Price analysis of pure labor cost for general building decoration in Beijing

Beijing decoration labor cost judgment standard: determine the decoration time price. Judging the material price and labor cost must be based on the current price, not the price at the time of decoration. This is because the price of building materials is extremely unstable. Some materials may be reduced in price in a short time. The public should evaluate the price of building materials according to the current price. It is difficult to estimate the decoration price accurately. The public can estimate the approximate price by asking the decoration company to check the current price according to the decoration level of the house to be purchased. Bian Xiao will introduce the price of pure building decoration in Beijing in detail. Let's have a look!

Price analysis of pure labor force for ordinary building decoration in Beijing

1. Labor cost for meritorious service and demolition -0.4 yuan/building/piece (if it is not carried out at the entrance of Loukou, it is calculated according to the building distance), and it is regarded as the first floor when it is about 20 meters) Note: the first floor is calculated according to 0.5 yuan/building/piece; The second floor is calculated by 0.4 yuan/floor/piece; The building is calculated according to 1.2 yuan/floor/block. Elevator 1 yuan/floor/piece (for example, if you want to move 20 boxes of tiles from the floor to the fifth floor, it should be 40 yuan because it is 20 * 5 * 0.4 = 40. Cost) wall smashing (120mm thick, hollow brick), ceramic tile removal (calculated on the first floor)-10 yuan/grade (including bagging, including "every plus one"), when the elevator is used on the first floor, the wall thickness exceeds 120mm. Note: The removal of ceramic tiles requires the removal of the original ceramic tile cement and the removal to the original ground and wall. 60 pieces/piece of opening tunnel (120mm thick, hollow brick) (sawed with a saw) with wall thickness exceeding multiple of 120mm shall be calculated as labor cost. Demolition of cement baseboard 5 yuan/m composite floor 1 yuan/flat solid wood multi-storey/solid wood floor (without wooden keel) 3 yuan/flat solid wood floor (with wooden keel) Demolition of 5 yuan/flat window (plastic steel, broken bridge aluminum) -50 yuan/piece (destructive demolition) Cutting wall and door edge-10/ m concrete ground beam.

Price analysis of pure labor force for ordinary building decoration in Beijing

II. Labor cost for tile shop pasting and wall tile paving-25 yuan/Ping Description: (Bricks with specifications larger than 200mm * 300mm and smaller than 600MM * 600MM are paved with crosses) 1. Less than 200mm * 300mm-50/ m2, less than 150mm * 150mm-75/ m3, 800MM * 800MM are being paved -30 yuan remarks: each layer of original foundation is paved at 45 degrees, and the pavement is paved with 25 yuan skirting line-10 yuan/. Metered cement floor leveling-65,438+00 yuan/level (the floor of the bathroom needs to be leveled by changing pipes)-one-sided ashing leveling of wall cement or leveling of waterproof layer-65,438+00 yuan/level (the original wall tiles need to be leveled to facilitate tile laying)-red bricks and tiles are laid in the bathtub in 200 yuan.

Price analysis of pure labor force for ordinary building decoration in Beijing

Three, plumbing laying labor costs (water meter, installation costs, etc ... ) is the most unreasonable water fee for a kitchen and a bathroom (including kitchen and sanitary ware renovation (including sanitary ware installation) -600 yuan/suite (including wall air gouging and pressure test of hot and cold water pipes) (in case of a large number of concrete air gouging, the drilling fee for beams and columns will be counted separately). The bathtub needs to be made of red brick, and it is installed separately-100 yuan (if the mobile bathtub doesn't need to be built on the wall, there is no charge). Renovation of main water or toilet requires total water area renovation-100 yuan/set (overall renovation of second-hand house) heat exchange (relocation of PPR pipeline) (heating press)-100 yuan/set (including partial wall planing)

Price analysis of pure labor costs for general building decoration in Beijing [@ 4, strong and weak labor costs (such as water, electricity, meters, installation, etc.) are the most unreasonable and need attention. Two bedrooms, one kitchen and one bathroom, electrician fee -800 yuan/set (including wire, telephone, surround and double-control switch transformation, including rear switch socket and lamp installation). For each additional electrician's expense space (such as bedroom, cloakroom, study and stairs), the LAN line will be increased by 200 yuan/household 100 yuan (calculated by single floor, for example, the jump floor and villa will be increased by 100 yuan), and the single av line laying of projection wiring (hd line +av line) will be increased by 200 yuan/set (including 50 pipe laying). The box will be transformed into a household electric box, and 200 households will be relocated. (If it is a single story, it will cost 100 yuan for each additional story of the villa). (There is no underground pipeline indoors) -200/ set (according to two rooms and one living room). 5. Upper limit of labor cost for wood production (flat roof or plane, room height: within 3m) 200 yuan/unit (one independent area, such as kitchen and dining room, consists of two areas. ) 1, (ceiling) is 3m -50 2 high, (ceiling) is round, arc -50/3, (ceiling) is arched-without doors) (carpentry) a set 1.2m * 2.4m-200 yuan/group 1, (wardrobe. (Wardrobe) cupboard door (flat) -30 yuan /5, (wardrobe) cupboard door (flat) -60 yuan/wardrobe door cover (carpentry)-150 yuan/door seat -50/ plastering. Ring (the price of big circle and small circle remains unchanged) gypsum shed line (line 120-200) (carpentry)-80 yuan/ring (the price of big circle and small circle remains unchanged)-curtain box (carpentry)-root pine wallboard -30/ flat wall insulation -20/ flat curtain rod installation -20 yuan/door collision installation. Dabai Paint shoveled the original white wall manually-1yuan/flat shovel wallpaper. Flat scraping-5 yuan/flat (especially if the area is small and the white area is less than 200, it is calculated as grade 200). Scraping white includes: bandage, plaster, antirust paint, scraping white three times, (scraping white twice. Calculation method of large white area: according to one bedroom = perimeter of bedroom floor * actual height+ceiling area, 1. There is no large white area in the bathroom and kitchen.

2. Column area is not calculated separately.

3. The hole area has not been reduced (including large French windows). 4. Sticking colored paper and plastering with door and window covers is not a separate job.

5. Wall cracks are not treated separately. 6. The forming cost of special gypsum board wall is calculated separately. Oil workers tend to save effort in white, and it is the key to deal with the smoothness of yin and yang angles and white. ) The chalk line gypsum at the corner of Yin and Yang is smooth -2 yuan/Ping (optional) Construction requirements: Before the corner of Yin and Yang on the wall is whitewashed. Shunping keeps a straight line visually. Latex paint (including white frosting) (twice)-the white part of wallpaper needs to be sanded, so the cost will not be reduced. ) Processing with gypsum seam -30/ round wall gypsum fillet (excluding cutting)-. (Optional) Since gypsum leveling must be mixed with white latex, it is unsafe from the environmental point of view. If there is no problem with the quality of wall mortar, it is recommended not to do so. The quality of the wall is poor or requires advanced technology. This wall does not need to be leveled with plaster. )

Price analysis of pure labor force for ordinary building decoration in Beijing

Description of overall leveling of gypsum: 1, the wall or ceiling has no mortar leveling or poor flatness, so it can't be used with white in the case of overall leveling of gypsum. 2. In the advanced technology, the whole wall must be leveled after mortar leveling (the standard is 2m to within 3MM) (acceptance is required before construction. If the foundation elevation is too large, the wall surface needs to be negotiated. Processing method. Ordinary flat window cover transparent oil (oil pot)-65438 yuan/ordinary flat door transparent oil (oil pot). Ordinary flat door cover cleaning oil (oil pot)-100/ white paint, enamel paint and spray paint will increase by 30%. The European series will increase the price by 50% on the original basis. (Working under sandpaper, I feel that paint and saturation are very important) White paint/porcelain paint/spray painting process is more expensive. The engineering quantity is particularly expensive. ) [@] The above is more information about the decoration price of pure buildings in Beijing. For more information, please pay more attention to Tuba Rabbit, which will provide you with more complete, detailed and updated information. .