Commitment letter of project quality 1 to: _ _ _ _ _ _ _ (bidder)
Our company was lucky enough to win the bid in _ _ _ _ _ _. In addition to responding to all the terms of the bidding documents and the contents of the performance contract, we make the following commitments to the construction quality of the project:
1. Technical disclosure: read and understand the drawings carefully, make technical disclosure and sign for confirmation.
According to the bidding documents, the corresponding construction organization design is arranged in detail according to the actual project content, so as to ensure the realization of project quality and construction period.
2. No subcontracting: Ensure that the winning project will not be subcontracted and accept the supervision of the construction unit at any time.
3. Raw material guarantee: cooperate closely with the supervision unit, strictly control the quality of materials, never cut corners, and create first-class quality with first-class construction.
4. Inspection and test: The measuring instruments and mechanical tools involved in quality supervision and safety inspection are all within the inspection and verification cycle.
Ensure the construction quality from the construction tools and measuring and testing equipment.
5. Safe production: mobilize our positive factors to prevent quality accidents.
Safe production and zero casualties.
Ensure the realization of engineering objectives.
6. Office data: Self-inspection and joint inspection shall be carried out for partial projects, and traceable inspection records and office data shall be established and properly kept.
7. Quality self-inspection: Before all projects are submitted for inspection, the project leader will take the lead, the project manager will take the lead, and the quality inspector of the project department, full-time safety officer, construction team leader and personnel of the company's quality inspection department will form a team to conduct self-inspection, and then report to the supervisor and the owner for acceptance.
8. Completion acceptance: the project quality reaches the qualified standard.
9. Warranty period: After the project is completed, according to the national standards and industry norms, we will be responsible for the two-year free warranty of the project quality, and realize our faithful promise with high-quality service.
The above is our company's commitment to project quality. If we fail to meet the standards required by Party A and promised by us during the construction process, and we are directly responsible for the quality problems in the construction process, we are willing to be fined (5)% of the project cost.
If the circumstances are serious, those who are willing to accept the punishment of laws and regulations will automatically withdraw from the scene.
Commitment unit: _ _ _ Facilities Co., Ltd. (official seal)
Legal Representative: _ _ _ _ _ _ _ (signature)
20____ _ _ _ _ _ _ _ _ _ _ _ _
2 1. For all the contracts directly signed by our company and the project owner, our company promises to perform our obligations in strict accordance with the contract provisions, work closely with the owner, and carry out the construction in strict accordance with the provisions of the current national norms, ensuring the quality, quantity and construction period, and there will never be any violation of the norms.
2. After signing the contract with the owner, our company will send professionals to track and guide the whole construction process to ensure the quality of waterproof engineering and avoid unnecessary rework.
3. Our company enters the site for construction, and welcomes the owners to supervise our construction projects and put forward valuable opinions to ensure that unqualified products are never used, or shoddy products are used to make the best use of them, and the phenomenon of cutting corners is resolutely put an end to.
4. During the construction period, our company will send professional technicians to coordinate with the owner and supervise our construction quality and time limit. Throughout the whole process, and before the construction of the next working procedure, we will supervise, inspect and protect the careless man-made damage of our finished products to ensure that our waterproof quality meets the design, specifications and owner's requirements.
5. In case of leakage caused by our construction quality or poor supervision, our company will be responsible for rework without any charge.
6. All waterproof works constructed by our company shall ensure no leakage within the statutory warranty period; If there is leakage, it is caused by the construction or material quality of our company. Our company will provide free maintenance in time, and we will provide on-site service within 24 hours after receiving the call. During the warranty period, if there is leakage caused by human factors, the company will assist customers to properly handle it.
7. All waterproof projects constructed by our company are recorded in customer files, and a 24-hour waterproof service hotline 0412-3871129 is set up for regular quality tracking and customer complaints. We will be at
After each heavy rain, call back or send someone to visit, not less than three times in a row, not less than three times a year, and the shortest is not less than five years. Ensure the quality tracking service to customers.
8. The warranty period of the waterproof project constructed by our company is 5 years, and we promise lifelong maintenance responsibility.
9. Supervision of service commitment: The inspection of service commitment is directly led by the general manager of the company. Haicheng haisi new waterproof coiled material co., ltd
20xx65438+1October 8th
Complaint consultation telephone (customer service telephone): 04 12-387****
Project Quality Commitment Letter 3: Shenyang Dadong District Urban Management Bureau and Dadong District Government Procurement Center: According to Dadong District Traffic Engineering Design, Supervision and Construction Team Library [ProjectNo.: dd(p)
20xx-0224] and our company's understanding of the bidding documents, we make the following commitments to the quality assurance and after-sales service of this project:
First, after-sales service commitment
1. quality assurance: the first-time acceptance rate of sub-projects is 100%, all of which are qualified.
2. Duration guarantee: Within 7 days after signing the contract, all personnel, machinery and testing instruments will enter the site. In the case that Party A's funds are not in place, ensure continuous construction, ensure that the project is completed according to the construction period, and the acceptance reaches the qualified standard.
3. Warranty period: the bidding documents and relevant national standards shall be implemented. (For details, please refer to the Annex Commitment to Guarantee Construction Quality.)
4. After-sales service response time: When the project needs maintenance, it will respond within 2 hours after receiving the warranty call and arrive at the site within 24 hours.
5. Service working hours: 24 hours a day, 7 days a week.
6, the completion acceptance data is complete, standardized and effective.
Second, after-sales service guarantee
1, company strength guarantee: our company has two flexible after-sales service teams, and the product marketing department has set up a special after-sales service phone.
2. After-sales service system guarantee: the company will establish data files for the streets participating in this project to facilitate rapid response.
3. Maintenance response procedure: Go to the site to make maintenance analysis and maintenance report within hours after receiving the user's maintenance report, and enter it into the file.
4. After the warranty period: the labor is free, and the material fee is charged at 95% of the market price (if the contractor is qualified for material maintenance).
Iii. Acceptance procedures
(1) acceptance procedures and contents
1. Pay the performance bond in time according to the requirements of the tender documents within the specified time after receiving the letter of acceptance. And sign a construction contract with the owner.
2. Before signing the contract, organize relevant personnel, mechanical equipment and test instruments to get ready for entering the site.
3. The measuring instruments and mechanical tools involved in quality supervision and safety inspection are within the verification period.
5. Self-inspection and joint inspection shall be carried out for partial projects, and traceable inspection records shall be established and properly kept.
6. Submit all the projects. The company is led by the project leader, with the project manager as the team leader, and the team composed of the quality inspector, full-time safety officer, construction team leader and the company's quality inspection department of the project department conducts self-inspection, and then reports it to the supervisor and the owner for acceptance.
(2) Product confirmation
1, and accept the products according to the bidding documents, addendum documents and construction drawings.
2, according to the supervision, design unit visa change drawings, instructions, meeting minutes and other acceptance of products.
3, according to the national standards and industry standards for product acceptance.
Four. Complaint system and contact information
1. Contact: Shenyang Fengtong Road Facilities Co., Ltd. Contact: * * Manager.
Tel: 000-00000000000-00000000 Tel: 000-000000000.
Address: No.61KLOC-0, Shenda Road, Yuhong District, Shenyang.
2. Service hotline and complaint telephone number: 024-0000000000000000000000000.
Commitment: Shenyang Feng Tong Road Facilities Co., Ltd. (Seal)
Legal Representative: (Signature)
20xx August 18
Project Quality Commitment Article 4 (Full Name of Quotation Unit) authorizes representatives to participate in the bidding and purchasing activities of Wuzhong Education primary and secondary school book projects organized by your center, and make bids. We have carefully studied all the responsibilities and obligations of bidders stipulated in your bidding and purchasing documents.
1, willing to provide all the goods and accessories that meet all the requirements of the bidding documents.
Parts, at the same time responsible for the transportation of goods, miscellaneous insurance, taxes, etc. , the total quotation and details are shown in the tender quotation sheet;
2. If our bid is accepted, we will strictly implement the bidding documents.
For each specified demand, fulfill the supply obligation on time, with good quality and quantity. And provide several years of free warranty;
3, we agree that according to the provisions of the tender documents, the validity of this tender is
30 days after bid opening;
4. We are willing to provide all the information required by the tenderee in the tender documents; We think you have the right to decide the winning bidder, and you also have the right to accept or.
Reject all bidders;
6. We are willing to abide by the expenses listed in the tender announcement in the tender documents; 7. The bid shall remain valid in the process after the bid opening, without any modification and
Change;
8, we are willing to pay the deposit according to the provisions of the tender documents;
If we win the bid, we are willing to pay the performance bond when signing the contract.
RMB ten thousand Yuan only; 10, comprehensive description:
(1) Accompanying services and coordination measures; (2) Ask the buyer to provide cooperation;
(3) Deviation explanation of different opinions on the bidding documents; (4) Other explanations.
For all letters and telegrams related to bidding, please contact the following address: unit: postal code: contact person: address: bank: telephone: account number: fax: name (signature) of authorized representative:
Full name of bidder: (official seal)
Contract reference book
Supplier: (hereinafter referred to as Party A) Demander: (hereinafter referred to as Party B) Purchase number: Cai Wu (public) [20xx]0 10.
Party A was determined as the successful supplier by the wuzhong Municipal Government Procurement Center through public bidding. Through consultation, both parties agree to sign this contract according to the following terms.
I. Name, quantity and specifications of the subject matter of the contract:
Second, the total contract price:
Contract amount: (in words) (¥)
Three, before the performance of the contract, the winning supplier must pay the quality deposit (performance bond), and the goods will be returned without interest after acceptance.
4. Payment plan: 70% deposit will be paid after inspection, and the remaining three months will be paid off.
Verb (abbreviation for verb) Delivery time, place and acceptance:
1. Delivery time: before 2nd. Place of delivery: wuzhong Education Bureau.
3. When Party A provides goods to Party B, it must provide the following information: packing list, product quality inspection certificate, ex-factory inspection report, product installation instructions, warranty certificate, etc. VI. After-sales service and quality assurance: 1, and Party A is responsible for the quality of the goods it provides.
2. The quality guarantee period shall be implemented according to the after-sales service terms or bidding documents provided by the manufacturer (other quality guarantee preferential conditions provided by Party A shall be indicated), and the quality guarantee period shall be 3 years. In case of quality problems during the quality guarantee period, Party A shall be responsible for repairing, replacing or returning goods, and bear all expenses arising therefrom; If problems are caused by Party B's improper use, Party A shall actively cooperate to solve them, and the expenses shall be borne by Party B, and the longest maintenance or replacement time shall not exceed days.
4. If Party A fails to reply within days after receiving Party B's notice, it shall be deemed that Party A has acknowledged the quality problem, and Party B has the right to handle it by itself, and all expenses arising therefrom shall be borne by Party A..
5. In case of any dispute over the quality of goods, the wuzhong Bureau of Quality and Technical Supervision or its designated technical department shall conduct quality appraisal. The appraisal conclusion is final and should be accepted by both parties. Seven. responsibility for breach of contract
1. If Party B refuses to receive the goods or refuse to pay the goods without justifiable reasons, it shall pay a penalty of% of the total payment to Party A. ..
2. If the brand, model, specification, color and quality of the goods provided by Party A do not meet the standards stipulated in the contract, Party B has the right to reject the goods, and Party A shall pay Party B a penalty of% of the total payment. Meanwhile, the government procurement center has the right not to refund the performance bond (quality bond) paid by Party A in advance.
3. If Party A fails to deliver the goods on time, Party A shall pay Party B a penalty of% of the total payment for each day overdue. Eight, training plan:
1. Training time and content: 2. Training method: 3. Number of trainees: 9. Composition of contract documents: 1. Bidding documents.
2. Bidding documents (written commitment, bid quotation) 3. bid notice
The above documents are an integral part of the contract and both parties must fully abide by them. If there is any violation, it shall be liable for breach of contract. X. Force Majeure:
During the performance period of the contract, if either party fails to perform the contract due to force majeure, it shall immediately notify the other party and submit the certificate issued by the relevant authorities, then the performance period of the contract may be extended, which is opposite to the period affected by force majeure. If the force majeure lasts for more than days, both parties shall decide whether to continue to perform the contract through friendly negotiation. XI。 Settlement of disputes:
Disputes arising from the performance of this contract shall be settled by both parties through consultation; If negotiation fails, both parties agree to arbitration by Wuzhong Arbitration Commission, which is final and binding on both parties. Unless otherwise awarded by the arbitration institution, the arbitration fee shall be borne by the losing party.
12. This contract is made in quintuplicate and shall come into effect after being signed and sealed by both parties. Thirteen. Matters not covered in this contract shall be handled in accordance with the relevant provisions of the Contract Law.
Project Quality Commitment Article 5 Project Name:
Team where the project is located:
Construction site:
Planned duration of the project: MM DD YY to MM DD YY.
Work unit:
In order to strictly manage the safety, quality, progress and cost of the project, supervise the whole construction process, strictly control the quality of the project, and ensure the rights and obligations of both the construction unit and the construction unit, the following clauses are formulated, and the construction unit is requested to strictly abide by them.
A, before the project starts, must deal with the project construction report and safety technical measures, with the consent of the production department, safety supervision department, center in charge of the leadership, the manager's approval to start.
Second, in the engineering construction, in strict accordance with the requirements of safety technical measures to do a good job in site safety. If the construction is not carried out according to these measures, the person in charge of the construction unit has the right to stop the construction immediately, make rectification within a time limit, and resume work only after the relevant personnel pass the on-site inspection.
Three, special type of work operators must hold valid certificates issued by the relevant units.
Four, into the pool, pump room and other five key parts, must hold a letter of introduction issued by the center. (The letter of introduction should indicate the reason for the competition, the name of the participants, the provincial certificate number, the name and contact information of the person in charge of the venue).
Five, there are waste materials recycling in the project construction, the construction unit is responsible for recycling, and all returned to the construction unit, the central material supply department is responsible for unified recycling. The construction unit shall not dispose of it at will.
Six, the construction site safety director has the responsibility to check the safety of the construction site, found hidden dangers immediately rectification.
Seven, team site representatives have the right to the safety and quality problems existing in the construction process, should promptly require the construction unit to rectify within a time limit, otherwise have the right to stop its construction. All consequences caused by the construction unit shall be borne by the construction unit itself.
Eight, the above matters are approved by both parties, signed and sealed.
Construction unit: Construction unit:
Person in charge of site construction: site representative:
Contact information Contact information:
Signing time: year month day
Project Quality Commitment Article 6 Project Name: XXXXXX Project
I promise that during the construction of this project, I will earnestly fulfill the following responsibilities, and undertake the corresponding lifelong quality responsibility during the architectural design and service life.
1, strictly abide by relevant laws, regulations and standards, and earnestly perform the responsibilities and obligations stipulated in the construction project contract.
2. The principle of first survey, then design and then construction shall be adhered to in the construction of this project. Provide true, accurate and complete original materials related to the construction project to the survey, design, construction, supervision, testing and construction drawing review units.
3. Contract the project to the construction, supervision, survey, design, testing and construction drawing review units with corresponding qualification grades, and the construction project shall not be dismembered. For the project that must be tendered, the tender shall be conducted in strict accordance with the law and regulations, and the team shall be selected on the basis of merit. The contractor shall not be forced to bid below the cost price, and the reasonable construction period shall not be arbitrarily reduced. Take overall responsibility for the quality of sub-projects contracted according to law but not managed by the general contractor. For projects that must be supervised according to regulations, supervision shall be entrusted according to law.
4. Timely handle the procedures of project construction drawing review and filing, quality and safety supervision, contract filing, safety production conditions review, etc., and start construction (including subcontracting projects according to law) only after obtaining the construction permit. Provide the construction drawings, design changes and other relevant design documents that have passed the examination by the construction drawing examination organization and are stamped with special seals.
Bidders of this greening maintenance project must agree to the following maintenance standards.
The following maintenance standards will be regarded as the maintenance commitment clauses made by the bidder.
The letter of commitment must be signed by the bidder and the bidder, and attached to the tender.
General terms and conditions:
1, the maintenance unit must dress in the construction process, and there must be eye-catching signs on the dress.
2. The maintenance unit must emphasize safety in production during maintenance and construction, and all maintenance workers of the construction unit must purchase relevant insurance. The construction unit shall be responsible for all safety accidents in maintenance and construction.
3. During the performance of the contract, the maintenance unit must actively respond to emergencies in the bidding.
In case of adverse consequences caused by improper handling of the above-mentioned events, Party A will investigate its corresponding responsibilities.
4. During the maintenance period, the maintenance unit must meet the requirements of Party A according to the standards. If the seedlings are lost or damaged due to improper management, all expenses shall be borne by the maintainer. If the consequences are serious, Party A will have the right to terminate the contract.
Commitment unit: (seal) Representative:
Date, month, 2000
8 Fuyang City, Anhui Province, civil air defense engineering quality supervision project quality commitment
declaration form
Fuyang Hefei Modern Industrial Park Fuhe Jiayuan East Zone Project Anhui Fuyang Hefei Modern Industrial Park Investment Co., Ltd. Fuyang Civil Defense Engineering Quality Supervision Station System
Project name:
Construction unit:
Date of declaration:
Civil air defense engineering quality supervision declaration data checklist (table 1.3)
Note: 1. This declaration form shall be truthfully filled in and bear corresponding legal responsibilities.
2. This declaration form is in quadruplicate, one for the quality supervision station and one for the construction, supervision and construction unit.
3. For the staffing situation of key positions of the construction project department and the project supervision institution, see the Staffing Standards for Key Positions of the Construction Project Department of Anhui Province and the Staffing Standards for Supervision Positions of the Site Supervision Institutions of Anhui Province.
Project quality commitment 9 1. Contract the project to the construction, supervision, survey, design, testing and construction drawing review units with corresponding qualification grades, and the construction project shall not be dismembered. Bidding for projects that must be tendered according to regulations shall be conducted in strict accordance with the law, and the team shall be selected on the basis of merit. The contractor shall not be forced to bid below the cost price, and the reasonable construction period shall not be arbitrarily reduced. Take overall responsibility for the quality of sub-projects contracted according to law but not managed by the general contractor. For projects that must be supervised according to regulations, supervision shall be entrusted according to law.
2. Timely handle the procedures of project construction drawing review and filing, quality and safety supervision, contract filing, safety production conditions review, etc., and start construction (including subcontracting projects according to law) only after obtaining the construction permit. Provide the construction drawings, design changes and other relevant design documents that have passed the examination by the construction drawing examination organization and are stamped with special seals.
3 shall not express or imply that the survey, design, construction, testing and other units violate the mandatory standards for engineering construction or use unqualified building materials, building components and equipment to reduce the quality of the project.
4, after the completion of the project, the organization survey, design, supervision, construction and other relevant units for acceptance, and accept the supervision of engineering quality supervision institutions. The project party that has passed the acceptance shall deliver it for use, and go through the completion acceptance filing formalities within 15 days after the project has passed the acceptance.
5. Organize the documents in time, establish and improve the project files, and hand over the construction project files to the urban construction archives management department within three months after filing.
6. Duties stipulated by other laws and regulations. This letter of commitment is made in triplicate, one of which shall be submitted to the competent department of housing and urban and rural construction when obtaining the construction permit for the construction project, one of which shall be submitted to the urban construction archives management department together with the archives for the record after the completion and acceptance of the construction project, and the other shall be kept by their respective responsible units for future reference.
Signature and seal of legal representative:
Xx year xx month xx day