Construction safety production management adheres to the principle of safety first and prevention first, implements a safety production management system of enterprise responsibility, industry management, state supervision and mass supervision, and establishes and improves the responsibility system for safety production and the system of prevention and treatment by groups. Article 4 The construction administrative departments of the people's governments at or above the county level shall be responsible for the supervision and management of the quality of construction projects and the industrial management of construction safety production within their respective administrative areas. Fifth, encourage the use of advanced science and technology and management methods to improve the quality of construction projects and ensure the safety of construction production. Article 6 Construction projects that should be subject to tender according to law, including engineering survey, design, construction, supervision and procurement of important equipment and materials related to engineering construction, must be subject to tender. Chapter II Quality Management of Construction Projects Article 7 The responsibility system shall be implemented in the quality management of construction projects.
Units engaged in construction activities are responsible for the construction behavior they implement and the construction achievements they provide. The legal representative and the person directly responsible of the unit engaged in construction activities shall bear lifelong responsibility for the quality of the basic works and the main structure of the construction project handled within its reasonable service life. Article 8 The construction unit shall be responsible for the project quality management, determine the survey, design and construction units with corresponding qualification grades according to law, sign contracts, organize the project construction and ensure the project quality. Construction projects that should be supervised must be supervised according to law.
In accordance with the relevant provisions of the state and the project limit determined by the construction administrative department of the State Council, it is necessary to apply for a construction permit according to law, and the construction administrative department shall conduct a procedural review of the construction drawing design documents submitted by the construction unit; If the examination is unqualified, no construction permit shall be issued. Article 9 Before applying for a construction permit, the construction unit shall go through the quality supervision procedures at the construction project quality supervision institution in accordance with the regulations on classification management. Article 10 After receiving the completion report of a construction project, the construction unit shall, under the supervision of the construction administrative department, organize relevant units such as survey, design, construction and supervision to carry out the completion acceptance according to the construction drawings, construction acceptance specifications and engineering quality inspection and evaluation standards.
After the completion of the construction project, the construction unit must carry out the project cost audit and handle the completion settlement procedures in time. Eleventh survey units and design units shall establish a quality assurance system, quality responsibility system and survey and design files, and be responsible for the quality of their survey and design.
The survey and design documents shall comply with the provisions of relevant laws and regulations, the quality and safety standards of construction projects, the technical specifications for survey and design of construction projects, and the provisions of the construction project contract. The conclusions of the survey documents shall be evaluated accurately, the data shall be true and reliable, and the design documents shall meet the specified design requirements; Design units shall not designate manufacturers and suppliers for the building materials, building components and equipment selected in the design documents. Twelfth construction engineering design to implement the registration qualification system. Design documents must be reviewed and signed by qualified designers, and the signer shall be responsible for the signed documents.
Without the consent of the original design unit, no unit or individual may change the design documents. Thirteenth design units should participate in the joint review of design drawings, responsible for design technical disclosure; Participate in the quality acceptance of the foundation, main structure (including concealed works) and completion of construction projects; Participate in the analysis of engineering quality accidents and put forward relevant technical solutions.
For projects with new technologies and new structures, the design unit shall send design representatives to the construction site to solve technical problems and other matters in construction in time. Fourteenth construction enterprises should contract construction projects according to law, establish and improve the quality assurance system, implement the project quality responsibility system, establish engineering technical files, and be responsible for the construction quality of the project. Fifteenth construction enterprises must organize construction in accordance with the construction organization design, engineering design drawings, construction specifications and technical standards, and shall not lower the quality standards of the project, violate the construction procedures or cut corners.
When a major quality accident occurs in the construction of a construction enterprise, it must report to the construction administrative department in time and take corresponding measures. Article 16 The project manager and professional managers are responsible for construction, budget, quality, safety and materials. Should accept the professional knowledge of construction, construction laws and regulations training, after passing the examination and obtaining the post qualification certificate, before taking up the post. Seventeenth engineering supervision units shall bear the supervision responsibility for the quality of construction projects under their supervision. In the process of supervision, violations of construction norms and technical standards are found, which must be stopped, and relevant responsible units are instructed to take measures to correct them.
Engineering supervision units shall not resort to deceit to reduce the quality of the project.
The supervision business shall not be transferred.