Current national waterproof engineering quota compilation (level 5 data) Download currency: 600 Zhu Longbi.
95 Basic Quota and Budget Concise Manual (Level 5 data) Download Currency: 550 Zhu Longbi.
Estimate Quota of Chemical Construction 2003 (I) (Grade 5 data) Electronic version Download Currency: 450 Zhu Longbi.
Electronic version of railway engineering quota (Excel version) (level 5 data) Download currency: 700 Zhu Longbi.
The latest application manual of budget quota of hydropower construction project and hourly fee quota of construction machinery (quota in 2004) (level 5 data) Download currency: 600 Zhu Longbi.
Mechanized construction quota of railway double-track tunnel (Railway Construction 200 1-70) Excel2003 Edition (Grade 5 data) Download currency: 550 Zhu Longbi.
Budget Quota of National Unified Installation Project-Volume I Mechanical Equipment Installation Project (Level 5 Data) Download Currency: 300 Zhu Longyuan.
Budget Quota of National Unified Installation Project-Volume II Electrical Equipment Installation Project (Level 5 Data) Download Currency: 300 Zhu Longyuan.
Budget Quota of National Unified Installation Project-Volume III Thermal Equipment Installation Project (Level 5 Data) Download Currency: 300 Zhu Longbi.
Budget Quota of National Unified Installation Project-Volume IV Furnace Masonry Project (Level 5 Data) Download Currency: 300 Zhu Longyuan.
Budget Quota of National Unified Installation Project-Volume V Static Equipment and Process Metal Structure Fabrication and Installation Project (Level 5 Data) Download Currency: 300 Zhu Longbi.
National unified installation project budget quota-Volume VI industrial pipeline project (level 5 data) Download currency: 300 Zhu Longyuan.
Budget Quota of National Unified Installation Project-Volume VII Installation Project of Fire Fighting and Safety Prevention Equipment (Level 5 Data) Download Currency: 300 Zhu Longbi.
Budget Quota of National Unified Installation Project-Volume VIII Water Supply, Drainage, Heating and Gas Engineering (Level 5 Data) Download Currency: 300 Zhu Longbi.
Budget Quota of National Unified Installation Project-Volume IX Ventilation and Air Conditioning Project (Level 5 Data) Download Currency: 300 Zhu Longyuan.
Budget Quota of National Unified Installation Project-Volume X Installation Project of Automatic Control Instrument (Grade 5 Data) Download Currency: 300 Zhu Longbi.
Budget Quota for National Unified Installation Project-Volume 1 1 Paint, Anticorrosion and Thermal Insulation Project (Grade 5 data) Download Currency: 300 Zhu Longbi.
[Guangdong ]2002 Municipal Engineering Comprehensive Quota and Description (Excel Edition). Part1(level 5, data) Download currency: 150 zhulongbi.
2002 Water Conservancy Construction Project Budget Quota Electronic Edition-Chapter 5 Template Project (Grade 5 Data) Download Currency: 200 Zhu Longbi.
Electronic version of budgetary estimate quota of water conservancy construction project in 2002-Chapter VI Sand and gravel preparation project (Grade 5 data) Download currency: 200 Zhu Longbi.
2002 Water Conservancy Construction Project Budget Quota Electronic Edition-Drilling Grouting Anchorage Project (Grade 5 Data) Download Currency: 200 Zhu Longbi.
2002 Water Conservancy Construction Project Budget Quota Electronic Edition-Chapter 8 Dredging Project (Level 5 Data) Download Currency: 200 Zhu Longyuan.
Electronic version of budgetary estimate quota of water conservancy construction projects in 2002-Chapter 9 Other projects (level 5 data) Download currency: 200 Zhu Longbi.
Electronic version of budgetary estimate quota for water conservancy construction projects in 2002-Appendix (five-level data) Download currency: 150 Zhu Longbi.
Electronic version of budgetary estimate quota of water conservancy construction project in 2002-Chapter 1 Earthwork Excavation Project (Grade 5 data) Download currency: 200 Zhu Longbi.
Electronic version of budgetary estimate quota for water conservancy construction projects in 2002-Chapter II Stone Excavation Project (Grade 5 data) Download currency: 200 Zhu Longbi.
Electronic version of budgetary estimate quota for water conservancy construction projects in 2002-Chapter III Earthwork Filling Project (Grade 5 data) Download currency: 200 Zhu Longbi.
2002 Water Conservancy Construction Project Budget Quota Electronic Edition-Chapter IV Concrete Project (Grade 5 Data) Download Currency: 200 Zhu Longbi.
China Oil and Gas Industry Standard-Labor Quota for Shallow Refractive Seismic Exploration (Level 5 Data) Download Currency: 350 Zhu Longbi.
Downhole operation equipment repair labor quota (level 5 data) Download currency: 220 Zhu Longbi.
Labor capacity (2004) (Grade 5 data) of urban rail transit electric traction power supply project Download currency: 300 Zhu Longbi.
Labor quota of long-distance pipeline laying project (level 5 data) Download currency: 300 Zhu Longbi.
Hourly Fee Quota of Hydraulic Engineering Construction Machinery (2002) (Grade 5 data) Download currency: 650 Zhu Long coins.
Labor quota for maintenance of special vehicles in oil fields (level 5 data) Download currency: 200 Zhu Longbi.
Input wire installation labor quota (level 5 data) Download currency: 300 Zhu Longbi.
Power supply line maintenance labor quota (level 5 data) Download currency: 220 Zhu Longbi.
Electronic version (2000) of communication construction project budget quota (five-level data) Download currency: 650 Zhu Longbi.
General rules for the preparation of water intake quota for industrial enterprises (five-level data) Download currency: 200 Zhu Longbi.
The latest tender offer and bill of quantities compilation manual for water conservancy and hydropower projects (Volume I) (Level 5 data) Download currency: 800 Zhu Longbi.
The latest tender offer and bill of quantities compilation manual for water conservancy and hydropower projects (Volume II) (Grade 5 data) Download currency: 800 Zhu Longbi.
The latest tender offer and bill of quantities compilation manual for water conservancy and hydropower projects (Volume III) (Grade 5 data) Download currency: 800 Zhu Longbi.
National Unified Budget Quota for Municipal Works (Volume IX) Metro Works (Level 5 Data) Download Currency: 1800 zhulongbi.
National Unified Budget Quota for Housing Renovation Project-Download Currency under Electrical Volume (Grade 5 data): 400 Zhu Longbi.
National Unified Budget Quota for Housing Renovation Project-Electric Volume Download Currency (Grade 5 data): 400 Zhu Longbi.
The latest implementation manual of the budget quota standard for land development and consolidation projects (five-level data) Download currency: 3000 Zhu Longbi.
Electronic Edition of Budget Quota Standard for Land Development and Consolidation Project (2005 Edition) (Level 5 Data) Download Currency: 800 Zhu Longbi.
Charging Standard for Engineering Investigation (2002) (Grade 5 data) Download currency: 150 Zhu Long currency.
Machine-shift expense quota of railway engineering construction machinery (Railway Construction [1997] No.55 document) (level 5 data) Download currency: 400 Zhu Longbi.
Description of highway construction project quota (budget quota, budget quota and construction quota) (five-level data) Download currency: 300 Zhu Longbi.
96 compilation method of budgetary estimate, budget and investment estimate of highway construction project (five-level data) Download currency: 200 Zhu Longbi.
The latest compilation method and valuation basis of electronic construction project budget estimate (five-level data) Download currency: 1200 zhulongbi.
The latest electronic construction project budget quota-Volume II Computer network equipment and wiring (level 5 data) Download currency: 2000 Zhu Longbi.
The latest electronic budget quota for construction projects-Volume III Installation of monitoring and management system for construction equipment (level 5 data) Download currency: 2000 Zhu Longbi.
The latest electronic construction project budget quota-Volume IV Audio, video, lighting and centralized control system (level 5 data) Download currency: 2000 Zhu Longbi.
Latest Budget Quota for Electronic Construction Project-Volume V (Part II) Clean Workshop (Room) and Electronics (Level 5 Data) Download Currency: 2500 Zhu Longbi.
Latest Budget Quota of Electronic Construction Project-Volume V (1) Clean Workshop (Room) and Electronic (Grade 5 Data) Download Currency: 3000 Zhu Longbi.
The latest electronic construction project budget quota-Volume VI instrument machine-team expense quota budget unit price (level 5 data) Download currency: 2000 Zhu Longbi.
National unified construction and installation project duration quota (2000) (level 5 data) Download currency: 500 Zhu Longbi.
National unified installation project budget quota description (level 5 data) Download currency: 220 Zhu Longbi.
Comparison between Bill of Quantities and National Basic Quota Calculation Rules Manual (Construction Engineering) (Level 4 Data) Download Currency: 400 Zhu Longbi.
Basic Quota of Ground Building Engineering for Coal Construction (99 Unified Base Price) (Grade 4 Data) Download Currency: 450 Zhu Longbi.
Budget Quota for Chemical Construction 2003 Electronic Edition (Part II) (Level 4 Data) Download Currency: 450 Zhu Longyuan.
Supplementary Quota of Budget Estimate of Water Conservancy Project (2005) (Level 4 Data) Download Currency: 500 Zhu Longbi.
Budget Quota for Water Conservancy and Hydropower Equipment Installation Project (2002) (Level 4 Data) Download Currency: 500 Zhu Longbi.
Budget Quota and Compilation Regulations for Water Conservancy and Hydropower Construction Projects in Sichuan Province (Level 4 Data) Download Currency: 500 Zhu Long Coins.
Hourly Cost Quota of Construction Machinery for Soil and Water Conservation Project (2003) (Level 4 Data) Download Currency: 400 Zhu Longbi.
Budget Quota of Soil and Water Conservation Project (No.67, Ministry of Water Resources {2003}) (Grade 4 data) Download Currency: 400 Zhu Longbi.
Search for railway engineering quantity and machine unit price (Excel) (four-level data) Download currency: 400 Zhu Longbi.
Budget Quota of Petroleum Construction and Installation Engineering (2000) Quota Database (Level 4 Data) Download Currency: 350 Zhu Longbi.
Basic quota of railway engineering (railway construction number. 1995- 138) (Level 4 data) Download currency: 300 Zhu Longbi.
[Guangdong ]2002 Municipal Engineering Comprehensive Quota and Description (Excel Edition). Part III (Level 4 data) Download currency: 150 Zhu Long coins.
[Guangdong ]2002 Municipal Engineering Comprehensive Quota and Description (Excel Edition). Part II (Level 4-4 data) Download currency: 150 zhulongbi.
[Guangdong] Comprehensive Quota and Quota Description of Decoration Engineering in 2003 (Excel Edition) (Level 4 Data) Download Currency: 300 Zhu Longbi.
China Oil and Gas Industry Standard-Labor Quota for Oil and Gas Gathering and Transportation Equipment Repair (1992) (Level 4 data) Download Currency: 300 Zhu Longbi.
China Oil and Gas Industry Standard-Labor Quota for Maintenance of Petroleum Construction Machinery (Level 4 data) Download Currency: 500 Zhu Longbi.
China Oil and Gas Industry Standard-Labor Quota of Oil Testing Project (1992) (Level 4 data) Download Currency: 500 Zhu Longbi.
China Oil and Gas Industry Standard-Labor Quota for Heat Treatment and Electroplating of Petroleum Machinery Processing (Level 4 Data) Download Currency: 350 Zhu Longbi.
China Oil and Gas Industry Standard-Automobile Maintenance Labor Quota (Level 4 Data) Download Currency: 500 Zhu Longbi.
China Oil and Gas Industry Standard-Automobile Maintenance Labor Quota (Level 4 Data) Download Currency: 500 Zhu Longbi.
China Oil and Gas Industry Standard-gas logging Engineering Labor Quota (Level 4 Data) Download Currency: 200 Zhu Longbi.
China petroleum and natural gas industry standard-man-day labor quota for seismic exploration and construction (1992) (level 4 data) Download currency: 150 zhulongbi.
China Petroleum and Natural Gas Industry Standard-Labor Quota for Maintenance of Oil Transportation Equipment of Long-distance Pipeline (1996) (Level 4 data) Download Currency: 550 Zhu Longbi.
China Oil and Gas Industry Standard-Labor Quota for Repairing Oil Production Equipment (Level 4 Data) Download Currency: 500 Zhu Longbi.
China petroleum and natural gas industry standard-oil production labor quota (1992) (level 4 data) Download currency: 500 Zhu Longbi.
China Oil and Gas Industry Standard-Maintenance Labor Quota of Substation Equipment (Level 4 Data) Download Currency: 500 Zhu Longbi.
Electronic version of technical operation standard for road and bridge construction quota personnel (level 4 data) Download currency: 400 Zhu Longbi.
Estimated Quota of Hydropower Equipment Installation Project (2003) (Level 4 Data) Download Currency: 1000 Zhu Long Coin.
GB _ T _ 19623-2004 labor capacity Quota for Communication Signal Engineering of Urban Rail Transit (Level 4 Data) Download Currency: 350 Zhu Longbi.
GB _ T _ 19622-2004 labor capacity Quota of Urban Rail Transit Subway Project (Level 4 Data) Download Currency: 350 Zhu Longbi.
GB _ T _ 1962 1-2004 labor capacity Quota of Urban Rail Transit Light Rail Project (Level 4 Data) Download Currency: 350 Zhu Longbi.
Labor quota for overhaul of substation equipment (oil and gas industry standard) (level 4 data) Download currency: 800 Zhu Long coins.
Power Engineering Budget Quota 200 1 Revised Edition-Processing and Distribution Products (Level 4 Data) Download Currency: 700 Zhu Longbi.
Labor quota of power supply line installation project (level 4 data) Download currency: 500 Zhu Longbi.
Management system and regulations of capital construction budget in electric power industry (scanned version) (level 4 data) Download currency: 500 Zhu Longbi.
Calculation Rules for Budget Quantity of National Unified Installation Project (2000) (Level 4 Data) Download Currency: 400 Zhu Longbi.
National unified installation engineering electronic version (GFD-20 1- 1999) (four-level data). Download currency: 450 Zhu Longbi.
National unified calculation rules for budgetary quantities of construction projects (civil engineering) (level 4 data) Download currency: 300 Zhu Longbi.
Power Engineering Budget Quota 200 1 Revised Edition-Construction Engineering (Volume I) (Level 4 Data) Download Currency: 500 Zhu Longbi.
Power Engineering Budget Quota 200 1 Revised Edition-Building Engineering (Volume II) (Level 4 Data) Download Currency: 500 Zhu Longbi.
National Unified Municipal Engineering Budget Quota Volume I General Project (Level 4 Data) Download Currency: 1 0,000 Zhu Longbi.
Budget Quota of National Unified Municipal Engineering Volume III Bridge and Culvert Engineering (Grade IV Data) Download Currency: 1200 Zhu Longbi.
Unified Budget Quota for National Municipal Engineering Volume IV Tunnel Engineering (Level 4 Data) Download Currency: 1000 Zhu Longbi.
National Unified Municipal Engineering Budget Quota Volume 5 Water Supply Project (Level 4 Data) Download Currency: 1 0,000 Zhu Longbi.
National Unified Budget Quota for Municipal Works Volume VI Drainage Works (Level 4 Data) Download Currency: 1200 Zhu Longbi.
National Unified Municipal Engineering Budget Quota Volume VII Gas and Central Heating (Level 4 Data) Download Currency: 1 0,000 Zhu Longbi.
National Unified Municipal Engineering Budget Quota Volume VIII Street Lamp Project (Level 4 Data) Download Currency: 1 0,000 Zhu Longbi
Budget quota of communication construction project (electronic version) (level 4 data) Download currency: 700 Zhu Long coins.
China Petroleum and Natural Gas Standard-Labor Quota for Petroleum Machinery Processing (Grade 4 data) Download Currency: 500 Zhu Longbi.
China Petroleum and Natural Gas Standard-Labor Quota for Underground Operation (SY _ T _ 5 176) (Grade 4 data) Download Currency: 600 Zhu Longbi.
Detailed Rules for Investment Compilation of Water and Soil Conservation Project of Hydropower Construction Project (Trial) 2005 (Grade IV Data) Download Currency: 365,438+00 Zhu Longbi
Code for Urban Land Valuation (Grade 4 Data) Download Currency: 400 Zhu Longbi.
Description of budget quota and budgetary estimate index of petroleum construction and installation project (four-level data) Download currency: 450 Zhu Longbi.
Design Labor Quota for Civil Buildings (2000 Edition) (Level 4 Data) Download Currency: 150 Zhu Longbi.
Electronic version of soil and water conservation engineering estimation quota (four-level data) Download currency: 400 Zhu Longbi.
Man-hour quota of soil and water conservation machinery Excel version (level 4 data) Download currency: 350 Zhu Longbi.
Newly compiled water conservancy and hydropower project budget (level 4 data) Download currency: 500 Zhu Longbi.
Budget Quota of Electric Power Construction Project in 2002 Volume IV-Transmission Line Project (Level 4 Data) Download Currency: 150 Zhu Longbi.
Power Engineering Construction Budget Quota-Construction Engineering (Volume I) (Level 4 Data) Download Currency: 200 Zhu Longbi.
Power Engineering Construction Budget Quota-Construction Engineering (Volume II) (Level 4 Data) Download Currency: 200 Zhu Longbi.
200 1 Edition Quota Interpretation of Metallurgical Industry Construction Project Budget Quota (Level 4 Data) Download Currency: 300 Zhu Long Coin.
Description of Highway Engineering Budget Quota (Level 4 Data) Download Currency: 200 Zhu Longbi.
National Unified Construction Engineering Foundation Quota Civil Engineering (Volume I and Volume II) (Level 3.7 data) Download Currency: 400 Zhu Longbi.
Railway Engineering Budget Supplementary Quota Library (EXCEL) (3.5-level 3.5 data) Download Currency: 400 Zhu Longbi.
Budget Quota of Water Conservancy and Hydropower Equipment Installation Project in 2002 (First Ten Chapters) (Grade 3.5 Data) Download Currency: 350 Zhu Longbi.
GB-T50353-2005 (Grade 3.5 data) Code for Calculation of Building Area of Building Engineering Download Currency: 300 Zhu Longbi.
Liaoning Province Land Consolidation Budget (Grade 3.5 data) Download Currency: 220 Zhu Longbi.
The latest electronic construction project budget quota-Volume 1 Radar cable TV and special communication equipment (level 3.2 data) Download currency: 2500 Zhu Longbi.
National unified construction machinery machine-shift expense quota 98th edition (Excel) (3-level data) Download currency: 400 Zhu Longbi.
The compilation method of highway engineering final accounts and the final accounts table (2004) (level 3 data) Download currency: 180 Zhu Longbi.
Guiding Opinions on Preparation of Bidding Documents for Construction Projects in Beijing (Grade III Data) Download Currency: 120 Zhu Longbi.
EXCEL) (3 third-level data) Railway project budget: 300 Zhu Longbi.
Measures for the compilation of budgetary estimates for highway capital construction projects [1996] No.612 (third-level data) Download currency: 150 zhulongbi.
Budget Quota of Newly-built Railway Track Project (2006- 15) (Level 3 Data) Download Currency: 200 Zhu Longbi.
Budget Quota of Water Supply and Drainage Project of Newly-built Railway (2006- 15) (Level 3 Data) Download Currency: 200 Zhu Long Currency.
Budget quota of newly-built railway electric traction power supply project (2006- 15) (level 3 data) Download currency: 300 Zhu Longbi.
Budget Quota of Railway Bridge and Culvert Project (2005- 15) (Grade III data) Download currency: 200 Zhu Long coins.
Budget Quota of Railway Tunnel Project (2004-47) (Level 3 Data) Download Currency: 200 Zhu Longbi.
Budget Quota of Newly-built Railway Subgrade Project (2004-47) (Grade III Data) Download Currency: 200 Zhu Longbi.
Supplementary quota of standard high-speed railway (level 3 data) Download currency: 200 Zhu Longbi.
Quota of Double-track Simply Supported Box Girder of Railway Passenger Dedicated Line (Grade III Data) Download Currency: 150 Zhu Longbi.
Charging Standard for Safety Monitoring of Hydropower Engineering (2005) (Level 3 Data) Download Currency: 200 Zhu Longbi.
Compilation method of budgetary estimate (budget) for railway capital construction project design (level 3 data) Download currency: 200 Zhu Longbi.
Revision of compilation method of budgetary estimate for railway capital construction project design (Grade III data) Download currency: 150 Zhu Longbi.
Irrigation quota in various regions of Gansu (level 3 data) Download currency: 200 Zhu Longbi.
Hourly cost quota of construction machinery for hydropower projects (2004 edition) (level 3 data) Download currency: 200 Zhu Longbi.
Manual quota for electrical installation of power system (EXCEL) (3-level data) Download currency: 150 Zhu Longbi.
Shandong Province Installation Engineering Consumption Quota 03 Provincial Quota (Level 3 Data) Download Currency: 150 Zhu Longbi.
Railway Freight Rules (Level 3 Data) Download Currency: 200 Zhu Longbi.
Budget Quota for Installation of Small and Medium-sized Water Conservancy and Hydropower Equipment -92 Edition (Level 3 Data) Download Currency: 300 Zhu Longbi
Charging Standard for Engineering Survey and Design (revised in 2002) Full Edition (Grade III Data) Download Currency: 200 Zhu Longbi.
Design compilation method and cost standard of feasibility study report of hydropower project (electric water gauge [1997] 123 (third-level data) Download currency: 180 Zhu longbi.
Basic Quota of Railway Engineering (Jianji No.2003-34) EXCEL Edition (Level 3 Data) Download Currency: 400 Zhu Longbi.
EXCEL version of railway track engineering budget quota (1994-78) (three-level data) Download currency: 350 zhulongbi.
The whole installation project budget quota (three-level data) electronic version (2000) Download currency: 300 Zhu Longbi.
National Reference Quota and Quota of Building Decoration Engineering (2003) (Level 3 Data) Download Currency: 300 Zhu Longbi.
Budget Quota of Metallurgical Industry Construction Project (200 1 Edition) (Level 3 Data) Download Currency: 350 Zhu Longbi.
Composition and calculation standard of estimated cost of water conservancy and hydropower projects (three-level data) Download currency: 160 zhulongbi.
Man-hour quota of oil drilling machinery (EXCEL) (3 third-level data) Download currency: 200 Zhu Longbi.
The latest electronic version of the construction project budget quota EXCEL version (three-level data) Download currency: 400 Zhu Longbi.
Compilation method of investment estimation for feasibility study of chemical construction projects (Grade III data) Download currency: 140 Zhu Longbi.
Hourly fee quota of construction machinery for hydropower projects in 2004 (EXCEL version) (level 3 data) Download currency: 400 Zhu Longbi.
China Oil and Gas Industry Standard-Labor Quota for Warehouse Material Storage (1992) (Level 3 data) Download Currency: 350 Zhu Longbi.
Regulations for Calculation of Engineering Quantity of Water Conservancy and Hydropower Projects (1999) (Grade III data) Download currency: 200 Zhu Longbi.
National Unified Municipal Engineering Budget Quota Volume II Road Engineering (Level 3 Data) Download Currency: 800 Zhu Longbi
Compilation method of feasibility study report for wind farm project (Grade III data) Download currency: 180 Zhu Longbi.
Compilation method of cost estimation of safety prevention project (three-level data) Download currency: 120 zhulongbi.
[Zhejiang] Detailed Rules for Compilation of Cost Quota and Budget of Water Conservancy and Hydropower Projects (Grade III Data) Download Currency: 200 Zhu Longbi.
Ministry of Water Resources 86, 97, 02 quota mechanical shift (hour) fee calculation spreadsheet (three-level data) Download currency: 2 10 Zhu Longbi.
General description and chapter description of port hydraulic construction quota in 2004 (three-level data) Download currency: 100 zhulongbi.
China Oil and Gas Standard-Labor Quota for Oil Communication Operation and Maintenance (Level 3 Data) Download Currency: 300 Zhu Longbi.
China Petroleum and Natural Gas Standard-Labor Quota for Oil and Communication Equipment Installation Project (Level 3 Data) Download Currency: 300 Zhu Longbi.
Complete Description of Water Conservancy and Hydropower Quota (1987-2002) (Level 3 data) Download Currency: 200 Zhu Longbi.
Description of construction project budget quota in building materials industry (level 3 data) Download currency: 200 Zhu Longbi.
Compilation method of cost estimate for safety prevention project (GA/T70-94) (Grade III data) Download currency: 200 Zhu Longbi.
The latest regulations on the compilation of hydraulic budgetary estimate of coastal ports in 2004 (three-level data) Download currency: 350 Zhu Longbi.
Maintenance quota standard of water conservancy projects (level 3 data) Download currency: 200 Zhu Longbi.
Compilation and specification of budgetary estimate for design quota of water conservancy projects (Grade III data) Download currency: 200 Zhu Longbi.
The quota of water conservancy and hydropower projects of the Ministry of Water Resources (199 1) (level 3 data) Download currency: 100 Zhu Longbi.
2002 Water Conservancy Project Construction Machinery Unit Hourly Fee Quota Library (Level 3 Data) Download Currency: 200 Zhu Longbi.
Time limit quota of power engineering project (three-level data) Download currency: 180 Zhu Longbi.
Measures for Compilation of General Budget Estimate and Budget for Highway Capital Construction Projects (issued by the Ministry of Communications) (Grade III data) Download currency: 160 Zhu Longbi.
Cost analysis table of hydraulic engineering construction machinery in 2002 (level 3 data) Download currency: 120 Zhu Longbi.
Supplementary quota of modified asphalt waterproofing membrane (level 3 data) in National Unified Basic Quota of Building Engineering Download currency: 30 Zhu Longbi.
Provisions of the Ministry of Construction on the Division of Engineering Construction Equipment and Materials (Level 3 Data) Download Currency: 30 Zhu Long Coins.
Electric Power Quota Construction Project Budget Quota Publicity (Level 3 Data) Download Currency: 80 Zhu Longbi
Compilation Rules for Environmental Protection Design of Water Conservancy and Hydropower Projects (Draft for Comment) (Level 2.5 Data) Download Currency: 120 Zhu Longbi.
National Water Conservancy Quota Electronic Edition (2002 Edition) (Grade 2.5 Data) Download Currency: 320 Zhu Longbi.
Software for budgetary estimate of water conservancy and hydropower projects (EXCEL) (2.3 data of grade 2.3) Download currency: 550 Zhu Longbi.
Dongguan implements a special account for fixed labor costs and wages to pay workers' wages (Dong Jian [2006] No.7) (secondary data) Download currency: 30 Zhu Longbi.
Opinions on some specific issues concerning the budgetary estimate of hydropower project design (secondary data) Download currency: 80 Zhu Longbi.
1997 regulations on budgeting of dredging projects (secondary data) Download currency: 100 Zhu longbi.
National Interim Measures for Valuation with Bill of Quantities for Building Decoration (Secondary Data) Download Currency: 50 Zhu Longbi.
96 Highway Engineering Quota (excel Edition) (Secondary Data) Download Currency: 180 Zhu Longbi.
Opinions of the Ministry of Communications on Improving Highway Budget Estimation Method Document No.230 [2005] (Secondary Data) Download Currency: 80 Zhu Longbi.
Guide to Environmental Impact Consulting Fees (Secondary Information) Download Currency: 20 Zhu Long.
General description and chapter description of port equipment installation quota in 2004 (secondary data) Download currency: 100 zhulongbi.
[Guangdong] Construction Project Valuation Basis Supplementary Items and Question Answers (Secondary Data) Download Currency: 100 Zhu Longbi.
Engineering design fee standard (2002) (secondary data) Download currency: 120 zhulongbi.
Compilation method of final accounts of highway construction projects in 2004 and its schedule (secondary data) Download currency: 40 Zhu Longbi.
Guide to Budget Preparation of Highway Maintenance Projects (2002) (Secondary Data) Download Currency: 50 Zhu Long.
Water intake quota for electric power Part 7: Alcohol manufacturing (Level 2 data) Download currency: 100 zhulongbi.
Water quota for electric power-Part 5 Paper products (secondary data) Download currency: 100 zhulongbi.
Water Quota for Electricity-Part 4 Cotton Printing and Dyeing Products (Secondary Data) Download Currency: 100 Zhu Longbi.
Power Water Quota-Part 3 Petroleum Refining (Secondary Data) Download Currency: 100 zhulongbi.
Water intake quota for electric power-Part 2: Iron and Steel Joint Venture (secondary data) Download currency: 100 zhulongbi.
Power water quota-part 1 thermal power generation (secondary data) Download currency: 100 Zhu Longbi
Sinopec maintenance quota regulations (secondary data) Download currency: 70 Zhu Longbi.
Measures for the Administration of Audit Procedures for Budget Settlement and Final Accounts of Capital Construction Projects (Secondary Data) Download Currency: 100 Zhu Longbi.
Jian Biao [2003] No.206 Construction Safety Project Cost Composition (Secondary Data) Download Currency: 50 Zhu Longbi.
Communication line engineering budget quota supplementary quota (secondary data) Download currency: 100 Zhu Longbi.
Interim Measures for the Administration of Fees for Bidding Agency Services [2002] 1980 (Secondary Data) Download Currency: 50 Zhu Longbi.
Regulations on the calculation of construction area (secondary data) Download currency: 40 Zhu Longbi.
Fujian Province 200 1 Description and calculation rules of decoration quota (secondary data) Download currency: 1 10 Zhu Longbi.
2002 Electric Power Quota Construction Project Budget Quota Compilation Description (Secondary Data) Download Currency: 50 Zhu Longbi.
200 1 explanation of budget quota for shaft and lane engineering in non-ferrous mines (secondary data) Download currency: 1 10 Zhu longbi.
Compilation method of budgetary estimate for railway construction project design 1 15 (1998) (secondary data) Download currency: 100 zhulongbi.
Supplementary Provisions on Budget Estimate of Highway Engineering in Yunnan Province (Secondary Data) Download Currency: 50 Zhu Longbi.
"Railway Engineering Budget Compilation Method" (Document No.78) (secondary data) Download currency: 150 Zhu Long currency.
Compilation method of final accounts of highway capital construction (1992) (secondary data) Download currency: 35 Zhu Longbi.
Basic data and calculation formula of coastal hydraulic quota (secondary data) Download currency: 100 zhulongbi.
The latest railway bridge and culvert budget rate tables (Tiejian -42 and 1 15) (secondary data) Download currency: 100 Zhu Longbi.
Railway Bridge and Culvert Budget Quota Library No.47 (Secondary Data) Latest Edition 2005 Download Currency: 80 Zhu Longbi.
/flml/ZJ 1820.html