Annual work summary of supervision

Summary is a written material that analyzes and studies the relevant situation at a certain stage and makes guiding conclusions. It plays a connecting role in our study and work. Let's sum it up. So do you really know how to write a summary? The following are four summary articles of supervision work for you, hoping to help you.

Annual work summary 1, supervisor, adhering to Party B's cultural purpose, bearing the dream of building a 100 billion-level enterprise. All the colleagues in Qinzhou Project Department actively practice the core values of the enterprise, promote the formation of cognitive cultural patterns, understand cultural connotations, guide cultural actions and enhance cultural values, enhance cohesion and centripetal force, and lay a solid foundation for the supervision cause to stand and take root in Qinzhou!

Looking back on 20xx, Qinzhou Project Department had a difficult year. The expansion from two people to six people now, from a small area of Qinzhou Port to the suburbs of Qinnan and Qinbei now, records the hardships and efforts of every employee of Qinzhou Project Department.

The year of 20xx is a year of great opportunities and unprecedented challenges. The key lies in our supervisors' solid and profound theoretical knowledge and down-to-earth work style.

In 20xx, we ushered in the "year of engineering inspection", which is a "grand parade" of engineering quality and a "great country inspection" of spreading knowledge and supervision knowledge. In line with the service tenet of corporate culture, we have successfully accepted this "review" and passed it under the continuous communication, exchange and cooperation with all parties!

20xx is also a more challenging year for me. With the continuous evolution of roles, more pressure comes with it. How to manage a team well, how to accomplish work goals efficiently, how to better handle the relationship between all parties, etc. all need this role to solve. Below/below/below

In response to these problems, I have summarized the following points:

I. Infiltration of tasks and objectives

Clear mission objectives, and thoroughly penetrate into every supervisor, so that everyone has a certain overall situation. Notify the completion of the target every quarter, always encourage the supervisor to collect information from all parties, improve internal effective communication, and sprint the task target in unity and mutual assistance!

Second, internal management.

The internal management mentioned can be subdivided into the following small parts:

1, creating an atmosphere of effective communication. Effective communication must be carried out at weekly meetings or at ordinary times. The convening of regular meetings can't just stop at simple work reports and copying large-scale documents. What is more needed is to communicate with each other on the problems encountered every week, so that everyone can learn from each other's good experiences, abandon bad habits and encourage each other;

2. Cultivate the strict work style of supervisors. Work must be serious, personal feelings and habits in life can not be brought to work, and every supervisor needs to understand that work is work;

3. The person in charge of the project department should clearly realize the importance of humanized management. For each supervisor's talent, we should divide the work reasonably and do our best. At the same time, the person in charge of the project department must learn to empathize, accept differences, be broad-minded, dare to accept suggestions and different voices, coordinate the work emotions among colleagues, give full play to personal ability and charm, cultivate and strengthen teamwork spirit, and strive to create a warm atmosphere so that every supervisor can feel the warmth of the whole team as a big family!

Third, the handling and coordination of the relations between all parties.

1, actively participate in the coordination work in the project construction, and reduce the workload of the project owner. Coordinate the relationship between the constructor and the constructor, strictly demand the construction team on the project quality and cooperate at the same time. In project management, our role is to represent the management of Party A, and we also need the cooperation of the construction party to better complete the work. Secondly, we need to be able to handle the relationship with the project manager of the project owner. They are both the entrusting party and the managing party. While doing their work well, we need to try our best to share the workload for them and let the service tenet of "kindness and gentleness" penetrate deeper!

The above are some key issues that I summed up in this year. Some problems can't be solved without the careful guidance and help of Tang Gong and the strong support of the company leaders! Also actively practice in practical work, always encourage yourself to keep improving!

20xx will face greater challenges. All colleagues in Qinzhou Project Department will closely unite, work hard to develop, seize the opportunity, meet the challenge, take advantage of the situation, speed up the supervision work of serving Party B, speed up the construction of Qinzhou, take root in Qinzhou, promote the regional expansion of Qinzhou Project Department with a fuller mental state, and strive to create a new situation in supervision work!

Summary of supervision's annual work With the joint efforts of all participating units, the project of Building 9, the third phase of low-rent housing in two counties was successfully completed. Here, on behalf of xx Low-rent Housing Project Department of xx Construction Supervision Consulting Co., Ltd., I summarize the supervision work of this project as follows:

I. Overview of the Project:

The third phase of the county low-rent housing project was contracted by xx Construction Engineering Company. The project is located in xx village, xx county, and it is a brick-concrete structure, in which: the first floor is 2.4m for sundry rooms, the second to seventh floors are 3m for residential buildings, and the roof is cement tile roof, with a construction area of 29 18m2 and a cost of 2.5 million yuan.

Second, the supervision organization:

According to the supervision contract and supervision outline, combined with the specific conditions of this project, our company established a project supervision institution composed of chief supervision engineer xxx, professional construction supervision engineer xxx and supervision xxx, and entered the site on xx, xx, xx to supervise this project. The project supervision team strictly implements the supervision procedures, adheres to the purpose of "honesty, law-abiding, fairness and science", and implements supervision with the work style of "earnest, rigorous and meticulous" to complete the supervision task.

Third, the supervision work:

1, pay special attention to prior control and strictly control the construction.

In the whole supervision process, we should adhere to pre-control and active control, formulate supervision plans according to contracts and design documents, formulate specific supervision work procedures, and clarify work contents, actors, acceptance criteria and work requirements.

Before the commencement of this project, according to the requirements of supervision specifications, we have reviewed the qualifications of the construction unit, the institutions, personnel and systems of on-site quality management and technical management, and the qualifications and employment certificates of operators of special types of work. According to the application form of construction organization design scheme submitted by the contractor, the construction organization design is reviewed, and the supervision scheme is compiled accordingly, and the measurement, positioning and setting-out of the project, including axis size and horizontal elevation, are reviewed on the spot, which further clarifies the supervision objectives and requirements and creates conditions for the smooth development of supervision work.

2, strictly control the raw materials and semi-finished products come into play.

All raw materials and semi-finished products entering the site must be inspected in writing, that is, certificate of conformity, use certificate, quality certificate, etc. , meet the requirements for appearance inspection. After there is no abnormality, the samples witnessed by the supervisor will be sent to the municipal testing center for re-inspection, and the re-examined materials can be used in the site. Unqualified materials will be rejected for use in the project. The certificate and quality guarantee of building materials in this project are complete, and the main building structural materials such as steel, cement, gravel and yellow sand have been sampled and rechecked after entering the site, all of which meet the qualified requirements.

3, strict process inspection, strengthen process control.

In the process of construction supervision, strengthen the inspection means of construction procedures, and carry out construction only after passing the inspection. Without the acceptance of the previous procedure, the construction of the next procedure shall not be carried out. Our project supervision department pays special attention to the acceptance of concealed works, and on-site supervisors supervise key and key parts, such as cast-in-place reinforced concrete, beams, slabs, ladders and roofs.

In the process of construction, we attach great importance to and strictly control the construction quality of reinforced concrete projects, especially floor projects. In the whole construction process, we focus on controlling the quality of steel bar binding, the pouring thickness of bottom plate, the concrete mixture ratio, slump and maintenance to ensure the construction quality of concrete. In the wall construction, we have grasped the following key points:

One is the wet water of bricks;

The second is the correct mixing of mortar;

The third is the quality of masonry, in which the fullness, cohesion, vertical flatness and setting of Rachel bars of mortar are the key points of supervision.

In the process of supervision work, * * * issued two supervision work contact sheets, 10 supervision engineer's notice and three safety hazard rectification notices. During the implementation of the project, weekly site meetings will be held on matters such as project quality, cost, progress, safety and contract management, and six special site meetings will be held according to the actual situation of the project.

4. Strengthen post-event control to ensure the construction quality meets the contract requirements.

(1) No quality accident occurred in the whole construction process of this project. As a general quality problem, the construction unit carried out internal rectification after self-inspection; On the other hand, after the supervision and inspection, the construction unit will be notified for rectification.

(2) Promptly urge the construction unit to collect and sort out all kinds of engineering data, and earnestly do their own supervision data.

(3) Require the construction unit to protect the finished products of the completed project.

5, the project schedule control:

The progress of the project is directly related to whether the construction project can be completed and put into use on schedule. My supervision team first reviews the overall progress plan of the construction unit, and after reporting it to the owner for approval, urges the construction unit to construct in strict accordance with the overall progress plan. And according to the total schedule, prepare the monthly schedule. Once any deviation is found, the construction unit is required to make appropriate adjustments to labor, materials, equipment and funds in time to ensure that the project is completed as planned.

6. Investment control:

The project supervision department shall control the payment of the supervision project according to the construction contract, actual construction progress and project quality.

7, safe production and civilized construction:

"Safety first, prevention first", in the process of supervision, the project supervision team always takes safety supervision as the focus of work, which runs through the whole process of supervision work. Combined with the actual situation of the project, urge the construction unit to establish the responsibility system for safety in production, do a good job in the education of safety in production and civilized construction, organize the construction unit to carry out safety inspection on a regular basis, and timely issue a document asking the construction unit to make rectification within a time limit for the existing safety hazards. No safety accidents occurred during the construction of this project.

Through the joint efforts of the construction unit, design unit, contractor and supervision unit, under the guidance and supervision of relevant government departments, the project has been basically completed according to the contract. Engineering technical data have been sorted out as required, and the engineering quality meets the requirements of design, specification and use function. I wish the project a smooth acceptance.

In a blink of an eye, 20 years have come to an end like a blink of an eye. Looking back on my work and life this year, I feel a lot. I have been in the company for more than a year and a half. Over the past year or so, through the care and guidance of leaders and colleagues, not only the supervision business ability has developed by leaps and bounds, but also the overall quality of individuals has been greatly improved imperceptibly. Under the guidance of the company's core values of "building a career and respecting customers", we have successfully completed all the tasks delivered by the company. After one year's supervision work, we have a deeper understanding of the meaning of the company's service concept of "expert service, reliable partner": to provide customers with professional solutions and expert guidance. From trust to trust, this is not only a commitment to customers, but also a higher service standard for yourself.

In the 20 years of supervision work: I have earnestly implemented the requirements of the company and the leaders of the project department for my work, participated in various initiatives and activities issued by the company, and also experienced many trainings and studies organized by the project department. Strengthen daily work management, strictly implement various rules and regulations and attendance system, implement on-site supervision and inspection system, and fill in supervision log. At the same time, he is also the wireless professional information interface person of Zhengzhou Mobile. Always keep in touch and communicate with the construction party, solicit opinions, cooperate closely and serve the mobile. According to the specific implementation documents entrusted by the construction project supervision and the specific requirements of Party A, and according to the supervision specifications, technical acceptance standards and design documents, the supervision work of wireless professional engineering information management for 20 years has been completed.

I. Overview of the Project in 20___:

The main construction projects of Zhengzhou mobile radio specialty in the next 20 years are the second phase of TD Phase VI and the first phase of LTE. Including * * _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ With the joint efforts of all staff, we actively cooperated with Party A's construction requirements, formulated a scientific and reasonable construction process, completed the construction task of TD Phase VI Phase II at the end of August, and basically completed the acceptance work. LTE construction began in September. Facing Zhengzhou Mobile's 4G network construction project, the leaders of the project department attached great importance to it and responded positively. They arranged a group of experienced executives to work in the joint office established by Zhengzhou Mobile, and I was fortunate to be one of them. With everyone's joint efforts, the construction and opening of _ _ _ _ _ sites have been completed so far. According to the overall project progress, the first phase of 4G construction can be basically completed by the end of the year.

Second, strictly abide by the duties of the supervisor in the work:

1, serious and responsible, rigorous and progressive

In 20___ years' work, I was mainly responsible for information management and supervision of wireless construction projects this year. The most important thing is to inform and publish engineering information every day. As an information interface, I am responsible for the information summary of Zhengzhou Mobile's urban and suburban projects, which is continuous every day. Although sometimes I feel bored, I deeply understand the importance of information management in supervision work. Whenever I feel slack, I will make a phased summary, sort out my recent problems and solutions, communicate with the leaders of the project department in time, eliminate my negative emotions, and continue to devote myself to my daily work and study with a serious and rigorous attitude.

2, strengthen the supervision business ability, improve the overall quality of individuals.

My daily work experience has also greatly improved my supervision ability, and I can actively control and coordinate the progress of key points of the project. This year's project * * * has experienced two stages of climax. The first time was at the end of July, and the second phase of TD Phase VI entered the sprint stage. According to the requirements of the provincial company, this stage of work was completed on August 5, and Zhengzhou Mobile took the lead in supervising the work. I am responsible for daily project control and information summary and notification. The second stage is the first stage of the current 4G network construction. Since the National Day, according to the requirements of Zhengzhou Mobile, the builder, he sacrificed his rest time, took charge of the overall command and dispatch, presided over the regular meeting of project construction, reported the progress of the project, coordinated the communication between all links, assisted Zhengzhou Mobile in formulating the flow chart of LTE construction links, and arranged the daily work plan and overall progress report.

To tell the truth, this project was a little uncomfortable at first, and the work intensity and pressure greatly exceeded the previous project construction. However, under the guidance of the leaders of the project department and the understanding and instructions of my family, I quickly put aside all other thoughts and devoted myself to my work. Although I stay up late every day, the rest time is greatly shortened, but I am full of pride for witnessing the emergence of more than 4G networks in Zhengzhou 1000, the continuous coverage of important roads in the urban area and the comprehensive roll-out of the main urban area. Through these two stages of work, my personal project supervision ideas and project management experience have been significantly developed and improved. I would like to thank the company leaders and the project department for training me and giving me so many opportunities to participate in large-scale engineering construction.

Third, some other personal feelings and shortcomings.

First of all, I want to thank my family for their support in my work. It can be said that I have little time to spend with my family this year. In the face of more and more parents with gray temples, I sometimes feel deep remorse, but they always give me positive encouragement and make me feel at ease about my work. Secondly, I would like to thank the leaders of the company and the project department for guiding me in time when I was confused and slack, and let me return to the normal mode. Thank you. After a year, I also found many shortcomings: my writing ability needs to be improved. Because I often help the owner to do engineering data analysis, I have written a lot of information, but the final draft is always determined after several revisions. The problem is often not the accuracy of core data, but the organization of writing language; The accuracy of language expression, due to hosting engineering meetings and making related overall scheduling reports every day, sometimes there will be deviations in language expression, which will undoubtedly affect related work; Lack of on-site supervision ability, because the interface people have worked together in the mobile office environment for nearly a year, there are relatively few opportunities to go to the site. These shortcomings are all places that I need to pay attention to and strengthen in the later period. Please supervise and correct.

20___ years supervision work objectives and plans:

1. Strengthen communication with customers: keep abreast of customers' work needs in all aspects, actively cooperate with customers to handle various projects, and propose improvement measures and innovative management ideas to customers to ensure the steady and efficient progress of projects.

2. Strengthen internal management and personnel training, strengthen teamwork and implement relevant plans.

3. Strengthen on-site quality and safety management and improve safety awareness: quality is the best embodiment of our service ability, which ensures the quality of the project, enables us to take the initiative in our work and have a decisive voice in the project construction. Safety is no small matter, whether it is engineering construction or safety in our daily life, we need to pay attention to prevent safety accidents.

4. Strengthen learning: the development of communication industry is changing with each passing day. The TD at the beginning of the year to the current 4G is a good witness. As a supervisor, you should supplement your business knowledge in time and improve your business ability. As myself, I decided to try my best to supplement my communication expertise in the new year and try my best to pass the title of English and Information System Supervisor.

Supervision annual work summary 4 leaders:

Hello!

Time flies, 20xx years have passed quickly. At the end of this year, looking back on the supervision work and life in the past year, it was bitter and tiring. ...

In the past year, under the guidance and leadership of the leaders of the branch and the project department, I earnestly adhered to the correct working guiding ideology, established the service tenet of "satisfying the owners" and worked hard to complete the work.

From 20xx 1 month to the end of August, under the leadership of General Manager Wang of Lianyungang Project Department, we provided excellent services to the owners of Lianyungang Donghai Telecom. In the supervision work, we should be strict with ourselves, establish a strong sense of professional responsibility, be careless with our work and not be lazy, do our best to do a good job in supervision, consult the experienced predecessors of the company in time when encountering things that are unknown or uncertain, and handle everything correctly in time.

1 1 year1from October to May, the project of Lianyungang Donghai Telecom Branch was mainly FTTH. In order to cooperate with the owner to participate in the "Optical Network Jiangsu" competition plan and better serve the owner, the FTTH project license was successfully obtained under the arrangement of the company leaders. In FTTH's engineering construction project, the quality is strictly controlled, the renovated community is inspected quantitatively on a regular basis, and the problems found in the inspection are promptly notified to the relevant person in charge of the construction unit for rectification, and reported to the owner in the form of a written report.

The main contents of the inspection work are: whether the laying route of the main optical cable meets the design, the installation quality of the newly-built FTTH special optical switch, the welding of the optical cable inside the optical switch, the construction technology of the optical cable inside the optical splitter box, and the pasting of the signboard. And regularly report FTTH work to the project department in the form of weekly reports, and at the same time report FTTH project progress and FTTH installed capacity to the owner in the form of daily reports.

Later, in the second half of the year, the broadband speed-up plan was launched. In the broadband speed-up plan, there are 40 comprehensive points and 260 pure broadband points, and the monthly total working price of broadband speed-up and the work plan for the next month are reported to the owner every month. Remove the cut-off connector of the cable and strictly grasp the removed part of the cable. Before construction, the construction unit is required to check the construction organization plan, and the cut-off joints proposed by the construction unit with material use changes are strictly controlled according to the construction site. In the cable removal project, the process of cable removal is supervised by on-site supervision, and the length of cable removed is recorded, which is verified when the cable is put into storage.

Before each project starts, make some detailed understanding of the main planned projects, including the materials used in the project and the construction sequence, make a clear inspection of the materials for on-site construction, compare the engineering design text handed over by the construction unit with the on-site construction of the day, and finally report the on-site construction of the day to the owner so that the owner can understand the construction site situation and construction progress of the project. In the process of supervision, I mainly focus on the control of quality, progress and safety, mainly emphasizing control in advance and prevention first. In combination with the side station in the construction process, I will ask the construction unit to carry out rectification in the form of oral notice in time if any quality and safety hazards are found.