What details should engineering cost engineers pay attention to?

In the project cost, there are many things that need attention, which will affect the construction and competition of the project, so let's learn about the details that the project cost engineer should pay attention to.

1. Precast slab beam concrete: slab beam head concrete, transportation and installation;

2. Roof line and cover plate; Mainly sporadic parts!

3, some sporadic, small component concrete is easy to miss;

4. The concrete calculation of constructional column ring beam template:

5. Quick and simple convergent nets set when pouring different grades of concrete;

6. Some specifications are also easy to miss. For example, if the wall is more than 5 meters long, structural columns should be added, and if the wall is more than 4 meters high, pressure beams should be added;

7, toilet and other concrete flanging on the wall.

8. There is no detailed layout, just the items mentioned in the drawings. Such as structural columns of infilled walls, masonry reinforcement, etc.

9, easy to leak metal heat pipe set in mass concrete;

10, the negative reinforcement distribution reinforcement of the slab is easy to leak reinforcement, because it is not reflected in the drawing at all;

1 1, there is something easy to forget in the steel frame, that is, the horse stool used to support steel bars, which is not a small amount in actual construction.

I believe that after the above introduction, everyone has a certain understanding of the details that engineering cost engineers should pay attention to. Welcome to Zhong Da for more information.