In 2004, the company developed and built the "New Building" project at No.91Qingyang Road, Lanzhou City. The project is a commercial and residential complex with frame-shear wall structure, with three floors underground and 28 floors above ground, with a construction area of 29,600 ㎡ and a total investment of 80 million yuan. It was delivered at the end of 2006. Now the residential part has been basically sold out, 1 shops on the 6th floor are for rent, and the 26th and 27th floors are office buildings of the group company.
On June 20, 2006, the group company acquired 148.38 mu of land in Jiangdu City, Yangzhou City, Jiangsu Province by listing, which was the first high-grade real estate developed and built by the group company outside the province. The preliminary planned building area of this property is180,000 square meters, with a planned total investment of 400 million yuan.
In July, 2007, at the 14 Lanzhou Fair, the group company and Guanghe County People's Government signed an agreement on the development and construction of Taohe Qijiaping Hydropower Station. On June 28th, 2007, 10, "Taohe Qijiaping Hydropower Station Project" was formally laid. This power station is a diversion power station with a total installed capacity of 20MW, an annual total power generation of 65.438+0.44 billion kWh, a static total investment of 200 million yuan, an estimated annual income of 36 million yuan, and a planned construction period of 654.38+0.8 months. It will be officially generated before June 30, 2008.
On June+10/October, 2007, the group company signed the development and operation agreement of Wangjiamo Hydropower Station in Lintao County with China Merchants Bureau. In February 2007, the power station was approved by the Development and Reform Commission of Gansu Province. The power station is a diversion power station with total installed capacity 1.5 MW, annual total power generation1.37 billion kwh, static total investment1.90 billion yuan, estimated annual income of 30 million yuan and planned construction period of 22 months. Power generation was officially started before May 2009 1.
In June 2007, the company invested more than 4 million yuan in oil exploration in Changqing Oilfield, and has now entered the trial exploration work.
(4) Construction of projects under construction
In 2007, the group company undertook the construction of Yijingyuan Community in Lanzhou, Tianqing Business Building, Experimental Building of Heping Campus of Lanzhou Business School, renovation of PetroChina oil depot and network construction of gas stations, Linxia Unified Building, Huanzhen Highway in tuqiao town, Linxia County, Hezheng County High School and other projects. Up to now, the accumulated construction output value is 65.438+0.3 billion yuan.