What positions does the project management category include?

What positions are included in the project management category?

1, project manager position;

2. Chief engineer position;

3. General Department post;

4, the finance department position;

5. Engineering post;

6. The position of the measuring group;

7. The position of the contract department;

8, security officer position;

9. Professional engineer position;

10, quality inspection engineer position;

1 1, documenter position;

12, position of mechanical equipment department.

Extended data:

Division of responsibilities of project department manager:

A, the project manager responsibilities:

1. The project manager is the authorized agent of the legal representative of the construction enterprise and is fully responsible for the project on behalf of the enterprise.

2. Abide by the policies and regulations of the state and local governments, implement relevant rules and regulations and instructions from superiors, and perform the project contract signed with the owner on behalf of the enterprise.

3. Organize and deploy a lean and efficient project management team, and determine the responsibilities and authorities of various departments and institutions in the project management department.

4, presided over the preparation of the project construction organization design and quality assurance system, presided over the preparation of the overall project schedule and quarterly and monthly construction schedule, timely organize and deal with major technical problems in the construction.

5, according to the requirements of the contract and the instructions of the superior, to ensure that the construction personnel, mechanical equipment comes into play on time, to do a good job of material supply.

6. Presided over the formulation of the project cost plan, examined and approved the financial cost of the project, and formulated the income distribution plan for relevant personnel of the project.

7. Be responsible for the scheduling, arrangement, use and fund guarantee of the project funds.

8. Go deep into the construction site, deal with major construction accidents and solve major problems in construction.

9, timely processing of creditor's rights and debts, do a good job of asset liquidation, to ensure that the loss of state-owned assets.

10, do a good job in the spiritual civilization construction of the project and strengthen democratic management and ideological and political work.

1 1. Implement relevant national laws and regulations to ensure that the wages of migrant workers are paid in full and on time.

12. Be responsible for the performance of internal and external contracts of the company, and organize various inspections, supervision and assessment on this basis, and accept the supervision of superior departments.

13. Reward excellent employees and punish those who violate discipline according to the rules and regulations of the superior.

14. When an industrial accident occurs, organize rescue according to the emergency plan and participate in accident investigation and handling.

15, strengthen the management of materials, machinery and finance, and improve the management decision-making level and command ability.

Second, the chief engineer job responsibilities:

1, under the direct leadership of the project manager, be responsible for the technical management and quality management of the whole bid section, and carry out the national and superior guidelines, policies, systems and methods related to quality work.

2. Organize technicians to be familiar with the contract documents and construction drawing design documents, understand the design intent, and participate in the design disclosure and blue prints.the design organized by the owner.

3, presided over the preparation of project implementation construction organization design and quality objectives, and organize their implementation.

4. Arrange the daily production activities of the project, supervise the implementation of the overall project schedule and the concrete implementation of quarterly and monthly construction schedule.

5. Responsible for formulating the quality responsibilities and work quality standards of various departments and technicians, making fair evaluation and assessment opinions on the performance of responsibilities every month, organizing the formulation of quality control measures in the construction process, work instructions for special procedures, and organizing regular quality inspection of each bid.

6. Do a good job in technical disclosure before and during construction, and review the work-start report of the division project.

7. Be responsible for the written technical disclosure to the construction technicians, and supervise and inspect the on-site technical disclosure of the construction technicians.

8. Guide the construction technicians to organize the construction in strict accordance with the design drawings, construction specifications and operating procedures, and control the quality and progress.

9. Establish the project quality management system, coordinate the quality work and the division of responsibilities and interface work of relevant departments, check the implementation of responsibilities of relevant departments, and report the operation of the quality system to the project manager regularly.

10, which releases quality information on behalf of the project department and processes quality information from the owner, supervision department and quality supervision department.

1 1. Lead the project engineering technology, quality and safety, measurement, test and measurement, and approve the test results and reports of measurement, quality inspection and test.

12, responsible for the review and implementation of the project engineering change design, reporting the claim intention and checking the integrity of the claim data.

13, presided over the compilation of completion technical documents, participated in the completion acceptance, organized the summary of construction technology and the writing of academic papers, and was responsible for auditing and reporting to superiors.

14. Complete other tasks assigned by the project manager.

Three. Responsibilities of the General Department:

1, under the leadership of the project manager and chief engineer, responsible for the administration, reception, sanitation and kitchen work of the project department.

2, do a good job in the daily reception of the project department, set up a good image.

3. Do a good job of sending and receiving correspondence documents from the project department, and establish a perfect account for sending and receiving documents.

4, do a good job in the health of the project department, regular or irregular inspection, appraisal.

5. Do a good job in the management of office supplies in the project department, establish a ledger of recipients, and strictly implement the related system between the company and the project department.

6. Do a good job in the kitchen management of the project department to ensure the living supply of the employees of the project department.

7. Be responsible for the safety of the project department.

8, responsible for the project department personnel selection, training and other personnel management.

9, complete other work assigned by the leadership.

10, do a good job in the staff canteen, often change the pattern, and strive to improve the quality of food. Ensure the hot water and boiled water supply for employees to and from work.

1 1, responsible for the accommodation management of project staff, landscaping of staff dormitories and living quarters, and environmental protection of the project.

12, establish and improve the car use system and arrange the car use reasonably.

13, establish and improve the public security system on the construction site, maintain normal working order, strictly take various preventive measures, and supervise the implementation.

IV. Responsibilities of the Finance Department:

1. Establish and improve the corresponding internal financial management system according to laws and regulations, financial accounting system and various rules and regulations of the project management department.

2. Strengthen the basic accounting work, strictly enforce the laws and regulations of implementation of accounting, and ensure the orderly accounting work.

3. Adhere to the principle of good faith.

4. Participate in reviewing the construction budget, urge relevant departments to provide quarterly (or monthly) cost analysis data of the completed project budget, and organize cost profit and loss accounting.

5. Strictly examine and approve the loan and project payment settlement business.

6. Register the general ledger account books in time, establish and improve the project account books, and keep abreast of the project price settlement and project payment.

7. Prepare monthly, quarterly and annual financial statements and final accounts, and provide real and perfect capital information to superiors in a timely manner.

8. Make cost plan, implement cost control, analyze monthly cost expenditure and report to relevant leaders.

9 overall arrangement, rational allocation of funds, optimize the allocation of funds.

10, regularly check the financial revenue and expenditure of each construction team (team) of the project department and the payment of wages for migrant workers, and correct them in time when problems are found.

Verb (abbreviation for verb) The responsibility of the engineering department:

1, implement the national and superior guidelines, policies, systems and methods on quality work, and be fully responsible for the technical management of the project.

2, seriously implement the contract documents issued by the superior and construction drawings, technical specifications, procedures and construction technology management system, and constantly improve their professional quality.

3. Be responsible for the engineering, technology and quality management of the whole bid section, and be responsible for the quality management.

4. Be responsible for establishing the project quality management system and organizing its implementation, and regularly report the operation of the quality system to the project chief engineer.

5, the preparation of project implementation construction organization design and partial project construction organization design, quarterly and monthly construction progress plan, and organize the implementation under the leadership of the chief engineer.

6. Prepare the commencement report of partial projects, make technical disclosure before construction, provide technical guidance during construction, organize the construction drawing review, inspection and construction lofting of individual projects, and cooperate with the chief engineer to monitor the project site.

7, fill in the construction log, often in-depth construction site, understand the construction quality and progress, timely collect and summarize all kinds of quality, safety and progress visa information.

8. Be responsible for the preparation and implementation of new technologies, new processes, new materials and new equipment schemes.

9. Provide all kinds of engineering survey data and information in time, and cooperate with the survey contract department to do a good job in survey.

10, responsible for the preparation of technical documents for completion, collecting, sorting and archiving the works in the industry in strict accordance with relevant regulations, and writing the completion acceptance report, construction technical summary and academic papers.

1 1, responsible for handling and reporting general quality accidents and participating in handling and reporting major quality accidents.

12, responsible for monthly report of project quality, summary table of project settlement and intermediate settlement table.

13, in the process of construction, quality inspection shall be carried out regularly in accordance with relevant codes and standards, problems shall be corrected and handled in time, and major quality problems shall be reported to relevant departments or leaders in time.

14, strengthen the quality control of raw materials, and resolutely prohibit the use of unqualified materials.

15, do a good job of business contact with the owner and supervision department.

16, cooperate with the survey contract department to do a good job in engineering survey.

17, complete the tasks temporarily assigned by the leaders, and cooperate with other departments to do other work.

Vi. Responsibilities of the survey team:

1, under the leadership of the project chief engineer and the engineering department, earnestly study the contract documents, technical specifications, procedures, construction drawings and the construction technology management system issued by the superior, and constantly improve their professional quality.

2. Be familiar with and understand the contract documents, check the design drawings and materials, draw the relevant sample drawings and construction auxiliary drawings of the project, and fill in the original survey data of the project to provide accurate survey data for the project construction.

3. Participate in the design disclosure and handover of survey control piles (points), organize re-survey, establish and encrypt the construction survey control network, and submit it to the owner and supervisor for approval in time.

5, according to the design drawings, organization construction lofting, technical disclosure, familiar with the position of control signs, protect the surveying markers.

6. Be responsible for tracking measurement and positioning measurement of each detail project of bridge and subgrade observation pile construction, so as to achieve accurate calculation and careful lofting to ensure the accuracy of measurement results.

7. According to the arrangement of the engineering department and the needs of engineering construction, the survey and lofting results will be transmitted to the construction teams in written form in time to ensure the smooth progress of on-site construction.

8. Participate in the intermediate inspection and acceptance of the project, organize and archive all kinds of construction lofting data, and participate in the arrangement of completion acceptance data.

9. Take good care of the instruments and equipment, ensure that the instruments are in good condition, and regularly maintain the instruments and equipment.

10, clearly establish the attitude of being responsible for the project, strictly check the size and elevation of the construction drawings, and pay off according to the drawings.

1 1. Complete the tasks temporarily assigned by the leaders.

Seven. Responsibilities of the Contract Department:

1, be familiar with the design drawings, contract documents and technical specifications, carefully study the contract documents, skillfully use the rights conferred by the contract documents, and protect the legitimate interests of the project.

2. Under the leadership of the project manager, work closely with other departments of the project department to do a good job in contract management of the project.

3, according to the contract documents and the provisions of the owner, supervision, complete the monthly engineering measurement and payment work on time.

4, according to the contract documents and the provisions of the owner, supervision, with the cooperation of various departments of the project department, timely submit all kinds of plan statements.

5, responsible for engineering change design work, collect engineering change information, with the cooperation of various departments of the project department, timely and accurately with the owner, supervision and other superior departments to handle all the change procedures.

6, according to the actual situation of engineering construction, timely collect and sort out information, in accordance with the prescribed time limit to the owner to extend the construction period or claim intention, to handle the project extension or claim matters.

7. Prepare and sign various contracts, agreements and letters of responsibility, check the performance of contracts regularly or irregularly, and take corresponding measures in time.

8. Assist the project manager to handle the relationship with the owner and supervisor, and create a good environment for speeding up the withdrawal of project funds.

9. Be responsible for the review of the intermediate statement and the issuance of the red book for project settlement. After the completion of the project, handle the final accounts of the project in time and assist in the compilation of the completion data.

10, complete the task assigned by the leader temporarily.

Eight, security officer responsibilities:

1. Conscientiously implement the relevant laws and regulations on safety production of construction projects, adhere to the policy of "safety first, prevention first", and organize the implementation of the company's various safety production rules and regulations.

2. Participate in the preparation of safety plans and various groups, and have the right to exercise the safety one-vote veto system.

3, cooperate with relevant departments to do a good job in three-level safety education for construction personnel, holiday safety education, guard changing education for each type of work and special type of work training and evidence collection, and put it on record, and improve the safety management account.

4, completes the safety record, safety inspection, supervise the logo.

5, the implementation of safety technical measures in the safety assurance plan, organize and participate in the acceptance of safety facilities, construction electricity and construction machinery;

6. Supervise and inspect the compliance of operators. Organize and participate in safety technical disclosure, control the safety of the whole construction process, and make records;

7, grasp the security dynamics, found the accident seedling and take timely measures to control the hidden dangers of accidents;

8, stop illegal operations, strict safety discipline, when there is a contradiction between safety and production, have the right to stop risky operations;

9. Assist subcontractors in safety control on the construction site and supervise the implementation of corrective and preventive measures;

10, cooperate with the materials department to inspect all kinds of safety supplies and mechanical equipment used on site;

1 1. Assist the safety inspection of superior departments and truthfully report the safety status of the project;

12, responsible for the investigation and analysis of general accidents, put forward handling opinions, assist in handling major industrial injuries and mechanical accidents, and participate in formulating corrective and preventive measures to prevent accidents from happening again.

13, assist the safety inspection of higher authorities and truthfully report the safety status of the project.

14. Participate in helping to control the safety facilities, processes and behaviors with hidden dangers in the project, participate in formulating corrective and preventive measures, and verify the corrective and preventive measures.

15, check the use of safety protection articles, stop all kinds of violations of safety in production, and have the right to command the construction personnel to evacuate the dangerous area in case of emergency, and immediately report to the superior.

16, do a good job in sorting out written materials such as inspection records, and urge the site foreman to do a good job in safety information.

17, review the safety management data of the project department, and analyze and improve the existing site safety common faults.

18, complete other work assigned by the leaders.

Nine, professional engineer job responsibilities:

1. Obey the division of labor, perform the duties of engineers for the projects undertaken, and be responsible for the management of the project quality.

2, familiar with the contract documents, technical specifications, design drawings, in the process of construction, to conduct a comprehensive control of quality and progress, problems arising in the construction should be put forward as required, problems that cannot be solved should be reported in a timely manner, requesting the project chief engineer and project manager to deal with them.

3, responsible for the detailed rules for the implementation of professional engineering management. Organize and guide the site construction, fill in the construction diary, and conduct inspection and supervision.

4. Review the construction plan, scheme, construction organization design and change design suggestions of the construction team, and submit them to the project chief engineer for review. Supervise the implementation of the approved construction scheme, plan and construction organization design.

5. Be responsible for the managed projects, provide survey data and design drawings to the construction team, and make disclosure of pile delivery, technical standards, key technologies and matters needing attention; Supervise lofting and check the plane position and elevation; Supervise the operation process and organize intermediate sampling inspection and partial acceptance; Record key processes and concealed works.

6. Do a good job in the statistics of daily completed quantities and the intermediate acceptance and settlement of actual completed quantities by various construction teams, and cooperate with surveyors to do a good job in measurement and payment.

7. If it is found that the construction team violates the contract and technical specifications and fails to correct it after being discouraged and stopped, it has the right to temporarily stop its work and report to the project manager and chief engineer.

8. Fill in the project diary and various construction records, and be responsible for collecting, sorting and summarizing the quality inspection data, acceptance data, construction charts and completion data of the managed projects.

9. Supervise the construction team to abide by the safety operation rules and have the right to stop the violation of safety operation.

10, regularly check the quality consciousness of the construction team and its quality assurance organization and quality standards.

1 1. Complete other tasks assigned by the leaders.

X. responsibilities of quality inspection engineer:

1, familiar with contract terms, technical specifications, design drawings and "Standard for Quality Inspection and Evaluation of Highway Engineering", and skilled in using various quality inspection equipment.

2. Assist the project chief engineer in project construction quality management, and be responsible for quality accidents in project construction.

3. Assist the project chief engineer to do a good job of technical disclosure before construction, and point out in detail the working procedures of each work, the technical indicators that should be achieved, the key points and difficulties that should be paid attention to, and the preventive measures that should be taken for the work or parts prone to quality problems.

4. Go deep into the construction site, check the implementation of construction procedures, technical specifications and supervision instructions by professional engineers in charge of construction, point out the existing problems and deficiencies, put forward improvement suggestions, and eliminate quality hidden dangers.

5. Check the completed work together with testing engineer, and report to the supervisor for approval after passing the self-inspection. It is forbidden to report unqualified work to the supervisor for approval, and put forward practical and effective remedial measures for unqualified self-inspection.

6, supervise and check the homework class, group, central laboratory, survey team about the construction technical data sorting work. Whether the original measurement records, test reports, visa information and test data submitted to the supervision engineer are complete, accurate and correct. The visa formalities have also been completed.

7. Review the laboratory's analysis, identification and mix ratio of various building materials, concrete strength and other technical indicators. Materials that have not been signed by the supervision engineer cannot be purchased in bulk, and materials that fail to pass the inspection are not allowed to be used.

8, to participate in the project intends to quality and organization of the project quality meeting. Check the key processes of new technologies and new processes adopted in the project implementation.

9. Take responsibility for engineering quality accidents caused by quality inspection omissions and dereliction of duty.

Eleven, librarians job responsibilities:

1, engineering technical data runs through the whole construction process, and should be collected, written and sorted regularly.

2, documenter must start from the construction, foot frequently, hand frequently, mouth frequently comprehensive collection of the whole process of data, starting from the material quality assurance sheet for acceptance statistics, review, came to check and other orderly and systematic records.

3, the quality of technical data must be accurate, complete, timely and clear, in line with national norms and standards.

4, documenters should often go deep into the grass-roots construction site, understand and master the actual progress requirements of the project, prepare the schedule in time, and write carefully.

5, in conjunction with the supervision, design, construction units, and with the on-site technology, quality and safety, material procurement and other departments in a timely manner to summarize all the information, to fulfill the signing procedures, to be correct.

6. After the project is completed, all technical data will be bound into volumes and filed at the time of completion and acceptance.

7, do not careless, omission, neat and clean, clear directory.

8. Manage documents according to the requirements of program documents, so that the classification, numbering, collection, sorting, archiving and borrowing of controlled documents meet the specified requirements.

9. Be responsible for the collection, cataloging and storage of project data, and timely collect project management and control information. Check the completeness of data procedures and the standardization of data collation, feed back unqualified data to the responsible person in time, and make regular rectification.

10, assist the competent engineer to carry out the project standard implementation data work.

1 1. Cooperate with branch companies in information management.

12, responsible for the analysis of engineering data, quality control data, personnel training data and other information, and providing continuous improvement data for the project manager.

Twelve, mechanical equipment responsibilities:

1, according to the production plan, do a good job in the leasing, exit and deployment of mechanical equipment, so that the deployment is reasonable, economical, efficient, safe and accident-free.

2. Make monthly and quarterly maintenance plans for machinery and equipment, and supply spare parts for equipment, so that the intact rate of machinery and equipment can reach over 90%, and spare parts can be supplied in time, which will not affect the needs of construction and production.

3. Be responsible for the lease, accounting and analysis of machinery and equipment, ensure accurate accounting and timely amortization, and provide correct and reliable accounting basis for finance.

4. Establish a mechanical account, be responsible for the accumulation, analysis and sorting of all kinds of original data of mechanical equipment entering the site, and timely and accurately summarize and report all kinds of statistical reports.

5, responsible for the installation of mechanical equipment, temporary water and electricity installation, demolition, and organize the acceptance, safe use, check the operator's implementation of operating procedures at any time, found that the problem should be corrected and handled in time.

6, responsible for the improvement and implementation of the project related mechanical and electrical management measures, responsible for the standardized management of mechanical equipment in civilized construction.