Does the budget officer have a qualification certificate?

How to get the certificate of budget officer?

Apply for qualification

1, primary (meet one of the following conditions)

<

Does the budget officer have a qualification certificate?

How to get the certificate of budget officer?

Apply for qualification

1, primary (meet one of the following conditions)

(1) Technical secondary school degree or above in this major or related major.

(2) Engaged in professional work for more than 2 years. belong to

2, intermediate (with one of the following conditions)

(1) College degree or above in this major or related major.

(2) Engaged in this occupation for more than 4 years.

(3) Obtain the primary certificate of this occupation and have been engaged in this occupation for more than 2 years.

3. Advanced (meet one of the following conditions)

(1) Bachelor degree or above in this major, engaged in this occupation for more than 2 years.

(2) College degree or above in this major, and have been engaged in this occupation for more than 4 years.

(3) Obtain the intermediate certificate of this occupation and have been engaged in this occupation for more than 3 years.

course

Budget personnel: architectural drawing, architectural structure, construction project quota and budget, and construction technology.

Architect: building mechanics, building materials, building structure, building construction technology.

Inspector: quality accident analysis and construction technology.

Materials officer: building materials and construction technology.

Ii. is the budget officer's card the same as the cost officer's card?

Budgeting and costing are two different jobs, and the certificates are different.

The difference between cost engineer and budget engineer

First of all, the nature of work is different

The budget officer estimates the investment of the project before construction, and the cost officer consults (reviews) the actual cost of the project after the project is completed. Cost engineers can also engage in budget work, but budget engineers cannot engage in cost consultation.

Second, the work unit is different.

Budget personnel generally work in construction enterprises, and cost personnel generally work in cost consulting enterprises.

Third, the certificates are different.

The budget officer is a certificate printed and issued by the Hubei Provincial Construction Department. The cost engineer is a certificate of China Cost Consulting Association (China Price Association) and issued by Hubei Cost Management Station.

Budgeting staff is a training certificate for key positions in the construction industry in Hubei Province, and they must attend the training and pass the examination before issuing certificates. The cost engineer is a national cost engineer qualification certificate, and there is no training requirement.

Iii. What certificate do I need to take to be a budgeter?

You can take the qualification examination of cost engineer.

Conditions for cost engineer to apply:

China people and citizens who abide by the law and meet one of the following conditions may take the qualification examination for cost engineers:

(1) Having been engaged in engineering cost business for 5 years after graduating from engineering cost college; After graduating from engineering or engineering economics, I have been engaged in engineering cost business for 6 years.

(2) Having worked in the engineering cost business for 4 years after graduating from the engineering cost major; After graduating from engineering or engineering economics, he has been engaged in engineering cost business for 5 years.

(three) after obtaining the second bachelor's degree or postgraduate degree in the above major and obtaining the master's degree, he has been engaged in the engineering cost business for 3 years.

(4) Having worked in the engineering cost business for 2 years after obtaining the above professional doctorate.

(3) Does the budget officer have a qualification certificate? Extended reading responsibility:

1, be familiar with national laws, regulations and management regulations on project cost, master professional theoretical knowledge, be familiar with engineering drawings, master project budget quota and relevant policies and regulations, and lay a foundation for correctly compiling and auditing budgets.

2, responsible for the audit of construction drawings, to participate in the blue prints.the design and technical disclosure, according to its records for budget adjustment.

3. Assist leaders in project declaration, organize bidding, examination and approval before commencement and acceptance after completion.

4. After the project is completed and accepted, the final accounts shall be made in time and reported to the factory director for signature.

5. Participate in the procurement of engineering materials and equipment, be responsible for the analysis of engineering materials, check the price difference of materials, collect and master the records of technical changes and material substitution, conduct cost accounting at any time, and provide scientific basis for leadership decision-making.

6, a comprehensive grasp of the terms of the construction contract, in-depth understanding of the construction situation, to lay a good foundation for the final accounts review.

7. After the project is completed, it should be sent to the audit department for audit.

8. Complete the economic analysis of the project cost, and timely file the final accounts of the project.

9, assist in the preparation of infrastructure plans and adjustment plans, understand the implementation of infrastructure plans.

The specific work contents of the construction project budgeter are as follows:

Master design budget and construction budget management first, that is, secondary calculation management. Specifically, prepare and compare the second calculation, and increase or decrease the budget for the received design changes, technical approval documents and materials;

The second is contract control, which plans, drafts and starts the corresponding contract approval process for labor and professional contracting, and evaluates the performance of the contract;

Third, claim management: if the owner fails to perform or improperly performs the obligations stipulated in the contract, thus causing losses to the construction party, the construction party shall claim compensation from the owner and draft the claim documents;

Fourth, the project settlement, according to the completion data of settlement book, determine the final cost of the project.

Must the budget officer have a certificate?

1, the budget officer certificate is the post certificate.

The exam is easy. Some places don't need exams.

2, it is best to have a budget officer's certificate, and now it is called a cost officer.

3. If you require in-depth, you must take the qualification examination, two kinds, 1, cost engineer certificate, 2, cost engineer certificate. Qualification certificate is used to show that you are qualified to issue cost documents on behalf of the unit and has legal effect.

(1) The cost engineer examination is organized by the Construction Committee and unified throughout the country. Previously divided into senior and junior cost engineers, now unified as the national cost engineer. Cost engineers are organized by the Ministry of Construction and the Ministry of Personnel for examination, which is unified throughout the country.

(2) The difference between a cost engineer and a cost engineer is that the cost engineer can only do the design and construction stages: design budget, construction drawing budget, settlement and final accounts. Cost engineers can also do things in the decision-making stage: feasibility study, investment estimation and financial evaluation, which means that cost engineers are one level higher than cost engineers. The specific examination requirements and time can be shortened a lot in China.

4. The conditions are as follows: Anyone who abides by national laws and regulations, abides by professional ethics and meets one of the following conditions can apply for the qualification examination of cost engineers:

(a) professional engineering cost, technical secondary school or above;

(two) other majors, technical secondary school or above, working for one year. The specific grading examination should ask the local cost management department (generally divided into three levels)

5. The budgeters of construction enterprises usually do some budgeting, bidding, cost control and project tracking measurement, but they don't make budgetary estimates at all. The budget estimate was made by the design institute.

Are the certificates of the budget officer and the cost officer the same?

The difference between budget members and cost members is that:

1, with different meanings: the budgeter has two meanings, one refers to the detailed or rough statistics of the most basic expenses such as labor, materials and machinery. Completed by a project, including taxes and profits. Second, there are building budget officers or civil budget officers. Cost engineer refers to a professional who has passed the qualification examination of cost engineer, obtained the qualification certificate of national construction project cost engineer, registered and obtained a professional seal, and engaged in project cost activities.

2. Different policies: On October 20 16 13 10, the executive meeting in the State Council decided to cancel 6 1 professional qualifications on the basis of the cancellation of the first four batches. The qualification of national construction engineering cost engineer ranks among them. The budgeter didn't cancel.

3. Different job responsibilities: The budgeter is mainly responsible for reviewing the construction drawings, participating in the joint review of drawings and technical disclosure, and making budget adjustments according to his own records. Assist leaders in project declaration, organize bidding, examination and approval before construction, and acceptance after completion. Fully grasp the terms of the construction contract, deeply understand the construction situation, and lay a good foundation for the review of final accounts.

The responsibility of the cost engineer is to be familiar with the national laws, regulations and management regulations on project cost, master professional theoretical knowledge, be familiar with engineering drawings, master the project budget quota and relevant policies and regulations, and lay the foundation for the correct preparation and audit of the budget. Responsible for reviewing the construction drawings, participating in the blue prints.the design and technical disclosure, and adjusting the budget according to its records.

ⅵ Do I need to take the budget officer's certificate to be a budget officer? If yes, what conditions are needed to get it?

It is best to have a budget copy certificate, and now call it a cost engineer.

The conditions are as follows: anyone who abides by national laws and regulations, abides by professional ethics and meets one of the following conditions can sign up for the qualification examination of cost engineers: (1) Engineering cost major, technical secondary school or above; (two) other majors, technical secondary school or above, working for one year. The specific grading examination should ask the local cost management department (generally divided into three levels)

ⅶ Excuse me, are the budget officer and the cost officer the same certificate?

The budget officer and the cost officer are not a certificate.

. Cost generally refers to engineering. The budget covers a wider range and also covers costs.

ⅷ How to get the employment certificate of budget officer?

Application conditions:

1. Abide by national laws and regulations and abide by professional ethics.

2. Major in engineering cost, technical secondary school and rights education.

3, other majors, technical secondary school or above, working for one year. The specific grading examination should ask the local cost management department (generally divided into three levels)

The budget officer certificate is also called the cost officer certificate.

The cost engineer examination is organized by the Construction Committee and unified throughout the country. Previously divided into senior and junior cost engineers, now unified as the national cost engineer. Cost engineers are organized by the Ministry of Construction and the Ministry of Personnel for examination, which is unified throughout the country.

The difference between a cost engineer and a cost engineer is that the cost engineer can only do the design and construction stages: design budget, construction drawing budget, settlement and final accounts. Cost engineers can also do things in the decision-making stage: feasibility study, investment estimation and financial evaluation, which means that cost engineers are one level higher than cost engineers.

(8) Does the budget officer have a qualification certificate? Extended reading:

Budgeting personnel need to undergo training and examination, and after passing the examination, they will be issued with certificates with numbers and steel seals and their own seals. The contents of the seal are: name and certificate number.

Budgeters can check their qualifications and certificate numbers through the Internet, and implement the national qualification examination system for construction engineering cost engineers in China. Registered cost engineers are national in nature and have exams every year, but the passing rate is very low every year. The score line is determined according to the overall level of all examiners in that year.