According to the spirit of the preliminary work promotion meeting of key railway projects in the whole province on May 19, 2065438, it is clear that the preliminary work of Dali-Lanping railway project is led by Dali Prefecture and coordinated by Nujiang Prefecture. In August, 2065438+2007, Dali Railway Construction Office confirmed through public bidding that China Railway Second Hospital was responsible for preparing the pre-feasibility study report of this project, and the preparation of the pre-feasibility study report of this project has been completed.
Recently, with the cooperation of the national railway construction offices of the two places, the evaluation expert group of Beijing Huaxie Transportation Consulting Co., Ltd. conducted a site survey on the design route and station setting of the project, and held a consultation and evaluation meeting on the pre-feasibility study of the project. According to the design scheme, the expert group evaluated the economic traffic volume, route direction, technical standards, transportation organization, design principles of technical equipment, construction period, investment budget, fund raising and economic evaluation of the project, and formed evaluation opinions.
Then, let's take a look at the specific situation of Dalan Railway!
▼▼▼
Project overview:
The length of the main line from Dali to Lanping is11km, the length of the main line in Dali prefecture is 92.5km, and the length of the main line in Nujiang prefecture is17.6km. According to the first-class national railway, single track, design speed 160 km/h, the main line bridge.
Set up stations along the line:
There are 9 stations on the whole line, namely Shangguan (Hub Station), Yousuo (Yield Station), Second Hospital, Sanying (Yield Station), Shaxi (Intermediate Station), Xizhuang (Yield Station), Jiangtou (Yield Station), Lian Deng (Yield Station) and Lanping (Intermediate Station). Six stations have been opened recently, and three stations are slow.
The pre-feasibility study report of Dali-Lanping Railway successfully passed the expert review, which laid a solid foundation for the project to enter the feasibility study stage smoothly, and marked that the major infrastructure construction in our county will achieve leap-forward development.
Changes after completion:
1, promoting economic development
As soon as the train rings, there are two thousand gold. Railway construction is very important for economic development along the way. The construction of Dalan Railway will make up for the history of no railway in our county. After the project is completed, it will play a vital role in speeding up poverty alleviation, strengthening national unity and promoting the sustainable economic and social development of our county.
2. It is more convenient for citizens to travel.
It will be more convenient to go back to Lanping in the future. According to the design speed of 160km/h, it will take about 40 minutes to get there.
My information:
Friends in Lanping are looking forward to the completion of the railway!
Friends come from afar. If you want to leave, are you looking forward to a trip? There are no noisy tour groups and unclean tourists in the scenic landscape of Lanping.
You can take pictures in any background,
Glittering snow-capped mountains, green rivers and unique ethnic customs,
In Lanping, you will experience the tranquility like a paradise!
There are many delicious foods in Lanping, too. Take your other half to try them!
Lanping people are hospitable! As long as you come, you will not be disappointed!
Scenery and food all the way, I look forward to it!