Responsibilities of supervision engineer

First, the chief supervision engineer shall perform the following duties

1 Determine the division of labor and post responsibilities of the personnel of the project supervision agency.

Preside over the preparation of the project supervision plan, examine and approve the detailed rules for the implementation of the project supervision, and be responsible for managing the daily work of the project supervision organization.

3. Review the qualifications of subcontractors and put forward review opinions.

4. Inspect and supervise the work of supervisors. According to the progress of the project, supervisors can be deployed, and incompetent supervisors should be replaced.

5. Preside over the supervision work meeting and issue the documents and instructions of the project supervision organization.

6. Examine and approve the commencement report submitted by the contractor and the progress plan of the technical scheme of construction organization design.

7 review and sign the contractor's payment certificate and completion settlement application.

8 review and handle engineering changes

9 preside over or participate in the investigation of engineering quality accidents

10 mediate the contract dispute between the construction unit and the contractor, settle the claim, and approve the project extension.

1 1 Organize the preparation and release of monthly supervision report, special report of supervision work stage and summary of project supervision work.

12 review and sign the quality inspection and evaluation data of divisional and unit projects, review the contractor's application for completion, organize supervisors to conduct quality inspection on the project to be accepted, and participate in the completion acceptance of the project.

13 presided over sorting out the project supervision data.

Second, the chief supervision engineer representative shall perform the following duties

1 Responsible for the supervision work assigned or assigned by the chief supervision engineer.

2. According to the authorization of the chief supervision engineer, exercise some responsibilities and powers of the chief supervision engineer.

3. The chief supervision engineer shall not entrust the following work to the representative of the chief supervision engineer.

(1) presided over the preparation of detailed rules for the examination and approval of project supervision planning.

(2) Issue the application form for project commencement and resumption of work, the order for project suspension, the payment certificate for project funds and the project completion inspection sheet.

The application form for project commencement/resumption shall conform to the format of Appendix A 1, the project suspension order shall conform to the format of Appendix B2, the project payment certificate shall conform to the format of Appendix B3, and the project completion inspection form shall conform to the format of Appendix A 10.

(3) Review and sign the completion settlement.

(4) Mediation of contract disputes between the construction unit and the contractor, settlement of claims and approval of project extension.

(5) According to the progress of the project, allocate supervisors and replace incompetent supervisors.

Three, professional supervision engineer shall perform the following duties

1 Responsible for compiling the detailed rules for the implementation of supervision of this discipline.

2. Responsible for the specific implementation of the professional supervision work.

Organize, guide, inspect and supervise the work of supervisors in this discipline, and make suggestions to the chief supervision engineer when the personnel need to be adjusted.

4. Review the scheme submitted by the contractor involving this major, apply for changes and report to the chief supervision engineer.

5. Be responsible for the acceptance of subdivisional work and concealed work of this major.

6. Submit the report on the implementation of the supervision work of this discipline to the chief supervision engineer on a regular basis, and timely report and ask for instructions to the chief supervision engineer on major issues.

7 According to the implementation of supervision work in this discipline, keep a supervision diary.

8. Be responsible for collecting, summarizing and sorting out the supervision information of this major, and participate in writing the monthly supervision report.

9. Check the original vouchers, inspection reports and other quality certificates and quality status of materials and equipment components in the site. If the materials and equipment components on the site need to be inspected in parallel according to the actual situation, they will be signed after passing the inspection.

10 is responsible for the engineering survey of this major, and reviews the engineering survey data and original vouchers.

IV. Supervisors shall perform the following duties

1 Carry out on-site supervision under the guidance of professional supervision engineers.

2. Check the manpower, materials, main equipment and operation of the contractor, and make inspection records.

3 review or directly obtain the relevant information of engineering measurement from the construction site and sign the original documents.

According to the design drawings and relevant standards, check and record the contractor's technological process or construction process, and record the inspection results of processing and construction quality.

5 As a side job, point out the problems found in time and report to the professional supervision engineer.

6. Keep supervision diary and relevant supervision records.