I must know how I want to decorate and what style I like. I must first determine the renovation plan, that is, I must know what my home will look like after the renovation, the window of the world-curtain accessories, furniture selection and so on. Only when the plan is clear can I proceed to the next step.
2. The demolition and reconstruction of the main body ash wool has entered the construction stage, and the demolition and reconstruction of the main body is the first project, mainly including wall demolition, wall building, wall skin, heating, plastic steel windows and so on.
To put it bluntly, the main body demolition is to put up the framework of the construction site first.
3, hydropower transformation The layout of hydropower transformation should be scientific, and the selection of materials is also very important. At present, the material management in the building materials market is not standardized. When purchasing electric wires, switches, lamps, water supply pipes and other hydropower materials. , not cheap, but the products of regular manufacturers. At the same time, it is necessary to carefully check whether the production license, business license, test report, 3C certification and other materials of the products are complete and formal.
4. Wood-tile-oil "three brothers" Woodworking, bricklayer and oiler are the "three brothers" in the construction process, and the basic order of appearance is: wood-tile-oil.
The basic entry principle is-whoever is dirty goes first.
"Who gets dirty first" is also one of the basic principles to determine the order of home improvement. I will introduce this main link in detail in the future.
5. As the installation link, the kitchen and bathroom ceiling and the cabinet ceiling are still continuing the "packaging" of the home.
At the same time as the ceiling of the kitchen and bathroom, the moisture-proof ceiling lamp and exhaust fan (Yuba) of the kitchen and bathroom should have been bought.
It is best for students to install ceiling lamps and exhaust fans (Yuba) in the kitchen and bathroom at the same time, otherwise thread ends and holes will be left.
7, wooden door installation wooden door installation can be arranged on the second day of cabinet installation, as early as more than a month ago, after the wooden door measurement is completed, it can be installed now.
If it goes well, it will be a day. At the same time, hinges, door locks and floor drains should be installed.
Students should prepare related hardware in advance.
8. Floor installation The floor can be installed the next day after the wooden door is installed. If it goes well, it will be a day.