When will Shenzhen Metro operate?

Operation time of Shenzhen Metro in 2023: Most lines of Shenzhen Metro will start operation at 6: 20 in the morning and stop at 1 11:30 in the afternoon. The specific time needs to be entered in official website, Shenzhen Metro Bus Company, and then we can know the operation situation and outage time of the specific line.

Brief introduction of Shenzhen subway

Shenzhen Metro refers to the urban rail transit serving Shenzhen City, Guangdong Province, China. Its first line was put into operation on February 28th, 2004, with 65438, becoming the eighth city in China. By February 28th, 2022, the operating mileage of Shenzhen Metro was 547. 12km.

By the end of 65438+February 2022, there were 16 subway lines in Shenzhen, namely 1, 2, 3, 4, 5, 6, 6 branch lines, 7, 8, 9 and 65433.

The total length of subway lines in the city is 547. 12km? There are 365 stations, 438 +02 stations (transfer stations are not counted repeatedly), forming an urban rail network covering 9 municipal administrative regions in Shenzhen, including Luohu District, Futian District, Nanshan District, Yantian District, Baoan District, Longhua District, Longgang District, Pingshan District and Guangming District.

Line under construction

As of June 5438+February, 2022, there were 6 lines under construction in Shenzhen Metro, including Line 3 Phase IV, Line 5 Phase III, Line 6 Phase II, Line 7 Phase II, Line 8 Phase III, the back section of1/and Line 2 Phase II.