Enqian expressway introduced?

En-Qian Expressway (code: G50) is a expressway connecting Enshi Prefecture in Hubei Province and Qianjiang District in Chongqing, with a total length of 128km, 201,and 20 14 and 12, with four lanes in both directions. Zhong Da Consulting introduced Qian 'en Expressway as follows:

Enqian expressway —— A Brief Introduction

According to the data of CBI Construction Network, Enqian Expressway refers to expressway from Enshi, Hubei Province to Qianjiang, Chongqing, and is the connecting line between Shanghai-Chongqing Expressway (G50) and Baomao Expressway (G65). It is divided into Enshi Prefecture of Hubei Province and Qianjiang District of Chongqing City. The total length of this project is about 128km, including 107.353km in Hubei and 20km in Chongqing. The landform is a hilly region with moderate structural erosion, with an altitude of 450- 1200m. The total length of the whole bridge is 30.554KM/85 (including 8552M/ 12 bridges, 2 14 12M/66 bridges and 590M/7 bridges), accounting for 23.1%of the total length of the line; The total length of the tunnel is 25.6 12KM/24 (including extra-long tunnel 12834M/3, long tunnel 5286M/4, medium tunnel 3703M/5 and short tunnel 3789M/ 12), accounting for12 of the total length of the line. The estimated construction period is 4 years.

Enqian expressway Enshi Section, Hubei Province

Hubei section starts from Ji Ye depression near the west side of Xuanen Longdong Reservoir in Enshi Prefecture, connects with Jean expressway and ends at Shimenkan at the junction of Xianfeng, Hubei and Chongqing provinces. The total length of the line is 109. 12km, the design speed is 80km/h, the subgrade width is 24.5m, and the separated subgrade width is 12.25m ... expressway standard construction in four-lane mountainous area. The estimated total investment of the project is 6.353 billion yuan. It is planned to set up six interchanges: Tanjiaba, Jiaoyuan, Tongziying, Xiaoguan, Xianfeng and Huangnitang.

Expressway, Guizhou —— Qianjiang section of Chongqing

The total length of the inner section of Qianjiang District of En-Qian Expressway is 20.049km, and the total length of the bridge is 3.2 12KM, accounting for 14. 1% of the total length of the route. The total length of the tunnel is 12.26KM, accounting for 53.9% of the total length of the line. Jiangxi and Qianjiang East Interchange, 1 separated interchange, 1 maintenance work area. The main control points are Qianjiang East Interchange, Bamianshan Tunnel, Shangtoushan Tunnel, Apengjiang Bridge and Qianjiang West Interchange. The total estimated investment of Qian (Jiang) en (Shi) expressway is 83/kloc-0.50 billion yuan, and the average cost per kilometer is 63.055 million yuan. Among them, the total investment of Qianjiang section is expected to be 2.383 billion yuan, and the average cost per kilometer is 65.438+0.066 billion yuan. The project adopts two-way four-lane expressway standard, with a design speed of 80 kilometers per hour.

Enqian expressway-Construction Course

● In July, 2004, China Communications Second Hospital completed the pre-feasibility study of this project.

● In August 2004, Enshi Development and Reform Commission and State Transportation Bureau submitted the document to the Provincial Development and Reform Commission and the Provincial Communications Department.

● In July 2005, the feasibility study of Enqian expressway Project was completed.

On June 27th, 2005, Hubei Provincial Development and Reform Commission, Communications Department, leaders and experts from Provincial Water Resources Department, Environmental Protection Bureau, Forestry Department and Land and Resources Department co-chaired an expert consultation meeting on Enqian expressway Project. At the meeting, the Expert Group Opinions of Hubei Enshi-Chongqing expressway Hubei Environmental Engineering Consultation Meeting was formed. Eight special reports have been completed, including Remote Sensing Report of Engineering Geology, Engineering Geological Investigation Report of Engineering Feasibility Study Stage, Environmental Impact Assessment Report, Soil and Water Conservation Outline and Report, Geological Disaster Risk Assessment Report of Construction Land, Zhalv Mineral Resources Adjustment Report, Cultural Relics Investigation and Exploration Report and Earthquake Safety Assessment Report, all of which have passed the review and won the national level.

● 201010/0 On the morning of October 28th, at the signing and unveiling ceremony of the project investment and financing of Hubei Communications Investment Co., Ltd., Yang Tianran, Governor of Enshi, and Long Chuanhua, General Manager of Hubei Communications Investment Co., Ltd. signed the project investment agreement from Enshi, Hubei Province to Xuanen to Xianfeng (Hubei-Chongqing boundary) in expressway, Qianjiang, Chongqing.

●20 10 12 17, the groundbreaking ceremony of Qianjiang section of Qian-en Expressway was held at the base of Chongqing expressway Southeast Operation Branch in Keshan Township, Qianjiang District, marking the official start of Qianjiang section of Qian-en Expressway.

● On the morning of 20101218, the groundbreaking ceremony for Hubei Section was held in Wang Jiabao, Jiaoyuan Town, Xuanen County. Su Xiaoyun, member of the Standing Committee of Hubei Provincial Party Committee and Minister of United Front Work Department, attended the ceremony.

● 2011On March 6th, the land requisition work in expressway of Enqian officially started in Bainiba Village, Jiaoyuan Town, Xuanen County.

● On 20th11June 10, the entity investigation was completed in Enshi section of En-Qian Expressway.

The above is the introduction of Zhong Da Consulting to Enqian expressway. For more information about expressways, please pay attention to the architectural knowledge column of Zhong Da Consulting.

For more exclusive information about the construction industry, please pay attention to the micro-signal of the construction network in real time.

For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.