Hefei new house decoration, second-hand housing, rental housing decoration which is better?

Hefei Yuma is well decorated. Steps of house decoration: inspect the market, determine the decoration scheme, carry out construction according to the scheme, and decorate other projects except construction.

Specific steps:

1. Investigate the market and visit neighbors: according to the local specific conditions, know the market quotation of materials and the specific price of construction (to lay the foundation for signing the contract in the next step); Visit the owner who decorated or signed the contract, first, to see the effect, and second, to learn from the experience.

2. After you have some ideas of your own, then choose a decoration company: according to the interview, you will have a preliminary idea in all aspects-which is of great benefit to choosing a decoration company and further communicating various situations. Before determining the company, the company needs to issue a design scheme suitable for the owner's mind according to some ideas of the owner. After you have a plan, it's time to sign the contract;

3. The signing of the contract is very important, which is the guarantee for both parties to successfully complete the construction. The signing of the contract should be comprehensive and clear: for the main materials, the owner needs to master the physical samples for later comparison; The unit price and engineering quantity of the project should be clear: know the specific construction location, how much to do and where to do it, so as to prevent a large number of additions from appearing in the final settlement. When signing a contract, you should check whether the engineering quantity, the pricing unit and, most importantly, the construction technology and the materials used are value for money.

4. Construction stage according to the contract: With the construction contract and construction technology, the construction needs to be carried out step by step. At this time, it is necessary to know some specific construction sequence, when and what materials will enter the site-check whether the main materials entering the site are in line with the contract. The most important thing at this stage is the construction of some concealed works that need special attention, such as water and electricity embedding. At the same time, the decoration company is required to make records of concealed works, and it is best to take out the drawings of embedded hydropower and give them to the owner for retention;

General construction sequence: main body demolition, water and electricity transformation, carpentry entering the site, wall tile pasting, wall painting, wooden door installation, floor installation, wallpaper laying, switch socket lamp installation, hardware sanitary ware installation, curtain installation, etc.

5. Other parts: cleaning, furniture entry, etc. I won't go into details here.