Has the inspection fee of Beijing Construction Engineering been included in the unit price?
1. According to Article 2.0.8 of Code for Valuation of Construction Engineering Bill of Quantities (GB50500-20 13), the comprehensive unit price refers to the labor cost, materials and engineering equipment cost, construction machinery use fee, enterprise management fee, profit and risk cost within a certain range required to complete a specified list item. 2. According to Article 5.2.2 of Code for Valuation of Construction Engineering Bill of Quantities (GB50500-20 13), the comprehensive unit price shall include the risk range and expenses that shall be borne by the bidder as specified in the tender documents. If it is not clear in the tender documents and is compiled by the cost consultant, it shall be submitted to the tenderer for clarification; If compiled by the tenderer, it should be clear.