Anjiang Expressway starts at Yuejiazhai, Xiao Min Town, jiangkou county, connecting Hangrui Expressway and ends at Weng 'an Yinzhan, which is connected with Guiweng Expressway. Estimated investment1600.304 billion yuan, total length 143.297Km, two-way four lanes.
Anjiang expressway is the east of the third horizontal line of the "678" network of expressway skeleton highway planning in this province. The project spans the central and eastern part of Guizhou Province, and is the main artery connecting Tongren, Zunyi, Qiandongnan and Qiannan. It starts from Yuejiazhai, Xiao Min Town, jiangkou county, connects with Hangrui Expressway under construction, ends at Yinzhan, Weng 'an, and then connects with Guiyang (An) urn.
The total length of the main line of the project is 140.42 1Km, the total length of the Qing Yu branch line is 2.876Km, and the total length of the line is 143.297Km, which passes through tongren city (including1.98km and 80.67Km in jiangkou county). In Shiqian County). 32. 187Km (including 29.304km) in yuqing county, Zunyi City; Main line); 7.9Km in huangping county, Qiandongnan Prefecture; It is 22.54Km in Weng 'an County, Qiannan Prefecture. There are 34 164.05m/98 bridges in the whole line, including 8,286.4m/9 extra-large bridges, accounting for 23.84% of the total length of the line. There are 27,929 m/23 tunnels in the whole line, including 6,687.5 m/2 extra-long tunnels, accounting for 19.49% of the total length of the main line. The intersection 1 1 is set up on the main line, and the intersection 1 is set up on the Qing Yu branch line.
It is planned to be completed and opened to traffic by the end of 20 15. After completion, it will help to improve the road network structure and investment environment in central and eastern Guizhou, strengthen the traffic and economic ties between provinces along the route, and realize the direct connection between central and eastern Guizhou and provincial capital cities, which is of great significance to promoting the great economic and social development along the route.
main unit
Construction unit: Guizhou Zhongjiao Anjiang expressway Co., Ltd.
Contractors: China Communications Second Highway Engineering Bureau Co., Ltd. and China Communications Second Highway Survey and Design Institute Co., Ltd.
Supervisors: Wuhan Datong Road and Bridge Engineering Consulting and Supervision Co., Ltd., Luoyang Luxing Highway Engineering Supervision Co., Ltd., Weifang Huawei Highway Engineering Supervision Office and Henan Yulu Engineering Technology Development Co., Ltd.
High speed profile
Expressway exit
Exit distance
Lianxiang expressway
The above is the introduction of Anjiang Expressway by Construction Network. For more information about expressways, please pay attention to the architectural knowledge column of Zhong Da Consulting.
For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.