and safety protection articles inspection. The inspection fee shall be paid by the construction unit, and other inspection fees (including the inspection within the range of Yishiju [20 13] 1 17) shall be paid by Party A. ..

Four. mode of payment

After consultation between both parties, the expenses incurred by the report shall be settled according to the facts when the corresponding test report is received.

Verb (abbreviation of verb) Party A's obligations

1. Party A shall ensure that the witness sampling inspection shall be undertaken by Party B, and urge the construction unit to submit materials related to engineering inspection to Party B. ..

2. Urge the construction unit to inform Party B of the progress of the project in time, and make preparations before inspection and test according to Party B's requirements.

3. Supervise the construction unit to sample and send samples according to standards, specifications and relevant regulations of provinces and cities, and go through the registration formalities according to regulations, and notify Party B of the on-site inspection items at least one working day in advance, so that Party B can make preparations and work arrangements before inspection.

4. Coordinate the relevant units of engineering construction and Party B to complete the inspection and test.

Inadvertent Verb Obligations of Party B

1. Guide Party A, the supervisor and the construction unit to make good preparations before the test and provide relevant consultation.

2. According to the requirements of Party A, the supervisor, the construction unit and the actual situation on site, organize personnel and equipment to carry out the test and detection work according to the time agreed by both parties, and ensure that the test and detection work is completed within the promised time range.

3. Responsible for the transportation of on-site inspection items.

4, in strict accordance with the current national and industry related technical standards, norms, procedures for testing, and be responsible for the authenticity of the test results issued.

5. Provide Party A, the supervisor and the construction unit with the test report in quadruplicate according to the promised time limit of our station report.

6. Be responsible for the safety of our own personnel and equipment.

Seven. Obligations of Party C

1. Party C shall submit materials related to project inspection to Party B. ..

2 in accordance with the standards, norms and the relevant provisions of the provinces and cities to sample and send samples, and go through the registration formalities in accordance with the provisions. Notify Party B of the on-site inspection items at least one working day in advance, so that Party B can make preparations and work arrangements before the test.

3. Pay the inspection fee in time according to the provisions of Article 3.

Eight. responsibility for breach of contract

After the contract is signed, the three parties shall abide by the terms of the contract. If one party breaches the contract, the breaching party shall pay liquidated damages (5% of the total cost of testing and inspection) to the observant party and bear corresponding responsibilities.

Nine. Other agreed matters.

1. If there are other matters not covered in this contract, the three parties shall reach a supplementary agreement through consultation. The supplementary agreement has the same effect as this contract, but it shall not conflict with the contents of this contract.

2. In case of any dispute during the execution of this contract, the three parties shall settle it through consultation in time.

3. This contract is made in seven copies, two for Party A, two for Party B, two for Party C and one for the monitoring station. It shall come into effect after being signed and sealed by Party A, Party B and Party C, and shall be filed in the municipal construction engineering quality supervision station.

Party A (official seal): Party B (official seal): Yichang Jianyi Construction Engineering Quality Inspection Center Manager: Legal Representative: Unit Address: Tel: Bank: Account Number:

Party C (official seal): Handler: Legal Representative: Address: Tel: Bank:

Account number:

Agent: Legal Representative:

Address: No.7 Stadium Road

Tel: Bank of deposit:

date month year