1. Preliminary overall concept and modification
Before embarking on the concept of overall planning, you must carefully read the "design task book" (or "design tender") provided by the owner. In the design task book, the owner's requirements for all aspects of the construction project are listed in detail: overall positioning nature, content, investment scale, technical and economic compliance control, design cycle, etc. Here, I also want to remind the designers who have just started: pay special attention to the reading and understanding of the design task book. It is not enough to read it once, but to fully understand and "thoroughly understand" the most basic "essence" of the design task book.
2, the owner's information feedback
After the owner gets the text of the scheme, he will generally give a reply in a short time. Some adjustment suggestions will be put forward in the reply, including modification, addition and deletion of project content, increase and decrease of investment scale, change of land use scope, etc. Designers should adjust, modify and supplement the scheme in a short time according to these feedback information. At present, the computer drawing rate of various design units has been quite popular, so the local plane adjustment can still be completed smoothly and on time. For some major changes, or major adjustments in the overall planning direction, it will take a long time to adjust the planning, or even tear it down and redo it.
3. Expand the initial design review meeting.
The designer shall further expand the preliminary design (hereinafter referred to as "expanded preliminary design") in combination with the evaluation opinions of the expert group. In the expanded text, there should be a more detailed and in-depth general planning plane, general vertical design plane, general greening design plane, plane, vertical and sectional drawings of architectural sketches (with main dimensions marked). In areas with particularly complex terrain, detailed section maps should be drawn. The ground elevation (road elevation, ground elevation, indoor ground elevation) and lake elevation (water surface elevation, pool bottom elevation) of several main spaces must be marked in the profile.
4, construction drawing budgeting
The construction drawing budget is based on the budget estimate in the preliminary expansion design. The budget includes the engineering cost of all design projects in the construction drawing. Including: the total cost of earthwork and topography, the total cost of architectural sketches, the total cost of roads and squares, the total cost of greening projects, and the total cost of hydropower installation projects.
5, construction drawing disclosure
After getting the construction design drawings, the owner will contact the supervisor and the constructor to check and read the construction drawings. Looking at the picture belongs to the overall grasp, and reading the picture belongs to the understanding of specific design nodes and detailed drawings.