Xiao Li's diary of water and electricity decoration shows his inner bitterness and boredom.

Xiao Li knows that hydropower transformation is a problem-prone part. Although he paid great attention, something went wrong. In the process of hydropower transformation, it is not only a lot of trouble, but also beyond the budget. Xiao Li joked that this is not to decorate himself, but to do good deeds and give money to others.

July 20 14 2 1

Today, the wall demolition master shoveled the previously painted wall by the way. Later, the master told me that it was exterior paint, who brushed it as soon as he got putty. Therefore, as long as the ceiling in the whole room is carved from the root, the original wall shovel and foundation treatment are 70 square meters, which is much less. Mark, we'll talk about it when the accounts come out.

Then the electrician will locate the water and electricity and finish the switch seat. Manager Tang told me that it was about 20,000.

Holy shit! Designer Wu Gong, didn't you say that my new house has basically changed its wiring, with no major changes? It's just 10000 hydropower. What a difference! See what happens when it's all finished in the end.

July 24, 1965 438+04

Tonight 10, although I worked continuously for two days and only slept for three hours, I still dragged my tired body to see the slotting progress. The feeling of slotting is almost the same, but the ground is still in a mess and the slag is not cleaned up. The contract says that the garbage will be cleaned up every day and transported to the garbage dump downstairs.

But this is understandable. Mark it for the time being Slot in the living room and the main bathroom. Is this an endless rhythm? Cement sand, water pipes and wires have entered the site. The living room is flooded with sediment, and the dining room is piped, but the window of the dining room is not closed. It rained at 9 o'clock tonight, and all the materials were wet. I closed the back window.

July 29, 1965 438+04

Workers have one or two places we don't ask for. The switch of the public toilet is required to be placed on one side of the public toilet, but it is placed opposite. Some routes can actually take shorter routes, but they are actually extended and then changed.

Therefore, hydropower is the biggest profit of the decoration company. Sir Li braved the cold to see the construction site, said some previously required hydropower grades and asked for changes. He responded that the current owner is easier to talk to.

July 29, 1965 438+04

I went to check the progress of water and electricity installation again today. Slower than expected, mainly because there are two walls to be demolished and electricity to go. If you don't tear it down and change it, the electricity won't work smoothly. Also, the project manager bought less water pipe fittings and had to replenish them.

I communicated with the hydropower master and reconfirmed some details of the hydropower level. Today, the master who installed water and electricity is not the master who came to measure the water level last time. He can still talk, but the water and electricity decoration is all traps.

July 29, 1965 438+04

Parents should pay attention to the traps, which are as follows:

1. One air conditioner and one cycle. Hello, boss. For the sake of "safety", it is best to have one air conditioner and one cycle in each room. I set up a loop directly between the study room and the air conditioner in the elderly room, and put an electrical switch in it. First of all, the power of 2.5 square conductor is about 3000 watts, and the maximum is 4400W W. The maximum current for long-term use is 16A. The cross-sectional flow of four square wires is 33A at 40 degrees, 42A at 25 degrees, and the power is about 8000w W ... The landlord can see the air conditioner on JD, and the cooling power of single cooling Haier air conditioner is 7 12w+. Gree 1.5 HP air conditioner refrigeration power 1050k, heating power 1500w. I'm going to install a small air conditioner in both rooms. There is no need to install a large air conditioner. This is a very simple calculation.

2. The electrical switch of the landlord was sent by the developer. The quality is definitely unreliable and the safety is not enough. The landlord chose Zheng Tai, who has a good reputation. Your sister, the developer is still very conscientious about this, and they are all equipped with Schneider's electrical switches. Schneider is more than twice as expensive as Zhengtai of the same specification. I'll tear it down and replace it. Just messing around. The electrical switch is 20A, which is more than enough with 2.5 square wires (theoretically, 2.5 square wires are equipped with 16A air switch, and 4 square wires are equipped with 20A switch). The purpose of further configuration in Korea is to burn electric meters. Why should I choose a 32A switch to make trouble for myself? If it is overloaded, it will not trip. What do you mean by slotting? It is obvious that there is a pipe in it, and the original pipe was opened. That slot is in the wrong direction. I have already communicated with the hydropower master.

August 3, 1965 438+04

The unpleasant thing still happened: after I measured the size at the scene, I told the project manager to give me a water and electricity map of the whole house, so that I could repair it if something went wrong. The project manager told me that he can't draw, and this kind of work is still reliable for designers. Let me find a designer, Pang Wu, to draw. Then I called the designer Wu Gong. His first sentence was: why pull water and electricity if you don't lay wooden floors? Do you need 600 sets of design drawings? I said, "I agreed to send it at that time. I said that I would be provided with drawings when the water and electricity were completed. How can I collect money? " Then he said to communicate with the project manager.

Later, Fat Wu called: "This is to arrange someone to come to the door for surveying and mapping. You want 600 yuan, but I can't give it to you. Please communicate with the project manager and ask the hydropower master to go out and see how much it costs. Don't look for me. " This attitude, gee, bow and scrape.

It turns out that the water and electricity diagram written in the contract was drawn by the designer and engraved by the company. I called Tang, the project manager, and he still asked me to find a designer. I told him bluntly, don't kick the ball with me, and told the project manager not to draw the hydropower map according to the terms of the contract. If he wants to save trouble, I'll cancel the contract directly. Finally, the project manager finally promised me to let the hydropower master draw a sketch and then give it to the designer to draw a computer diagram. Now I have verbally agreed to see if I can install the standard hydropower diagram.

August 3, 1965 438+04

Today, the water and electricity inspection, or decoration maintenance workers came. Call 1.0 before pressure test, and it is found that there is still depressurization. Later, the hydropower master said that the water pipe joint was not tightened and there was water leakage.

After the final acceptance, the main reason was that the secondary waterproof floor drain was blocked by the hydropower master, and the weak current tube was not wrapped with tin foil; The distance between high-pressure pipes is not enough. The water and electricity master said that these are minor problems that can be corrected in one morning. But the price is really expensive. After the final accounting of 2W 1, I estimate that mine is sky-high hydropower.

Because the whole house is wired+the basic circuit is rewired, and satellite tubes are used, I estimated in my mind that it is 1w5. After the completion of the accounting, the project manager Tang asked me to sign for confirmation. I'd better be cautious and sign for payment after the revision. Alas ~ I wish I could install water and electricity myself.