The construction project from Hulin to Jixi in expressway is the largest and most expensive highway construction project in the history of highway construction in Jixi City, and it is also one of the important projects in the three-year decisive battle of highway construction in Heilongjiang Province. The total investment exceeds 5.2 billion yuan, and the main line of the project 18 1.7 km runs through the whole territory of Jixi. Including Hulin section, Mishan section and Jidong section, the connecting lines are Jixiang Port connecting line, Peide Interchange connecting line and Didao-Xingkai Lake Airport connecting line.
This project will build 167 bridges, 1 maintenance center, 6 maintenance work areas and 3 service areas. The construction period of the whole project is 3 years, and it is planned to be completed in 20 12. After the completion of the expressway Hulin-Jixi section, it is of great significance to improve the main skeleton of the eastern highway in Heilongjiang Province and promote the sound and rapid economic and social development of Jixi and its surrounding areas.
It is understood that Jixi City has gone all out to strengthen the organization and leadership of the project. Has completed the establishment of the project organization, the formulation of various management rules and regulations, construction drawing design, land pre-examination and forest land approval, bidding, loan and other work; Land acquisition and demolition work is accelerating; At present, construction, supervision and testing contracts are being signed.
Tender Notice for Construction Project (Civil Engineering) of Hulin-Jixi Section of Construction Machinery expressway
Region: Heilongjiang
Details:
Tender Notice for Construction Project (Civil Engineering) of Hulin-Jixi Section of Construction Machinery expressway
1, bidding conditions
The construction project (civil engineering) of expressway Hulin-Jixi section of Jianji has been approved by the Development and Reform Commission of Heilongjiang Province (document [2009] No.944). The owner of the project is the construction headquarters of Hulin-Jixi section of expressway Construction Machine. Construction funds come from domestic bank loans, transportation departments and state financial subsidies, and local self-financing, with a total investment of 5.349 billion yuan. The investment proportion of the project is 65.438+0.44567 billion yuan subsidized by the state and raised by the construction unit (65.438+0 billion yuan subsidized by the Provincial Communications Department and 445.67 million yuan raised by three counties (cities) along the line), accounting for 27% of the total investment. Domestic bank loans amounted to 39,033.3 billion yuan, accounting for 73% of the total investment. The tenderer is the construction machine from Hulin to Jixi in expressway. The project has met the bidding conditions, and the construction of this project is now subject to public bidding.
2. Project overview and bidding scope
2. 1 The construction project (civil engineering) of the Hulin-Jixi section of the construction machine in expressway in this tender is K2+500 ~ K156+16.567, with a total length of 200.6 12km, of which the main line154.27. ..
2.2 Planned construction period of this project: May 2065438 1 day-September 30, 2065438 +02.
2.3 Block division:
No better than Deno. Mileage (km) of construction section and description of construction bid (subgrade and extra large bridge)1a1k 2+500 ~ k11+000 8.5 subgrade, bridge and culvert, drainage and protection 22k1/kloc. Bridges and culverts, drainage, protection 33k20 bridges and culverts, drainage and protection 8AK69+000 ~ K76+0007 subgrade, bridges and culverts, drainage and protection 9AK76+000 ~ K83+5007.5 subgrade, bridges and culverts, drainage and protection (including connecting line 3.996km)10A/. +495. 173 7.999 foundation, bridge and culvert, drainage and protection13a13k11+000 ~ k120+000. Kloc-0/20+000 ~ k130+000100 subgrade, bridge and culvert, drainage, protection18a18k0+000 ~ k14+579/. Kloc-0/9a19K0+000 ~ K27+785 27.785 Airport-drip connection line (subgrade, pavement, bridges and culverts, safety facilities, precast beams with a length of 20m and below are 22 B3 K 1 18+435, prefabricated by Mishan beam and slab precast factory (K9 Section 00) The precast beam with a beam length of 20m or less is 23 B4 K 135+600 precast in Jidong beam slab precast factory (k130+000 ~ k ~ k31+000 28.5 pavement 2c2k31+000 ~ K59+) Qualification requirements of bidders for 4044 pavement 3 C3 K59+000~K83+500 24.5 pavement 4c4k83+500 ~ k105+000 21.995 pavement 5 C5 K 105.
3. 1 This tender requires bidders to meet the following conditions:
A 1 ~ A 17 has the first-class and above qualification of highway engineering general contracting issued by the Ministry of Construction.
A 18 ~ A 19 has the second-class and above qualification of highway engineering general contracting issued by the Ministry of Construction.
B 1 ~ B4 has the first-class and above qualification of highway and bridge engineering professional contracting issued by the Ministry of Construction.
C 1 ~ C6 Bid Section has the first-class and above qualification of highway pavement engineering professional contracting issued by the Ministry of Construction.
At the same time, it has corresponding construction performance, and has corresponding construction ability in terms of personnel, equipment and funds, and there is no bad performance.
3.2 The consortium bid is not accepted in this tender.
3.3 An affiliated enterprise with investment and equity participation, or a parent company with direct management and managed relationship, or a subsidiary of the same parent company, or two or more legal persons with the same legal representative may not bid for the same bid section at the same time, otherwise it will be treated as invalid bidding.
4. Acquisition of bidding documents
4. 1 Anyone who is interested in bidding, please participate in the bidding from 9: 00 to 13: 30 and 13:30 every day. With the original business license of the enterprise as a legal person, the original qualification certificate of the enterprise, the original letter of introduction of the unit, the original ID card of the agent and the copies of the above materials (all copies in the bidding documents refer to color scanned copies or color copies), go to the comprehensive office of nangang district Changjiang Road No.201,Harbin, Heilongjiang Province to buy a set of bidding documents. Bidders participating in the bidding of multiple blocks must purchase the bidding documents of the corresponding blocks respectively, and submit the bidding documents separately for each block.
4.2 The price of each set of bidding documents is 4,000 yuan. If it is not sold after the deadline, it will not be returned after the sale.
5. Submission of bid documents and related matters
5. 1 The deadline for submission of bid documents (bidding deadline, the same below) is 20 10 April 7 10: 00, and the bidder shall deliver the bid documents to No.245, Songbei Avenue, Songbei District, Harbin City, Heilongjiang Province from 8: 30 to/kloc-0: 00 on that day (Heilongjiang Province
5.2 The tenderee will not accept the bid documents delivered late or not delivered to the designated place.
The above is the introduction of CBI Zhong Da Consulting to Jianji Expressway. For more information about expressways, please pay attention to the architectural knowledge column of Zhong Da Consulting.
For more exclusive information about the construction industry, please pay attention to the micro-signal of the construction network in real time.
For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.