Article 2 On-site acceptance basis
(1) IAAF Runways and Facilities Certification Method
(2) International Federation of Athletics Associations Venue Facilities Manual (the latest edition published by China Athletics Association).
(3) Rules of Track and Field Competition (latest version approved and published by China Athletics Association)
(4) National standards related to track and field synthetic surface.
Article 3 Scope of on-site acceptance
According to the construction standards and use requirements of track and field, the acceptance scope is divided into the following three categories:
(1) Class I track and field venues
1 refers to the newly-built or rebuilt track and field venues for all track and field events, and all the indexes meet the track and field standards of synthetic track specified by IAAF and relevant national building standards (including indoor 200m track and outdoor 400m track).
2. Surface products are approved by China Athletics Association.
(II) Category II track and field venues
Refers to the newly built and rebuilt track and field venues used to hold some track and field events, and all the indexes of these venues meet the standards of synthetic track and field venues stipulated by IAAF.
(3) Grade III track and field venues
Refers to the newly built or rebuilt track and field ground with synthetic surface for carrying out track and field sports and other sports activities, and its perimeter distance is not the standard stipulated by IAAF.
Article 4 On-site acceptance procedures
(1) acceptance content
1, Class I track and field venues:
(1) Review of site design drawings;
(2) The physical and chemical properties of the synthetic surface layer were detected.
(3) On-site surface inspection (thickness, flatness, dotted line, etc. );
Track and field at the second, second and third levels:
Physical and chemical properties test of (1) synthetic pavement
(2) On-site surface inspection (thickness, flatness, dotted line, etc. );
Note: 1. Before on-site construction, the design drawings shall be submitted to China Athletics Association for review; 2. The physical and chemical properties of synthetic surface should be tested in the testing laboratory designated by China Athletics Association. 3. According to the requirements of track and field competition rules, some track and field events must be laid as thickened areas.
(2) Acceptance documents and materials
To apply for acceptance of different types of track and field events, different acceptance documents shall be submitted respectively:
1, acceptance application form (see attachment 1)
2. Synthetic surface track and field construction design and completion drawings;
3. Test report on physical and chemical performance indicators of synthetic runway issued by the designated laboratory of China Athletics Association (see Annex 6).
4. Confirmation letter signed and sealed by the owner and the contractor, confirming that the test block for inspection is on-site sampling. (Annex 8)
5. Summary of the construction of man-made track and field:
6. Marking report of certified marking division of China Athletics Association.
7, synthetic surface track and field positioning line mapping report;
8. Self-inspection report (flatness, thickness, slope, etc.). ) track and field engineering synthetic runway;
9, foundation layer completion acceptance report (including center point, center distance, inner radius, slope, flatness);
10, supervision report of synthetic runway track and field engineering;
1 1, a copy of the qualification certificate of the design unit (Grade C or above);
12, copy of qualification certificate of surveying and mapping unit (Grade C or above);
13, foundation engineering supervision report;
14, other materials that need to be submitted.
The above 14 acceptance documents shall be submitted to apply for the acceptance of the first-class track and field. The above 1- 10*** 10 shall be submitted to apply for the acceptance of secondary track and field. The above-mentioned 1-5***5 documents shall be submitted when applying for the acceptance of the third-level track and field.
(four) pay the acceptance fee.
The acceptance fee shall be submitted together with the acceptance documents.
Non-member unit: the acceptance fee for the first-class track and field is RMB 30,000; The secondary track and field is 654.38 yuan+800,000 yuan; The third-level track and field is 654.38 yuan+500,000 yuan.
Member unit: the acceptance fee for the first-class track and field is 20,000 yuan; The secondary track and field is 654.38 yuan+200,000 yuan; The third-level track and field is 6.5438 yuan +0.00 million yuan.
Indoor 200-meter standard track and field venues are charged according to the second-class venue charging standard. Acceptance fees include expert pre-trial acceptance materials and on-site acceptance travel expenses, accommodation fees, local transportation fees, instrument use fees, labor subsidies, etc.
(five) review the acceptance documents
The acceptance team of China Athletics Association first pre-examines the relevant acceptance materials submitted by the applicant. The main pre-trial contents include: track and field layout, infrastructure, pavement, slope, drainage and other designs. In principle, track and field ground designed as synthetic surface of cement foundation is not acceptable. After passing the pre-qualification, the personnel of the acceptance team will conduct on-site acceptance.
(six) the contents and requirements of on-site inspection and acceptance.
1. The layout and functions of the venues should meet the requirements for holding established track and field events;
2. The flatness and thickness of the synthetic runway should meet the requirements of IAAF for track and field;
3. The appearance of the synthetic runway is free of bubbles, cracks or delamination, and the joints must be straight without obvious traces;
4. The bonding between the synthetic runway and the base should be firm, without degumming and concave-convex phenomenon;
5. The color of the synthetic runway should be uniform and consistent, meeting the design requirements;
6. The marking line is straight and even, with no imaginary edge;
7. Runway width and lane width, height of protruding edge, number of lanes and straights, specifications of field events, dimensions of embedded facilities, control points and dotted lines of synthetic runway, etc. , should meet the requirements stipulated in the competition rules;
See Annexes 2, 3, 4 and 5 for the contents of on-site inspection and acceptance.
(7) On-site acceptance review
According to the pre-trial situation and the results of on-site acceptance, an acceptance appraisal meeting attended by the on-site construction unit, the construction unit and the acceptance team of China Athletics Association was held. The acceptance team evaluated the synthetic surface track and field site on the spot and put forward rectification suggestions for the existing site.
(8) Procedures for issuing site acceptance certificates
1. The qualified track and field venues of Class I, Class II and Class III will be issued with certificates and corresponding plaques by the China Athletics Association.
2. On-site acceptance of the site with problems should be rectified within a time limit. After the rectification, the construction unit and the construction unit jointly submit a rectification report with photos and materials to the Chinese Athletics Association, which will issue a certificate after passing the examination. For the site whose use is affected by many rectification contents, it is necessary to conduct on-site acceptance again and pay an acceptance fee of 5,000 yuan at the same time.
3. Contents of the certificate:
The first-class track and field certificate includes: site construction unit (or general contractor), construction unit, site name and category (complete project), synthetic runway length and radius, China synthetic runway authorization number, runway product name, certificate number, issuing date and seal of issuing authority.
The second-level track and field certificate includes: site construction unit (or general contractor), construction unit, site name and category (except).
The third-level track and field certificate includes: the site construction unit (or general contractor), the construction unit, the name and category of the site (unable to host the domestic 1-7 official competition stipulated in the track and field competition rules of China Athletics Association), the certification number of China synthetic runway (excluding this item for non-certified products), the certificate number, the date of issuance and the seal of the issuing authority.
4. The Chinese Athletics Association will publish the names of track and field venues, construction units, construction units and testing personnel that have passed the acceptance of the Chinese Athletics Association on the official website of the Chinese Athletics Association and related newspapers and periodicals.
Article 5 Test contents of physical and chemical performance indexes of synthetic runway surface layer
According to the latest IAAF and national standards (GB/T14833-2011).
Article 6 Qualified venues can accept competitions.
Track and field events sponsored by China Athletics Association include the following categories:
(1) National Games, National City Games
(2) International and planned domestic track and field competitions sponsored by China Athletics Association.
(3) National Workers' Games, Farmers' Games, Ethnic Minority Games, All-Army Games, National University Games, National Middle School Students' Games and National Sports University Games.
(4) Track and field competitions licensed or approved by China Athletics Association.
(five) track and field competitions held by sports associations of all provinces, autonomous regions, municipalities directly under the central government, cities under separate state planning, and sports colleges directly under the central government, and track and field invitational competitions held by the above-mentioned units.
(6) Local and municipal track and field competitions.
(7) County (city) level and below track and field competitions.
A track and field venue that has obtained the first-class track and field venue acceptance certificate can undertake track and field competitions of all track and field events from (1) to (7), and the sports achievements created in this venue above the second level will be recognized.
Track and field venues that have obtained the acceptance certificate of the second-class track and field venues can undertake track and field competitions in some track and field events from (2) to (7), and the sports achievements created in this venue will be recognized.
The track and field that has obtained the acceptance certificate of the third-level track and field can undertake the informal competition of the unit, and the sports achievements created by the competition on this track and field will not be recognized.
Note: Class I track and field venues that undertake the national comprehensive games must have sub-venues, and the surface layer of the sub-venues should be the same as the main ground layer.
Article 7 Composition of the acceptance team
The acceptance team is composed of acceptance personnel selected by China Athletics Association, and the acceptance personnel shall wear the acceptance certificate issued by China Athletics Association. The first-level track and field acceptance group consists of 4 people, and the second-and third-level track and field acceptance groups consist of 2 people.
Article 8 For details of the management measures for acceptance personnel, please refer to the Management Measures for On-site Acceptance Personnel of China Athletics Association.
Article 9 The Chinese Athletics Association shall be responsible for the interpretation of these Measures.
Article 10 These Measures shall come into force as of the date of promulgation.
See Annex 7 for the bank account and contact information of China Athletics Association.