20 13 Andy Lau Nanjing concert venue information

Nanjing Olympic Sports Center Stadium, built in 2005, is the venue for the opening and closing ceremonies of the 10th National Games, track and field and football matches, with a construction area of 1, 363,40 square meters and a capacity of 60,000 people. The main features of the stadium are multi-function, flexibility and versatility, and it can hold many sports events and large-scale performances such as track and field and football. Exquisite design provides the best space scheme, which makes the hyperboloid top structure surpass all stands and ensures that all audience seats have good visual effects. Sports originated from the worship of nature and the celebration of major events. The design inspiration of the stadium comes from the praise of the rainbow in the sky and the blessing of the grand celebration of the beautiful corolla rising in the sky. 1. The two triangular main arches across the east and west are inclined outward, making an angle of 45 degrees with the ground, with a span of 372 meters, making them the largest inclined arches in the world.

2. The hyperboloid circular roof uses the aerodynamic design principle to create a free and dynamic modeling and structural innovation system, just like a corolla rising and dancing in Ran Ran.

3. The perfect combination of the ups and downs of the hyperboloid roof and the ups and downs of the seats in the auditorium creates the best viewing space with both broad vision and roof coverage for every audience.

4. The flat meniscus part in the middle of the roof is covered by a translucent international new lightweight sun panel. It converts the direct light of the sun into diffuse light, which is beneficial to optimize the light environment during movement. It can reduce the shadow of the site, make the audience's illumination uniform, and help improve the quality of TV broadcast.

5. The unique shape and layout of the auditorium on each floor provide an effective wind barrier for the competition venue and a good environment for athletes to create better results here.

6. Each auditorium is designed according to the latest international standards, and each row of seats rises in a parabolic shape, so that all spectators can see the audience without obstacles.

7. The design and materials of the competition venues have adopted the latest standards and technologies in the world, reaching the highest standards in terms of scale, versatility, comfort and quality.

8. Energy conservation and environmental protection design adopts the latest international standards. For example, the glass curtain wall adopts the latest double-layer hollow energy-saving glass, which greatly improves the utilization rate of indoor energy.

9. The barrier-free design adopts the latest international standards. Disabled people can start from the off-site public transportation, and can go directly to the disabled audience from the disabled passages, special ramps and special elevators along the barrier-free transportation system of the Olympic Sports Center. Address: No.222 Jiangdong Middle Road

Take Metro Line 2 and get off at Olympic Sports East Station, and walk 63 meters.

Take 16 1 85 and get off at the east gate of the Olympic Sports Center, and walk 82 meters.

Take buses 134, 160, 170, 57 and 92 and get off at Xincheng Building, and walk for 392 meters.

Take 16 1 road, 57 road and 7 road to Mengdu Street and walk 4 12 meters.