Introduction of Guangzhou Ring Road?

Ring highway, Guangzhou, located in Guangzhou, Guangdong Province, China, is the first ring highway in China. 1987 started construction, with a total length of 60 kilometers and an investment of 6.3 billion yuan. Speed limit 100km/h, 6 lanes in both directions, 8 lanes in both directions from Shabei to Guangqing. Zhong Da Consulting Company introduced Guangzhou Ring Road as follows:

Project overview

The project started on 1987 65438+ 10/8, with a total length of 60 kilometers and a total investment of 6.3 billion yuan. It is divided into four rings: East, South, West and North. Shabei-Guangqing section 1 August 9891opened to traffic; The section from Guangqing to Guanghua (1990) was put into trial operation on July 3rd and officially opened to traffic on February 2nd. 1993 12 18 north ring road opened to traffic; Guangdan-Dongpu section1997 65438+1opened to traffic at the end of October; Dongpu-Sanjiao section1February 999 12 was opened to traffic; On February 2nd of the same year, 65438 Hainan-Xunfengzhou section was opened to traffic. The whole line was opened to traffic on June 26, 2000. The ring road is divided into four sections: East Ring Road, South Ring Road, West Ring Road and North Ring Road.

The East Ring Road starts from Huangcun Interchange, crosses Guangyuan Expressway, guangzhou-shenzhen railway, Zhongshan Avenue and Huangpu Avenue, crosses the Beidisha Waterway of the Pearl River with Dongpu Bridge, and turns into Xinzhou South Ring Road in Haizhu District.

South Ring Road starts from Xinzhou Interchange in Haizhu District, passes through Luntou Village, Zhou Xiao Village and Sanjiao Interchange, crosses Yajisha Waterway of Pearl River by Yajisha Bridge to South Dongsha Development Zone in Fangcun Village, Liwan District, passes through Dongsha Avenue and Huadi Avenue to Hainan Interchange, and then turns into West Ring Road.

The West Ring Road starts from Fangcun Hainan Interchange in the north, passes through Zengjiao Interchange and Guantian Village, crosses Guangsan Railway, Guangfo Highway, Zhujiang River West Channel to Shabei Interchange, and turns into the North Ring Road.

The North Ring Road is the busiest section of the highway around the city. It starts from Shabeili, passes through Jinshazhou and Hengsha Village to Zengcha Road to the east, crosses Beijing-Guangzhou Railway to Sanyuanli, crosses Guangyuan Road Viaduct, and falls back to Baiyun Mountain halfway near Dajinzhong Road. Baiyun Tunnel crosses Baiyun Mountain to Shahe River, crosses Guangzhou Avenue and Tianyuan Road, and reaches Cencun Interchange. It intersects with South China Expressway and merges at Huangcun Interchange to form the highway around the city.

Its management companies are Guangzhou Beihuan expressway Co., Ltd. and Guangzhou Southeast West Ring expressway Co., Ltd., which are responsible for managing the sections of Beihuan and Southeast West Ring respectively. On September 2, 2007, Kloc-0/,the toll collection of the Southeast West Ring Road stopped. 2065438+At the end of March, 2002, the toll station of Guangzhou Nitrogen was cancelled, and the expressway in Guangzhou area reached a substantial networking charge with the expressway network in Shenzhen area and the expressway network in the Pearl River Delta area.

Service site

Ring Road, Guangzhou has the following entrances and exits and toll stations from the East Ring Road: Guangdan (Huangcun), Dongpu, Xinzhou, Luntou, Tuhua, Sanjiao, Dongsha (eastbound), Hainan, Zengjiao, Huang Qi, Xunfengzhou, Shabei, Guangqing, Guanghua (westbound) and Guangyuan (eastbound).

management company

Its management companies are Guangzhou Beihuan expressway Co., Ltd. and Guangzhou Southeast West Ring expressway Co., Ltd., which are responsible for managing the sections of Beihuan and Southeast West Ring respectively. On September 2, 2007, Kloc-0, the toll collection of the Southeast West Ring Road stopped, and now it is planned to add several interchanges and ramps to facilitate the passage of vehicles.

Engineering characteristics

(1) The red line of land requisition in this project only exceeds the projection of the collision wall outside the bridge deck by 2.0m. In order to reduce the project investment, the construction site is arranged in the infrared range, and the site is narrow, so it is difficult to arrange temporary facilities such as construction access roads.

(2) Planning the road to cross the Guangzhou-San Railway, the Shiweitang branch line and the place where it passes needs to be constructed on the existing line without interrupting the traffic, so the construction safety is difficult.

(3) There are precast 50m, 30m T-beams, 20m hollow slab beams and cast-in-place special-shaped slab beams in this bid section, and the beam types are diverse, the number is scattered, the pile diameter is not uniform, and it is difficult to use machinery.

(4) The girder erection is large, and the girder fabrication site is small. Making and erecting beams are the key control projects in this bid section, and it is necessary to carefully organize and reasonably arrange the construction of bored piles, piers, capping beams and making beams.

⑤ Short construction period and high quality requirements.

The above is the introduction of Guangzhou Ring Road by Construction Network. If you want to know more about highways, please pay attention to the architectural knowledge column of Zhong Da Consulting.

For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.