Nanjing Changjiang Urban Architecture Design Co., Ltd. formally established the general contracting management department of cultural tourism project design on 20 17, and its core business is the general contracting business of cultural tourism planning and design. At present, the company has the qualifications of Grade A in construction industry, Grade A in urban planning, Grade B in tourism planning, Grade B in landscape architecture and Grade B in electric power industry (power transmission and transformation engineering), and has gathered professionals in tourism planning, urban planning, architectural design, landscape design, cultural history and other fields. The cultural tourism projects being designed by the company include Nanjing Liuhe Jinniu Lake Wildlife Park Kingdom Project, the town concept planning of Window of the Earth theme park, and the planning and design of Xiaoruijia beautiful countryside in Gaochun District. At the same time, a number of themed amusement and cultural tourism projects will be launched soon.
Legal Representative: Wang Jie.
Date of establishment: 2009- 10-23
Registered capital: 50 million yuan.
Location: Jiangsu Province
Unified social credit code: 91320100694625397p.
Operating conditions: In operation.
Industry: scientific research and technical services
Company Type: Limited by Share Ltd (unlisted)
Staff size: 500-999 people.
Enterprise address:No. Zheng Xue Road 1, Qinhuai District, Nanjing.
Scope: Urban planning and design; Urban traffic planning; Architectural engineering design; Civil air defense engineering design; Electric power engineering design; Road and traffic engineering design; Intelligent design; Landscape design; Interior decoration design; Cultural relics protection projects and renovation design of existing buildings; Engineering supervision; Project management; Engineering cost consultation; Whole process engineering consultation; General contracting of construction projects; Technical consultation of architectural engineering. (Projects subject to approval according to law can only be operated after approval by relevant departments)