Summary is to review and analyze a certain period, a certain project or a certain work afterwards, so as to draw a regular conclusion, which can give us guidance in the next stage of study and work life. I think we need to write a summary. However, I found that I didn't know what to write. The following is my carefully compiled summary essay on the work of engineering cost engineers, hoping to help everyone.
It's almost half a year since I graduated, and I've been in the company for four months. Through the care of leaders, the help of colleagues, and my own efforts and adjustments, I have made some achievements in the professional transformation, and at the same time I have a certain understanding of work processes.
As a project cost personnel, the most basic thing is to understand the drawings and be familiar with the cost software. The most important thing is to understand all parts of the drawings, that is, to understand the drawings. As the installation cost personnel, they must also have their own analysis of the design of each part of the drawings and have certain spatial imagination ability, so as to have a clear understanding of power distribution and water supply and drainage pipe network.
Secondly, it is a summary of my work during this period.
First of all, attitude is everything. During this period, with the drafting of the bill of quantities of several projects, my mentality is also in a state of constant adjustment. Because, installation cost is not my main study direction during my school days, and I just started to contact this work, and there are too many unknowns. Reading books all the time doesn't help, but it has greatly improved me and helped me integrate into this industry. With more and more aspects of work design, some parts that are unclear about the content of the book are gradually becoming clear. For the work of every industry, you must devote yourself wholeheartedly to this industry in order to do the work better, and attitude determines everything.
Second, there is no end to learning. The engineering industry is constantly producing new technologies, new designs and new prices, which also makes our work complete in the process of continuous learning, continuous improvement and continuous sublimation. Compared with the initial contact installation project, the calculation of each power distribution part and each water supply and drainage arrangement part has to be turned over, which has been improved to a considerable extent, but it is not enough. With the deepening of work content, I have to further explore and think about the knowledge related to installation cost in the state of half practice and half study. Further study can gradually improve my understanding of this professional knowledge.
Third, the combination of different majors. The whole thing is relatively simple, but there are some data that are not available on the installation design drawings, but can be found on the construction drawings or structural construction drawings, such as the elevation of a certain floor or the location of rainwater pipes. In addition, the installation position and quantity of fire extinguishers, etc. , refers to several projects I am currently in contact with, such as Jin Fu Printing Center Factory and its affiliated facilities or Guanban Central Primary School in Lianjiang County. This is an important content, and you should take it with you when you receive the project.
Fourth, look at the drawings and design instructions. When we get the design blueprint of a project, we must first check whether there are any missing drawings against the drawing catalogue; Then learn to carefully study the design instructions of each division and refer to the design drawings, that is, look at the drawings. Only knowing every detail in the drawings can help us calculate the engineering quantity better. Secondly, we should be alert to the part that is included in the design description but not shown in the design drawings, so this study should reach an understanding with the designer or the owner whether it is necessary to calculate this part; Moreover, in the calculation process of pipeline anticorrosion, metal structure, lightning protection and grounding of the whole building, we must pay serious attention not to cause omissions or calculation errors in a certain part.
Fifth, calculation rules. Whether it is installation, civil engineering or even other professional cost work, calculation rules are very important. Without rules, there would be no Fiona Fang. Each chapter, each subtitle and the fixed consumption of each major in the bill of quantities have a detailed description of the calculation method of a certain calculation index. For unfamiliar parts, the calculation rules of each project should be carefully studied before calculation to determine which quota sub-item should be applied to all calculated components or a power distribution part, and pay attention to the composition of each quota consumption. This can prevent some parts that have been included or not included in the consumption from being over-calculated or omitted in the calculation process, so as to get the most accurate results.
Sixth, combine with reality. The calculation rules play an important role in the calculation of bill of quantities. In the installation design, designers often ignore the difficulties in actual construction for the sake of aesthetics, especially the wiring of electrical piping. Due to human factors in construction and the need of construction sequence, installation workers usually embed wires and pipes with civil construction personnel first, and then thread them. Because of this, the wiring method must be simple, the distance should be short, and the number of turns should be less, so it is easiest to lay straight between electrical appliances and distribution boxes, and the construction difficulty is relatively low. Some three-dimensional spatial wiring methods require us to have good spatial imagination and calculate the required engineering quantity in combination with the actual situation. Therefore, it is very important to combine practice in the calculation of bill of quantities. At the same time, we should pay attention to various design changes and combine them with drawings.
Seventh, the characteristics and name of the project. The compilation of project features in the installation bill of quantities needs to refer to the description of project features in the appendix of the bill valuation specification, and at the same time, it should be compiled in combination with the fixed project name.
Eighth, the preparation of instructions. Bill of quantities, bill of quantities and compilation instructions are three indispensable whole. Everyone has their own views on design drawings, which has become a big trouble in the comparison of engineering quantities. Then, with the compilation instructions, they can clearly describe their own basis in the calculation process and form a whole with the calculation of engineering quantities. Including project overview, valuation basis, cost setting, compilation basis, brand recommendation and other elements.
Ninth, new and old quotas. Compared with the old quota, the new quota is much easier to apply for, and there is no unit restriction, which reduces unnecessary mistakes caused by unit problems. In terms of electricity consumption, there are standards for application, especially the specific size of the distribution box. In terms of equipment, there is no clearer classification of equipment with various specifications, and it is no longer just a quota definition of a certain specification category; In the aspect of water supply and drainage, the increase of pipe fittings consumption in the seventh volume of water supply and drainage pipeline quota reduces the time for calculating the number of various pipe fittings and improves the efficiency; Sanitary ware, finished sanitary ware In the old quota, the quota of finished sanitary ware was negotiated separately by the valve and the body of sanitary ware, while in the new quota, the valve and the body of sanitary ware were combined. The new quota reduces the multiple of normal material loss in unit reconstruction, thus improving the cost level to a certain extent.
In a word, cost is a work of continuous accumulation and innovation. We need to keep abreast of the updates of various periodicals and software. The price of materials changes rapidly. If we don't grasp it well, it will be difficult for us to do the work well. At the same time, the attitude and mentality in the calculation process are very important, and we can't give up halfway. We must take every component seriously and not be careless.
The above is my summary of my work during this period. If there are any shortcomings, please point them out so that I can finish my work better.
Time flies, half a year has passed in a blink of an eye. Looking back on my work in the past six months, with the careful guidance of the company leaders and the enthusiastic help of my colleagues, my ideological consciousness and professional ability have been greatly improved, and now I am basically competent as a cost engineer.
Growth requires constantly summing up experience, constantly absorbing new knowledge, and constantly improving and innovating. A company is like this, and so is a person. In order to do a good job in the future, sum up experience and learn lessons, the work in the first half of 20xx is summarized as follows:
Among the projects that our department has done since the Spring Festival, the representative ones are the office building of Tianjin Shunxin Industry and Trade Co., Ltd., Tang Zhong Cultural and Sports Center, the budgetary estimate of the second phase relocation project of Taiping Town, and the budgetary estimate of the municipal planning of Dayushan plot in Huludao. The office building of Tianjin Shunxin Industry & Trade Co., Ltd. is a simple European office building. The design and decoration are very complicated, and many decorative things have never been touched before.
During the second relocation project of Taiping Town, I became a high-rise for the first time and learned a lot of new knowledge. Time was tight. Through our teamwork, we finally finished the work well. This is the first time that we have done a provincial project to estimate the municipal planning of Dayushan plot in Huludao. With the support of the company and the enthusiastic help of old comrades, we installed and became familiar with Liaoning quota in a short time, and finally completed the work.
Through half a year's work, I learned a lot of new knowledge, but also learned my own shortcomings.
First of all, it is very important to improve the professional knowledge and skills of cost. Now is the era of automation, and the quotation of modern engineering is mostly the mode of list quotation. Fast electronic budget software is very important for a cost engineer. After half a year's practical training, I have basically mastered some basic skills of using Guanglianda and Tianjin Construction Cost Software, but I am still not very skilled. In the future, I will strengthen this kind of practice and pay attention to learning skills, which can not only improve the budget accuracy but also shorten the budget time.
Secondly, it is very important for a good cost engineer to be familiar with the quota. In the previous work, there were projects with complex technology. Because of the tight time, I was not very familiar with the quota, which led to low work efficiency and sometimes easy to make mistakes. In the next period of time, I plan to spend some time to get familiar with Tianjin's civil engineering and municipal quota seriously, ponder it carefully, and gradually be able to use it freely, which will greatly help the accuracy of the project budget and final accounts in the future, and I can do my work well on time and with good quality.
Thirdly, due to the special relationship between the company and the design institute, the project source is mostly the design institute, which determines that the projects we do are mostly budget estimates. This requires us to constantly sum up experience, analyze the cost indicators of different types of projects, and make preparations for future work. At the same time, the relevant documents of the second-class expenses also need us to study and study constantly. Only by being familiar with the provisions of the document can we accurately calculate the project investment and complete the task well.
One more thing, in terms of work attitude, it is not enough just to be willing to study and not afraid of being tired. What we need to learn now is working methods, and what we need to learn is working attitude. We are responsible for the work we do. Unlike in school, it can be solved by correcting mistakes or saying sorry; Now what we have worked out is real money, and we are responsible to our customers and the company. So we should be careful and responsible in everything we do.
Our work is a process of constantly discovering and correcting problems. It's not terrible to have problems. The terrible thing is to recognize them and develop them. In the future work, we should make good use of the convenience provided by the company, learn from old comrades and colleagues, make up and correct our own shortcomings, and grow together with the company.
Project Coster Work Summary: I officially came to work in the company on XX, XX, XX. I have finished a complete budget work, because I only calculated the engineering quantity before. Although my work content has changed a lot, with the care and help of my leaders and colleagues, plus my hard study and study, I quickly adapted to the working environment. Now I will briefly summarize the work in these two months as follows:
I. Main work contents
1, engineering quantity calculation. The first week I came to the company was to calculate the quantity of external wall decoration of commercial pedestrian street building. During this week, while I was familiar with the working environment, I looked at the drawings and calculated the engineering quantity, and recorded the problems in the drawings so that I could ask questions later and use them in the final measurement.
2. Material quotation. Contact the construction unit first, let them give us an offer, analyze it and find out the most reasonable offer. After several quotations, I found it important to be cautious. We need to know what materials are included in the quotation and what the price difference is each time. To do this, we still need to do a lot of work, and I need to continue to work hard.
Step 3 measure the price. The next step is to connect with consulting companies and internal control departments, consult while learning, and work with company leaders and colleagues. After several exercises, I gradually became familiar with and explored the essentials of my work.
4. Go to the site to see more and learn more. Have the opportunity to go to the site to see the construction technology and progress, and lay the foundation for me to further improve the project cost and understand the construction technology.
Second, the job responsibilities
At present, the responsibility is to strictly calculate the engineering quantity, audit the unit price, be familiar with the site progress and understand the contract content.
Third, development planning.
Next, we should be further proficient in fine decoration cost, learn to apply civil engineering cost and installation cost, obtain the certificate of national registered cost engineer, and further learn construction technology. In short, in the past three months, I have made great progress through hard work and study, but there is still a certain distance to do well.
In the future, I will further strengthen my study, work hard, give full play to my personal expertise and do my best to do a good job in project cost.
A summary of the work of the engineering cost engineer: Fan Wen 4. Looking back on the work in the past year, with the guidance and help of the leaders and colleagues of the project department, certain achievements have been made in all aspects. I will remember everything they taught me, and I will try to "look back and not regret wasting my time!" " "
In order to do a better job in the future, make yourself better in the future work, sum up experience and learn lessons, the work in the probation period is summarized as follows:
1. As a cost engineer, I am a newcomer in the field of engineering cost. I am very unfamiliar with the working environment and have a little knowledge of the industry I am engaged in. However, with the help of the leaders and colleagues of the project department, I have a deep understanding of the working environment, rules and regulations and my own work, and I can quickly integrate into this large group in a short time, laying a good foundation for the smooth progress of my future work.
2, obey the work arrangement of the project department leaders, and actively do a good job. In my work, I mainly do the installation budget work, participate in the bidding work of the project department, often communicate with the owner at ordinary times, and report the material plan and progress to the owner on time.
3. Strengthen study after work. Always pay attention to the information related to budget work, learn the skills of engineering quantity calculation, learn the engineering budget software, and learn the relevant knowledge of installation quota, so as to prepare for future work and improve work efficiency.
4. During this half year's working time, I had the honor to be the Communist Youth League Secretary of the Project Department, encouraged my colleagues in the Project Department to work actively, and organized some amateur activities, such as table tennis competitions, which enriched my spare time and improved my interpersonal relationship to some extent.
Although I have a certain understanding of the budget industry, I also found many problems in my work. For example, personal initiative needs to be improved; Learning attitude is too anxious; At present, only preliminary calculation and simple bidding can be carried out for a project, but some unusual experience problems and charging problems in the calculation process are very vague. I will think more, think more, communicate more with others and constantly recharge myself in my future work.
In order to work and study more effectively in the future, I am determined to spend time to strengthen my study in the following aspects:
1, continue to study the professional knowledge of budget, accumulate more experience related to this major, consult more relevant budget materials, integrate theory with practice, and really apply what you usually learn to practical work, so as to truly master the budget.
2, clear the job responsibilities of the cost member, according to the job responsibilities of the cost member to do their own work. Deepen the understanding of post responsibilities, change ideas as soon as possible and make greater contributions to the project department.
3. In my future work, I will definitely carry forward my advantages, correct my shortcomings, foster strengths and avoid weaknesses, strive for greater achievements and constantly improve myself.
In short, 20xx has made some achievements and found its own shortcomings. But achievements can only represent the past, and the most important thing is to find out your own problems and correct them. I believe that in the future work, I will do my job well, give full play to my best ability, make continuous progress in my work and achieve greater results.
Work summary of engineering cost engineer: how time flies! In a blink of an eye, I have been in the company for six months. Looking back on my work in the past six months, with the careful guidance of the company leaders and the enthusiastic help of my colleagues, my thinking and business ability have been greatly improved, and now I am qualified for more than half of the work of a cost engineer. During this working time, I worked hard to complete my work and actively cooperated with my colleagues and other departments. As a budgeter, I work according to the rules and regulations of the company and the marketing department, and complete the budget work of the marketing department on time and with good quality.
The following is a summary of my work, mainly from the following aspects:
1. According to the requirements of company leaders, the completed work is as follows:
(1) Inquiry of An Wei Tiankang Pharmaceutical Project.
(2) Inquiry of Shanghai Xuhui Riverside Open Space Project.
(3) Inquiry of 3)MEMS project.
(4) Inquiry of Foshan project in Guangdong.
(5) Inquiry of Shanghai Art Bonded Service Center Project.
(6) Inquiry and quota of the design project of Shanghai Stant Bio-ICT-02 Technology Center.
(7) Inquiry for Clean Room in Mianyang, Sichuan.
(8) Inquiry, sealing and bidding for the special optical fiber purification room of Shanghai University.
(9) Inquiry for Nanjing Nanrui Project.
(10) Inquiry of Fujian Juneng Power Plant.
(1 1) The second inquiry of Shanghai Art Center.
(12) Shanghai Xuhui secondary inquiry.
(13) Inquiry of Suzhou Wujiang Smart City Industrialization Project.
(14) Sealed bidding for the project of College of Life Cells, University of Science and Technology Shanghai.
(15) Technical bid, commercial bid and seal of HVAC reconstruction project of laboratory, technology department and gel line of Zheng Da Qingjiang Pharmaceutical Co., Ltd., Jiangsu Province.
(16) Commercial bid for the pilot construction project (secondary decoration) for the integration of county-level food safety testing resources in Binchuan County.
(17) Final accounts of five projects of Wuxi China Resources. (a) CMP04 final accounts; B. SEZ0 1 final accounts; C. SEZ02 final accounts of relocation project; D, corrosion 9600C final accounts; E, microelectronics laboratory renovation project final accounts)
2. Obey the work arrangement of the company leaders and actively do a good job outside the marketing department. Everything is based on the interests of the company and cooperates with other departments.
3. Use the rest time after work to strengthen study. At ordinary times, we should pay attention to collecting the current quota documents and material prices in Jiangsu Province, strengthen the study of quota calculation rules, quota description and engineering quantity calculation skills, and install professional knowledge such as software calculation and pricing.
4. Make a good work plan for next year, so that you can do every job in an orderly way.
I have come into contact with many new things, met many new problems and learned a lot of new knowledge and experience since I worked, which has improved my ideological understanding and working ability. While learning a lot of new knowledge, I also understand my own shortcomings.
First of all, it is very important to improve the professional knowledge and skills of cost. Now is the era of automation, and modern engineering quotation is mostly the mode of list quotation. Fast electronic budgeting software is very important for a cost maker. After such a long training, I have basically mastered some basic skills of Guanglianda pricing software, Xing 'an Deliyun pricing software, new point list cost software, CAD quick drawing software and AutoCAD software. I will strengthen my training in this field and pay attention to my study.
Secondly, it is very important for a good cost engineer to be familiar with the quota. In my previous work, there were some technically complicated projects. Because I am not particularly familiar with the quota, my work efficiency is not high, and sometimes I am prone to make mistakes. In the next period of time, I plan to spend some time getting familiar with the budget quotas in Jiangsu and Shanghai, and I will be able to use them freely slowly, which will greatly help the accuracy of the budget and final accounts of engineering quantities in the future, and I will also be able to do my work well on time and with good quality.
Thirdly, we need to constantly sum up experience and analyze the cost indicators of different types of projects we have done to prepare for future work. At the same time, the relevant documents of the second-class expenses also need us to study and study constantly. Only by being familiar with the provisions of the document can we accurately calculate the project investment and complete the task well.
One more thing, in terms of work attitude, it is not enough just to be willing to study and not afraid of being tired. What I want to learn now is working methods, and what I want to learn is working attitude. I am responsible for the work I do. Unlike in school, it can be solved by correcting mistakes or saying sorry; It's real money now, and I have to be responsible for the company. So I will do everything carefully.
In next year's work, I will continue to work hard and learn more from leaders and colleagues. Correct and make up their own shortcomings and defects in time, improve their ability in cost and all aspects, so as to better make their due contributions to the company.
Over the past six months, everyone has been very concerned about me and taught me a lot of professional knowledge and the truth of being a man. Everyone is very modest. In private, we are like a family. My leaders and colleagues are very kind to me, so I have a good time every day. Here, I want to thank the leaders and colleagues who care about me. I will study and work harder next year and live up to everyone's expectations.
;