1. The stadium contract can include the names and ID cards of both parties, and indicate that the contract is signed through consultation. 2. Secondly, you can write the contract of the stadium, such as the area of the stadium and the duration of the contract. 3. Then you can write the responsibilities of both parties. 4. Finally, Party A and Party B can sign and seal it.
Stadium contract 1
Party A: City Sports Center
Legal representative:
Address: Tel:
Party B:
Legal representative:
Address: Tel:
According to the Contract Law of People's Republic of China (PRC) and relevant laws and regulations, Party A and Party B, on the principle of equality and mutual benefit, have reached the following agreement on the contracting of the Sports Center 1 and No.2 tennis courts through consultation.
I. Contracted projects
Party A agrees to contract the tennis courts and office buildings located at Sports Center 1 and No.2 to Party B for independent operation, with an area of about square meters.
Second, the contract period
Starting from the 20th of this month. * * * Two years.
III. Contract Payment and Payment Method
1. Party B shall pay RMB four hundred and eighty-five thousand yuan every year and RMB nine hundred and seventy thousand yuan every two years, and pay monthly.
2. Payment method. Party B shall pay the contract fee of last month (40,000 yuan per month) to Party A before the 5th day of each month, and settle it quarterly. The contract fee will be increased once every three quarters, with an increase of 5,000 yuan each time, that is, not less than1200,000 yuan in the third quarter of 2000, not less than1200,000 yuan in the fourth quarter, not less than1200,000 yuan in the first quarter of 2000 and not less than 120.5 in the second quarter. (From the third quarter of 20_ 2000 to the second quarter of 20_ 2000, the contracted funds in each quarter were circulated in this way).
Fourth, deposits.
Party B shall pay a performance bond of RMB ninety-seven thousand Yuan only (20% of the annual contract amount) to Party A within three days from the signing date of this contract. After the expiration of the contract, if Party B has not violated its obligations under this contract and handed over the tennis court to Party A in good condition, Party A will refund the deposit to Party B in full without interest.
Verb (abbreviation for verb) Contractor's delivery
Within three days from the date when Party B pays the deposit to Party A, Party A will deliver the contracted project to Party B, and both parties will sign the handover book, which will list the current situation of the house and ancillary facilities item by item, and it will be an annex to this contract after being signed by both parties.
Sixth, the way of contracting. During the contract period, Party B shall operate independently, be responsible for its own profits and losses, and go through relevant procedures by itself. All creditor's rights and debts incurred during this period shall be borne by Party B. ..
Seven. Rights and obligations of Party A
1. Ensure that the project contracting right is flawless. If a third party claims rights, the responsibilities shall be borne by Party A. ..
2. Collect the contract price and other income as agreed in this contract, and bear the tax burden of the above income.
3. Be responsible for the maintenance of large-scale projects (one-time cost 1 over 10,000 yuan) in the contracted site.
4. Manage Party A's on-the-job employees and assist Party B in handling disputes with Party A's employees.
Eight. Rights and obligations of Party B
1, handle the corresponding business license according to law, operate legally, and shall not violate the relevant provisions of laws and regulations.
2. Pay the contract money and related income belonging to Party A to Party A on time as agreed in the contract. ..
3. After Party B pays the contract amount in full, the remaining income obtained by Party B during the contract period shall be owned by Party B, and shall bear the tax burden of the above income.
4. The office space used by Party A's original tennis court is handed over to Party B for use. Party B shall bear all daily operating expenses and expenses incurred during the contract period, such as water, electricity, telephone and daily minor engineering maintenance fees.
5. During the contract period, discount cards, consumption cards or other preferential measures may be formulated, but the validity of the above preferential measures shall expire before the expiration of the contract. Any disputes arising therefrom shall be settled by Party B, and shall not be restricted by the expiration of the contract.
6. Party B shall take strict care of all public facilities and equipment in the venue and be responsible for keeping them in good condition. When this contract is delivered to Party A at the expiration date, it shall ensure that the intact rate of the equipment reaches 100%. If the public facilities and equipment are damaged by Party B, its employees or customers who consume in Party B, Party B shall be responsible for maintenance or compensation. ..
7. In the process of operation, we should strictly abide by the management systems and regulations of the central compound, strengthen safety management, implement various safety precautions, and pay special attention to fire prevention and theft prevention to prevent all accidents. If an accident occurs due to Party B, Party B shall bear all the legal consequences and compensation responsibilities arising therefrom.
8. Upon the expiration or early termination of this contract, all creditor's rights and debts during the contract period shall be cleared by Party B, and Party B shall not undertake any guarantee, mortgage or loan in the name of Party A. All legal consequences caused by Party B's violation of this agreement shall be borne by Party B. If losses are caused to Party A, Party B shall be responsible for compensation.
9. Without the written permission of Party A, Party B shall not change the name, purpose and structure of the stadium and office building or sublet or subcontract it to others in any way, including but not limited to subletting or subcontracting in the form of cooperative operation and financing. During the operation period, if it is necessary to modify the fixed facilities of the stadium, Party A's written consent must be obtained in advance, otherwise the construction may not be carried out.
10. During the contract period, the promotion activities carried out by Party B in the name of Party A's tennis court shall be proposed by Party B and reported to Party A for approval and implementation, that is, they shall be handled on a case-by-case basis.
IX. Employment of employees
1. Party B shall give priority to Party A's on-the-job employees, sign a labor contract separately, and pay Party A the management fee of 600 yuan/person every month. The salary, welfare and annual assessment bonus (year-end double salary) of these employees are paid by the center. Overtime for employees or holidays shall be decided by Party B at its own discretion, and shall be negotiated with the employed employees.
2. Party B shall formulate relevant systems such as employee management, rewards and punishments, and sign labor contracts with the employed employees, and all rights and legal responsibilities arising therefrom shall be borne by Party B. ..
X. Cooperation projects between the two parties
1. Party A shall authorize Party A's representative in writing to sign the venue fees for reception tasks, competitions and training tasks, which shall be settled at 30% off the venue rent and deducted from the contract fees.
2. The advertisements in the sports center are owned by the sports advertising company, and it is allowed to publish one-time competition advertisements in the stadium, and the income shall be enjoyed by Party B. ..
3. Except for the above paragraph 2, the profit of all the perennial advertisements of Party B shall be shared equally by Party B and Party A except the fixed and necessary expenses. All advertisements signed by Party B shall be reported to Party A for the record. Profits are settled every six months.
4. Advertising sponsorship for large-scale activities and sports competitions at or above the provincial level shall be jointly organized by Party A and Party B, and the profits and expenses shall be equally borne and distributed by both parties.
XI。 responsibility for breach of contract
1. If Party B fails to pay the contract money on time, it shall pay a penalty of% of the paid amount for each day overdue. If other losses are caused to Party A, Party B shall compensate separately.
2. After settlement by both parties, Party B shall pay other income to Party A within seven days. If it is not paid within the time limit, it shall pay% of the overdue fine to Party A every day.
3. If Party A violates Article 7 of this contract, it shall pay RMB to Party B as liquidated damages; If Party B violates the agreement in Article 8 of this Contract, it shall pay a penalty of RMB Yuan to Party A, which shall be deducted from the deposit, and the insufficient amount shall be paid by Party B separately. ..
Twelve. Termination of contract
Both parties shall not terminate the contract for any improper reason. If one party requests to terminate the contract for justified reasons, it shall notify the other party one month in advance, and the contract can be terminated only after the other party agrees. If one party terminates the contract in advance without justifiable reasons, it shall compensate the other party for its losses and expected profits. However, if Party B commits any of the following acts during the contract period, Party A may unilaterally terminate the contract at any time and deduct the deposit paid by Party B as compensation. If Party A's losses cannot be compensated, Party B shall compensate again:
1. Party B delays to pay the contract price for more than 30 days;
2. Party B violates the prohibitive provisions of this contract;
3. Party B is punished by the tax authorities for failing to pay taxes according to law;
4. Party B fails to complete the operation procedure, resulting in illegal or illegal operation;
5. Party B violates the contractual obligations and fails to correct it after being warned.
Thirteen. force majeure
If the contract cannot be fully performed or cannot be performed due to force majeure, both parties may modify or terminate the contract through consultation, and neither party shall be liable for breach of contract.
Fourteen any other business
Matters not covered in this contract shall be settled by both parties through consultation, and a supplementary agreement shall be signed, which has the same legal effect as this contract.
Fifteen. Jurisdiction over disputes
In case of any dispute arising from this contract, both parties shall settle it through negotiation in time. If negotiation fails, a lawsuit may be brought to the people's court where Party A is located.
16. This contract is made in duplicate, one for each party, and shall come into effect after being signed and sealed by authorized representatives of both parties.
Party A: Party B:
Signature time: Signature time:
Contract II of Stadium Contract Operation
Owner (full name): Yan Song Town Yan Song Community Contractor (full name):
In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, and following the principles of equality, voluntariness, fairness and good faith, both parties reach an agreement on the construction of this construction project and conclude this contract.
I. Overview of the Project
Project Name: Yan Song Farmers' Cultural and Sports Center Gymnasium and Zhushiba Area Road Construction Project Location:
Project content: All the project contents shown in the construction drawing of the gymnasium of the Farmers' Cultural and Sports Activity Center in Yan Song, yuqing county, and all the project contents shown in the road construction drawing of Zhushiba area. Source of funds: raised by the employer. Scope of project contracting.
Scope of contract: all the work contents shown in the construction drawing of the gymnasium of yuqing county Yan Song Farmers' Cultural and Sports Activity Center, and all the work contents shown in the road construction drawing of Zhushiba area. contract period
Commencement date: 20_ year 65438+1October 20th, and completion date: July 20th _ year 10.
The total calendar days of the contract duration is 200 days (calculated according to the actual duration). Third, the quality standard
Engineering quality standard: the requirement of industrial engineering quality acceptance specification. Amount (in words): six million yuan only.
¥:
This price is an adjustable contract price, which shall be settled according to Article 23 of the Special Terms and Conditions of this contract after the project is completed.
Verb (abbreviation of verb) Documents constituting a contract include: 1, 2, 3, 4, 5, 6, 7, 8, 9, contract agreement, letter of acceptance, tender and its attachments, special terms and conditions of contract and general terms and conditions of contract.
Standards, specifications and related technical documents, drawings, bill of quantities, project quotation or budget.
10. The written agreement or documents of both parties on the negotiation and change of the project shall be regarded as an integral part of this contract. Intransitive verbs The meanings of related words in this agreement are the same as those given to them in the General Conditions in Part II of this contract.
Seven, the contractor promises to the employer to carry out construction and completion in accordance with the contract, and undertake the project quality warranty responsibility within the quality warranty period.
Eight, the employer promises to the contractor to pay the contract price and other payments in accordance with the time limit and manner agreed in the contract. The date of conclusion of this contract is 20_ year 65438+ 10/.
Place of signing the contract: Office of Yan Song Community Neighborhood Committee, Yan Song Town. This contract shall come into effect after being signed and sealed by both parties. Employer: (official seal) Address: Yan Song Town, yuqing county Legal Representative: Authorized Agent: Tel: Fax: Account Name: Account Bank: Account Number: 56440 1 Contractor: Address: Legal Representative: Authorized Agent: Tel: Fax: Account Name: Account Bank: Postal Code: (official seal)
Construction contract of construction project
Part II Special Terms and Conditions
People's Republic of China (PRC) Ministry of Construction
State Administration for Industry and Commerce
Stadium contract management contract
Party A (hereinafter referred to as Party A):
Party B (hereinafter referred to as Party B):
In order to better complete the construction task of the new gymnasium of the Southwest Tower Living Base, clarify the responsibilities of both parties, and ensure the quality and quantity, this agreement is hereby concluded through consultation between both parties, and it is hoped that both parties will jointly implement it.
1. Project name: Formwork Project of New Gymnasium in Southwest Living Base of Tower.
2. Contract method and contract unit price: the contractor and small materials (all materials except steel pipes, fasteners, wood blocks and templates). According to the actual settlement of quantities; According to the developed areas, 63 yuan per square meter (63 yuan).
3. Payment method: Pay 70% to Party B according to the current month's construction progress, go through settlement procedures after passing the acceptance, and pay off the balance after settlement (all labor wages will be settled at the end of the year).
Four. Organization leader: 1. Party B must designate special management personnel to be responsible for arranging production, personnel deployment, technology, construction safety and civilized construction.
2. Party B shall obey the unified command and deployment management of Party A, abide by various rules and regulations, and cooperate with other sub-projects in construction. Otherwise, Party B will be fined according to regulations.
3. During the construction period, if Party B has construction quality defects due to lack of technical strength, all losses caused by the delay of construction progress will be incurred. Party B shall be responsible for it, and Party A has the right to unilaterally freeze the project payment contracted by Party B, and settle it according to 70% of the completed project amount, and 30% will be used as compensation for Party A's losses, and Party A will arrange the construction separately.
Verb (abbreviation for verb) The responsibility of both parties.
1. Party A's responsibilities:
(1) Party A shall provide a copy of Party B's construction drawings.
(2) Ensure the supply of materials. If the supply is insufficient for various reasons, Party A shall arrange other work in time, and Party B shall obey Party A's deployment. ..
2. Party B's responsibilities:
(1) is responsible for the construction tools of this project, including hand saws, hand drills, wrenches, hammers, steel chisels and demolition tools.
All tools for formwork engineering, such as crowbars, protective gloves, raincoats, safety of aerial work, etc. (2) Civilized construction. Clean up the construction site in time after each construction. Reasonable use of short square timber and small formwork, no chopping and sawing, no overqualified, and no waste.
(3) Carry out the construction in strict accordance with the design requirements and construction specifications to ensure the construction quality of the project. If rework is caused due to Party B's construction technology, all losses caused thereby shall be borne by Party B. Be familiar with the drawings, pay attention to the wall thickness of each part, and make the boundary of wall thickness mortar according to the requirements of design drawings.
(4) Every worker should observe discipline, and must not fight or make trouble. In case of violation, Party B shall bear the responsibility. In case of a fight, the two owners will pay a fine of 500~ 1000 yuan first, and all medical expenses will be borne by the person who started the fight first. If the circumstances are serious, they will be sent to the local political and legal department for handling.
(5) It is forbidden to steal. If theft is found, it will be handled at ten times the price, cleared out of the team and sent to the public security department for serious handling.
(6) Educate workers to take good care of public property, and it is forbidden to damage public facilities. If found, they will be punished.
(7) Responsible for unloading the materials and tools of this type of work, and tidy them up. Remove the templates and squares, remove the nails, and sort them neatly according to the specified positions.
(8) Accept all management systems specified by Party A, see the terms of project management system on the construction site for details.
Duration of intransitive verbs: according to the requirements of the construction schedule planned by Party A, the construction task shall be completed within the specified time, and those who fail to complete it within the specified time limit shall be fined according to the regulations.
Seven, the fine system
Construction personnel must wear labor protection articles as required by Party A, and be punished in violation of regulations as required by Southwest Tower Project Department. Those who get drunk, make trouble and fight at the construction site will be fined 200-500 yuan. In addition to investigating its responsibility, if the circumstances are serious, it will be handed over to the local law enforcement department for handling; 200 yuan was fined for urinating in the newly-built building; 500 yuan will be fined if he does not obey the site management and points out that the problem is not rectified in time. If there is any contradiction in the construction, it should report to the person in charge of the site in time to find a solution. It is forbidden to gather people to fight. Whoever fights at the construction site, for whatever reason, will be fined 1000 yuan each time. When laborers enter the site for construction, they must carry out three-level safety education and strictly implement safety rules and regulations. In the event of a safety accident, if it is the responsibility of Party B, Party B shall bear the actual loss of the accident, and at the same time, investigate the responsibility according to the severity of the responsibility and take heavier punishment measures. Once a safety accident occurs, rescue should be organized immediately to protect the scene and report it immediately. It is strictly forbidden to conceal the accident and not report it. Actively cooperate with the quality and safety department of the project department, do a good job in distribution, sign safety responsibility letters at all levels in time, and implement the responsibility system for production safety at all levels. Party B's contractor is the first person responsible for the safety production of this type of work, taking the lead in obeying the law and discipline, strictly prohibiting illegal command, accurately positioning safety, quality, progress and benefits, and ensuring all construction personnel to fully operate. Actively cooperate with the safety knowledge learning, publicity and amateur classes organized by the project department, and implement it to every employee, so as to truly achieve a safety atmosphere of safety first, prevention first and people-oriented.
Eight, safe production and civilized construction:
1, safety production and civilized construction requirements:
(1), Party A organizes Party B's relevant personnel to study and educate the Safety Law, Construction and Installation Workers' Operation Rules for Safety in Production, Construction Safety Inspection Standards, and Xi Construction Safety Management Measures, etc. , so as to enhance legal awareness and safety awareness, and achieve legal and safe construction.
(2) According to the characteristics of the project, Party A shall prepare the safety production and construction scheme, formulate the technical measures and safety production management system for safety production and civilized construction, and Party B shall strengthen the management of safety production and civilized construction on site. The construction site must be arranged and managed in accordance with jgj59-99 "Safety Inspection Standard for Building Engineering" and operated in strict accordance with the requirements of "Operating Rules for Safety Technology of Construction and Installation Workers".
(3) Party A and Party B must educate and train all new workers or workers who change to new jobs, and make safety technical disclosure. Recruited special operations personnel must hold relevant certificates.
(4) Party A will conduct safety inspection and guidance on the construction site regularly or irregularly, and issue a rectification notice in time when problems are found. Party B shall actively cooperate with timely rectification, and Party B shall report the rectification results to Party A in writing, and Party A shall re-examine them within one day.
(5) Party B shall bear all the expenses of safety accidents in the construction in violation of operating rules.
Nine, after the signing of the contract, both parties shall not go back on our word, otherwise the breaching party must pay 50% of the total project amount to the other party as liquidated damages.
X this agreement is made in duplicate, one for each party. Matters not covered shall be settled by both parties through consultation. This agreement shall come into force as of the date of signing.
Signature of Party A's Representative: Signature of Party B's Representative:
The above is what Bian Xiao shared today, and I hope it will help everyone.