General situation and characteristics of the project
Section 1: Project Overview
Project Name: Mianyang Maternal and Child Health Hospital Post-disaster Reconstruction Project
Construction unit: Mianyang Maternal and Child Health Hospital
Designer: 11th Design and Research Institute of Information Industry Electronics Co., Ltd.
Project Nature: New
The project of Mianyang Maternal and Child Health Hospital, which is about to start, is located in Fucheng Road Maternal and Child Health Hospital, Mianyang City, with an area of 405.44m2, a building area of 4344. 16m2 and a building height of 37.20M It is a 10-storey frame structure, with local1floor. The foundation adopts hand-dug belled cast-in-place pile, and the main body is full cast-in-place frame structure. This project has simple and generous architectural modeling, reasonable layout and complete maternal and child health care functions. The successful completion of the project will definitely have a positive impact on the development of the whole hospital.
Part II: Overview of the site.
I. Overview of the website
The project is located in Mianyang Maternal and Child Health Hospital, with a large flow of people and cars. The site covers a small area and is close to the original building; The original cement road in the hospital can meet the construction needs; The construction water source and power supply can meet the construction needs, and the site has achieved three links and one leveling.
Second, the hydrometeorological conditions
This area belongs to the subtropical monsoon climate in the north of Sichuan Basin, with mild climate and abundant rainfall.
The annual average temperature is 16.3℃, the annual average precipitation is 960.4mm, and the maximum precipitation is 306 mm The precipitation time is mostly concentrated in March and July-September every year, accounting for 75.5% of the annual precipitation. The wind direction is mainly northeast wind, with maximum wind speed 16.3m/s and annual average relative temperature of 79%. The annual minimum temperature in this area is from 65438+February to 1 month, and the minimum temperature is about -5℃. The groundwater level in the site is low, so the influence of groundwater can not be considered in foundation construction.
Section 3: Architectural Design
I. Layout
The whole building is concave, divided into maternal and child health hospital and underground fire pool. Among them, the proposed building is 28.45m long, 19.57m wide and 37.20m high, with a construction area of 4344. 16m2, with main 10 floor and local10 floor. The basement is a groundwater pump house and a fire pool. The first floor is the infirmary, including the infirmary, fire duty room, warehouse, locker room, pharmacy and other auxiliary rooms; The second floor is auxiliary rooms such as specimen storage room, laboratory, observation room and blood storage room; The third floor is the neonatal non-infected area, isolation ward, doctor's office and other rooms; The fourth floor is the delivery room, isolation delivery room, general waiting room and other auxiliary rooms; The fifth floor is the operating room, dressing room, anesthesia recovery room and other supporting rooms; The sixth floor is the academic lecture hall, reception room and fire front room; The seventh floor is the office, and the eighth floor is the office, archives and reading room. The ninth floor is the dean's office and the big conference room; The tenth floor is the office.