With the continuous progress of society, job responsibilities are indispensable on many occasions. Any job responsibility is a synthesis of responsibility, power and obligation. Use as much power as possible to undertake how many responsibilities, and use as much power and responsibility as possible to complete how many obligations. Any separation will cause problems. There are many points for attention in formulating job responsibilities. Are you sure you can write it? The following is the division of responsibilities of engineering personnel I have compiled (selected 16). Welcome to read, I hope you will like it.
Division of responsibilities of engineering personnel 1 1, responsible for the equipment, facilities, engineering organization and staffing under the leadership of the general manager;
2. Be responsible for equipment maintenance plan, engineering transformation plan, equipment procurement plan, spare parts procurement plan and equipment update plan;
3. Responsible for the operation, maintenance and asset management of all kinds of equipment in the building;
4, organize the formulation of job specifications and operating procedures;
5. Insist on daily on-site inspection and on-site guidance:
(1) Check the operation report, and if the difference is too large according to the energy consumption law, correct it in time;
(2) Review the operation monitoring data, and correct any deviation found in time;
(3) Check working conditions and labor discipline, and correct violations;
(4) Check the technical status of key equipment, analyze various hidden dangers and handle them in time;
(5) Review the maintenance work and check the quality and progress of the site;
(6) Patrol the equipment and facilities in the public * * * area, analyze the problems and organize efforts to solve them in time;
6, save human resources, reasonable arrangement of personnel, working hours, in order to improve work efficiency;
7. Do a good job in energy conservation and reduce energy consumption, material consumption and manpower consumption;
8. Be responsible for fire prevention, theft prevention and accident prevention within its scope;
9. Be responsible for organizing the training and assessment of managers, technicians and operators;
10, responsible for approving the work plans of subordinates and supervising the implementation of the work plans.
Division of responsibilities of engineering personnel. According to the company's overall strategy, organize the formulation of marketing strategy planning, and assist the general manager to establish a comprehensive sales strategy.
Second, plan the overall operation and business direction of the company's sales system, grasp the market dynamics, be familiar with the market situation, and have original opinions. Make and organize the implementation of a complete sales plan.
Third, according to the company's overall sales target, submit a sales plan to guide and control the direction and progress of marketing work. Supervise the whole sales process and complete the sales task.
Fourth, establish a good cooperative relationship with customers and the same industry;
Verb (abbreviation of verb) establishes and improves various rules and regulations, and promotes the standardization, scientificity and continuous progress of the company's sales system management.
Sixth, shape the corporate image.
Manage the sales staff and help to establish, supplement, develop and train the sales team. Establish and manage a high-quality marketing team and guide them to complete the company's planning and marketing tasks.
Eight, deal with other tasks assigned by the superior temporarily.
The division of responsibilities of engineering personnel is 3 1, which is responsible for the organization, guidance and management of hotel engineering maintenance business.
2, organize the implementation of equipment renovation project plan, major maintenance plan, spare parts procurement plan.
3. Responsible for all kinds of civil engineering construction planning of the hotel.
4. Control hotel energy, reduce energy consumption and improve economic benefits.
5. Responsible for dealing with the problems arising from the responsibilities of the engineering department and the complaints of the guests about the engineering maintenance work.
6, in-depth field, grasp the personnel and equipment status, insist on doing one or two inspections every day.
7. Coordinate with relevant departments on safety, fire protection, environmental protection and epidemic prevention, arrange employees reasonably, and be responsible for employees' business technical training and business assessment.
8, examination and approval of subordinate team work plan, overall arrangement of work, check the implementation.
9. Be responsible for preparing and submitting all relevant reports and statements to the hotel in time.
10, responsible for the performance appraisal of engineering personnel, and implement rewards and punishments according to the reward and punishment system.
1 1. Establish and improve the operation and operating procedures of engineering equipment, reasonably arrange the regular maintenance of each type of work, and ensure the normal operation of the whole working equipment.
12, continuous and effective communication with superior supervisors and departments to ensure timely and accurate information transmission.
13, report the engineering work to the general manager in time.
14. Attend hotel administration and other related meetings.
15. Regularly train subordinate employees in relevant knowledge.
16, complete other tasks assigned by superiors.
The division of responsibilities of engineering personnel is 4 1, which represents the company in engineering management of all construction projects of the company. Implement national laws, regulations, policies and mandatory standards, implement three management systems and other management systems, and safeguard the legitimate rights and interests of the company.
2. Prepare the project manager's responsibility for economic and technical objectives and assessment indicators of construction projects. Review the project management implementation plan, and establish the project safety and quality production responsibility system and safety and quality management system.
3. Safety and quality must be put on the important agenda, and a safety and quality work meeting should be held once a month to solve safety and quality problems in time.
4. The plan of safety, quality and technical measures must be arranged and issued together with the construction plan, and listed as the evaluation index of the completion of the construction plan to ensure the extraction and correct use of funds for safety, quality and technical measures.
5, seriously implement the safety, quality and economic management measures, so that rewards and punishments are clear.
6, organize regular safety and quality inspection, find and deal with emergencies, eliminate hidden dangers in time.
7. Participate in the investigation and analysis of major casualty accidents, major mechanical equipment accidents and major quality accidents. Organize the investigation and analysis of serious injury accidents and general quality accidents, and be responsible for putting forward handling opinions for those responsible for the accidents and implementing them.
8, review the project contract and outsourcing contract, according to the requirements of the project, review the construction organization design, project budget (pre) and construction plan node progress, timely grasp and control the construction progress, to ensure that the time limit for a project is completed on time. Master the management work in the early stage, peak period and closing stage of project construction, and supervise the project department to complete various economic and technical indicators on schedule.
9. Check and urge the Safety and Quality Department to seriously implement the safety and quality management system, strictly implement the construction specifications and technical measures, maintain the effective operation of the safety and quality system, and ensure the safety and quality of the project.
10, organize the budget contract and material design department to formulate the economic responsibility system for project contracting and the responsibility system for financial control, property management and logistics support; Do a good job in the budget and settlement of the project, implement reasonable labor and material quotas, and urge the company to increase production and save money, increase income and reduce expenditure, and improve economic benefits. Summarize the actual labor and material costs of each project every month and submit them to the budget contract department and the general manager's office of the company.
1 1. Organize materials and administrative departments to open up material channels and life service categories, ensure supply, facilitate operation and service production, and serve employees.
12, pay attention to talent exploration and training, train qualified talents with relevant departments, fully mobilize positive factors, and strive to achieve the goal.
13, organize the company's administrative department to implement the company's employee assessment, post deployment, promotion, salary adjustment, rewards and punishments and other relevant regulations.
14, do a good job in the qualification audit of outsourcing teams, ensure that the project is outsourced to outsourcing teams with various qualifications, confirm the partial project cost and contract price of outsourcing projects provided by the budget contract department, and cooperate with the project department to sign the responsibility letter with qualified subcontractors.
15, do a good job of internal and external coordination, coordinate the working relationship between the branch and the management department, adhere to the principle of democratic centralism, and mobilize the enthusiasm of leadership, management and operation.
16, organize relevant administrative departments, pay special attention to the organizational construction, ideological construction and business training of the team, and implement modern management.
17. Assist the company in project inspection, evaluation and award declaration.
The division of responsibilities of engineering personnel is 5 1, assisting the engineering manager to do a good job in the preliminary operation and preparation for the commencement of the project.
2. Participate in civil engineering bidding and cooperate with the cost department to prepare bidding documents; Participate in the review and evaluation of bidding materials and documents of civil engineering, and put forward reasonable suggestions; Be responsible for answering questions on the site of civil engineering for the tendering units.
3. Be responsible for the time limit control, quality management and safety and civilized construction supervision of the general contractor during the project construction, be familiar with the technical specifications and contract requirements before the project implementation, and review the construction drawings.
4. Participate in the blue prints.the design and design disclosure, and be responsible for sorting out and issuing civil disclosure records; Follow up and deal with the problems raised in the blue prints.the design.
5. Supervise the general and sub-contractors to submit weekly and monthly construction plans on time, submit construction plans before the implementation of each working procedure, and review and put forward professional opinions.
6, check whether the total, subcontractors' resource input meets the requirements of the time limit for a project, to ensure that the overall goal of time limit for a project and quality can be achieved.
7, coordinate the construction and supervision, strictly control each working procedure, process control, to ensure the engineering quality requirements.
8. Record the construction log accurately and completely, and strictly review and sign the construction and design changes to ensure the controllability of the construction process.
9. The supervisor completes the monthly supervision report on time.
10, complete other work assigned by the leaders.
Division of responsibilities of engineering personnel. Formulate the organizational structure and management operation mode of this department to make it operate quickly and reasonably, and effectively ensure the safe and economic operation of hotel equipment and facilities and the integrity of building decoration.
2. Summarize and summarize the operation and maintenance practices, formulate and review preventive maintenance plans and renovation plans, and supervise the implementation of equipment, facilities and building decoration, so as to ensure that the hotel facilities are constantly improved and always in a normal and intact state.
Third, formulate and assess employee training plans, and regularly cultivate employees' business skills, service awareness and basic quality.
Four, fully responsible for all water, electricity and other cost-saving operation, tracking control. Strictly control the maintenance cost to ensure the maximum energy saving and consumption reduction of the hotel.
Five, according to the business situation and climate and market energy prices, put forward energy-saving operation plan and operation and maintenance cost budget.
Responsible for coordinating the relationship with the business departments such as municipal engineering related to the hotel, so as to obtain a good external environment.
Seven, presided over the department work meeting, coordinate team work.
Eight, analysis of engineering project quotation, major projects should organize personnel to discuss and on-site inspection of construction quality and progress, to evaluate and accept the completed project organization personnel.
Nine, cooperate with Ann department to do a good job in fire control and safety.
Ten, the establishment of complete equipment and facilities technical files and maintenance files.
Eleven, at any time to accept and organize other work assigned by the superior.
Division of responsibilities of engineering personnel. Responsible for the office management of the engineering department.
1, under the guidance of the engineering manager, responsible for the related routine work of the engineering office and receiving visitors. Assist the engineering manager to print various documents.
2, assist the project manager to manage all kinds of engineering drawings and information.
3. Remind the project manager to attend the planned meeting on time.
4. Fill in relevant statements and report to the general manager's office after being signed by the engineering manager.
5. Be responsible for the circulation and recycling of documents, materials and notices within the project.
6. Responsible for the declaration, collection and distribution of attendance (attendance, annual leave, overtime, etc.). ), welfare (salary, bonus, overtime, etc. ) and labor insurance supplies for engineers.
7. Responsible for cash reimbursement and check processing.
8. Be responsible for maintenance order statistics and material consumption statistics of the engineering department.
9. Be responsible for telephone registration of engineering complaints.
10, tools kept by employees of the engineering department shall be registered by the engineering department and individuals respectively.
1 1, responsible for the management of large tools in the engineering department, establishing accounts and establishing borrowing procedures.
Second, responsible for the warehousing and procurement of the warehouse of the engineering department.
1, responsible for the storage of materials in the warehouse of the engineering department. All kinds of materials should be kept in account, and the receipt should be explained.
2. The materials consumed by the registered work order should be consistent with the materials actually collected.
3. Responsible for the procurement of tools and materials in the engineering department, and go through the procurement procedures according to the procurement plans submitted by various disciplines. After being reviewed by the engineering manager and reported to the general manager for approval, the general manager will contact the procurement under the guidance of the engineering manager.
4. The purchased tools or materials shall go through the acceptance formalities, and can be put into storage only after passing the acceptance.
5. The warehouse of the engineering department shall make an inventory once a month, and the inventory of the inventory shall be equal to the expenditure of recipients.
6. Control the purchasing quality, shop around, and the price should be fair and reasonable.
The division of responsibilities of engineering personnel is 8 1, and the overall management of the engineering department is presided over.
2, seriously implement the relevant national laws, regulations and systems of engineering construction, in strict accordance with the construction procedures.
3. Be responsible for the overall comprehensive coordination and management of government investment projects and company real estate development projects.
4. Be responsible for the division of responsibilities and performance appraisal of managers in this department, and make suggestions on the promotion, rewards and punishments of employees in this department.
5. Strengthen the political and professional study of the management personnel in this department, constantly improve the ideological and theoretical level, management ability and professional knowledge level of the management personnel, and complete all the work dutifully.
6. Be responsible for the overall progress, quality, cost control, comprehensive management and coordination of the project, and do a good job of communication and coordination with all departments of the company.
7. Assist the Chief Engineer's Office to carry out the blue prints.the design and design disclosure before each project starts.
8. Be responsible for the final decision management, quality management, safe and civilized construction management and supervision and management of technical data of various technical schemes of the project, and be responsible for the review, confirmation and issuance of important economic and technical documents.
9. Comprehensively coordinate the cooperative relationship of all contractors to ensure the normal development of engineering construction.
10, often go deep into the construction site and report the construction situation and existing problems to the competent leader on a regular basis.
1 1. Participate in regular supervision meetings, organize special meetings and special inspections regularly or irregularly, and evaluate and rectify the engineering construction and supervision work.
12, organize the commencement ceremony and completion acceptance of the construction project.
13. Complete other tasks assigned by company leaders.
Division of responsibilities of engineering personnel 9 1. Be familiar with the project planning, various housing structures, types and distribution of public facilities and equipment, master the distribution, trend, location and use of underground pipelines, and conduct regular inspections to ensure that public facilities are in good condition.
Responsible for reviewing the application for residential decoration. Handle the owner's house inspection and vacancy inspection. Patrol and inspect the secondary decoration construction. Violation of relevant construction regulations shall be corrected in time and recorded for subsequent treatment;
2. Responsible for the planning, organization, inspection and improvement of public facilities, equipment maintenance and indoor maintenance in the management office;
3. Responsible for the acceptance and handover of residential property and the handover of all engineering data;
4. Responsible for the determination of engineering maintenance personnel positions and the improvement of job responsibilities.
5. Be responsible for formulating the annual maintenance plan and internal maintenance management of residential houses and public facilities;
6. Organize the preparation of various rules, regulations and technical standards for equipment management, operation and maintenance, and supervise their implementation;
7. Responsible for handling all kinds of engineering maintenance information in time, taking various measures to improve, and reporting to the manager in time;
8. Responsible for the project construction organization and on-site supervision and management of residential reconstruction and expansion project, and handle the project completion acceptance formalities in time;
9. Responsible for supervising the daily inspection and important maintenance of various facilities and equipment within the jurisdiction, participating in the maintenance and construction of major projects, ensuring the maintenance quality and ensuring that all kinds of facilities and equipment in the community are in good working condition;
10. Responsible for reviewing the items and standards of household maintenance expenses, handling the owner's maintenance application, cooperating with the customer service center, arranging maintenance personnel to provide services for the owner in time, and reporting to the management center for sorting, statistics and archiving according to the maintenance return visit records.
Division of responsibilities of engineering personnel 10 1. Under the guidance of the leaders of the project department, seriously implement the national guidelines and policies on engineering construction and the technical standards, norms, procedures and construction technology management system issued by superiors. Be fully responsible for all the work of the engineering department.
2. Be familiar with the bidding documents and design drawings, participate in on-site investigation and inspection, put forward suggestions for improving the design, draw detailed drawings and auxiliary drawings required for the construction, and make detailed arrangements for the construction project, including necessary supporting plans for manpower, materials and mechanical equipment, original construction records and engineering inspection certificates prepared by various technologies.
3. According to the tasks assigned by the superior and the construction organization design, according to the actual situation, formulate the specific construction methods and construction organization measures of this project, and supplement the necessary construction procedures and operation procedures.
4. Lead the survey team to carry out the survey in strict accordance with the construction technical specifications, test procedures, survey procedures and design drawings, carefully and correctly do a good job in surveying and measuring the occupied and leased land, and mark its scope of application on the ground. The engineering minister personally controls the axis and submits it to the chief engineer of the project for review before the construction can be carried out.
5. Technical disclosure system Before the formal construction of the project, an engineering coordination meeting will be held. Through technical disclosure, the technical personnel involved in the construction will be familiar with and understand the characteristics, technical requirements, engineering difficulties and engineering quality standards of the engineering tasks undertaken by the construction unit, so as to eliminate major quality hidden dangers in advance. Record the technical disclosure of the project, and urge the ZuoYeDui to implement it.
Technical disclosure requirements
1 In addition to understanding the design intent, we must also meet the requirements of design drawings and changes, and implement and meet the construction specifications, procedures, process standards, quality evaluation standards and the reasonable requirements of the construction unit.
2 The whole process of construction, including the construction of each division and subdivisional work, must be technically disclosed, especially for some special key parts and technically difficult concealed works.
3 For the types of work and engineering parts prone to quality accidents and industrial accidents, preventive measures for various accidents should be emphasized in the technical disclosure.
4 Technical disclosure must be in written form, and the handwriting of the disclosure content should be clear and complete, with the signatures of the disclosure person and the recipient.
5. Technical disclosure must be carried out before the construction of the project, as part of the preparatory work before the construction of the whole project and partial projects.
6. Often go deep into the construction site, adhere to the technical work of the whole construction process, check the engineering quality and technical safety measures, check the drawings, verify the quantities, grasp the progress of the project, collect data, keep a diary of the construction, fill in the original records of the construction in time, and ensure that all the information on the project completion is complete and the visa is perfect.
7. According to the principle of changing the design and the examination and approval authority, all the projects within the construction scope are carefully investigated and studied, and after many comparisons, opinions on the need to modify the design are put forward.
According to the construction master plan, prepare the operation plan of each project, arrange the construction tasks of each ZuoYeDui, and issue the audit settlement task list and quota requisition list.
8. Actively participate in technological innovation and correctly adopt new technologies, new materials and new processes at home and abroad.
9. Be responsible for providing the monthly and annual reports of completed quantities for supervision and construction unit visas to the financial department on a regular and timely basis, and providing the budget cost analysis table of completed projects and relevant statistical data.
10. Responsible for the completion survey, fill in the project quality inspection and evaluation form according to the measured and completed original records, draw the completion drawing, and participate in the construction technology summary.
1 1. The proper use and storage of surveying and mapping instruments and office equipment need special personnel to ensure normal use. After use, it should be checked and kept by a special person. Carefully keep the construction charts and all kinds of technical data.
12. Complete other tasks assigned by the leaders of the project department.
Division of responsibilities of engineers 1 1 1. In the absence of the project manager, perform all the duties of the department manager and be the assistant of the department manager.
2. Make the shift plan of the foreman in charge and subordinate, and make the work plan and work schedule.
3. Responsible for making daily tasks and assigning project lists, and urging employees to complete all the work of the day.
4. Patrol and check the work done by subordinates during the day, including the workload and its quota.
5. Ensure that every piece of facilities and equipment can operate normally, and make the equipment reach the specified standards after maintenance.
6. Assist in supervising the project progress of external personnel and the work quality standards that should be achieved.
7. Ensure that all kinds of filter screens of hotel engineering pipelines can be replaced on time.
8. Examine and approve the standard specifications of raw materials required for each component to ensure that all projects are completed on time.
9. Check and suggest the maintenance and replacement of equipment in the project site or guest room.
10. Complete other tasks assigned by the chief engineer and engineering manager on time.
Division of responsibilities of engineers 12 1. Assist the minister to complete the management work and technical guidance of project preparation.
Second, review and finalize the technical agreement of the responsible electromechanical equipment orders, grasp the manufacturing and processing progress of the ordered equipment, organize the technical acceptance of the arrived equipment, and file and record the technical data of the equipment.
3. Be responsible for the declaration, review and quality and quantity control of spare parts of production line equipment before production.
Four, lead and organize the mechanical and electrical equipment maintenance area to complete the equipment installation and coordinate the construction unit to control the project quality, and be fully responsible for the equipment installation progress, single machine commissioning, linkage commissioning and final acceptance. Responsible for making emergency plans for safety precautions during the operation of the main equipment of the production line.
Five, formulate production line debugging procedures, equipment maintenance safety technical operation procedures and various equipment management rules and regulations, establish equipment files, and establish the organizational structure and operation mode of equipment management in the whole plant.
6. Be responsible for the job skills training and safety production training of equipment maintenance personnel, and cooperate with all departments of the company to do a good job in the management of employees in this department.
Seven, the factory equipment safety, site safety in the process of employees' work is responsible for leadership and management.
Eight, responsible for the safe use of factories, pipe networks, energy media and other buildings.
Nine, complete other tasks assigned by the company leaders.
Division of responsibilities of engineering personnel 13 1, responsible for team building and skill upgrading of engineering departments.
2, responsible for engineering technology, quality management, participate in the preparation of project quality schedule and specific implementation arrangements.
3. Be responsible for organizing the company's engineering construction management and controlling the project progress, quality, cost and safety.
4. Implement the post responsibility system and work standards of the department, and strengthen cooperation with relevant departments such as R&D, sales, operation and maintenance.
Division of responsibilities of engineering personnel 14 1. Participate in the overall design and construction scheme of the project construction organization, and prepare special safety technical disclosure.
2. Be responsible for providing technical support (on-site investigation, technical scheme, technology transfer and bidding) with sales staff.
3. On-site management and coordination of project start-up, process implementation, completion commissioning and acceptance. , control project risks, coordinate and solve difficulties in project implementation in time;
4. Understand and track the technical trends of the data center in time, compare and be familiar with the products of various manufacturers at present, and seek solutions.
Division of responsibilities of engineering personnel 15 1. Implement the contract for importing equipment of the enterprise.
2. Coordinate and complete the training of imported equipment installation and commissioning personnel, and deal with difficult problems in the process of installation and commissioning.
3. Participate in the contract negotiation of electrical engineering and implement it in the construction.
4. Make the electrical engineering construction plan, organize and coordinate the electrical engineering construction work.
5. Review the construction drawings of electrical engineering and modify unreasonable parts, undertake the drawing design of some electrical engineering and deal with difficult problems in construction.
6. Monitor the material quality and construction quality of electrical engineering construction to ensure the construction quality.
7. Be responsible for inquiring relevant information according to the contract, accepting the completed quantities, and handling the payment application procedures.
8. Complete other tasks assigned by the leaders.
Division of responsibilities of engineering personnel 16 1. Responsible for answering the telephone and related daily work of the engineering office, and receiving and arranging visitors for the manager.
2. Responsible for the circulation, recycling and preservation of internal documents, notices and materials of the Engineering Department.
3. Assist the project manager to do a good job of scheduling equipment operation.
4. Assist the project manager to sort out and print various reports and documents.
;