The structure is calculated by tons, and the price is determined according to the difficulty. A factory building with a small span has a content of about 28-30 kilograms per square meter and a price of about 6800 per ton. Probably, it depends on the drawings and specific things, because you can't quote without specific things, such as construction difficulty, area, payment method, payment progress and so on. These are all factors that affect the cost. You can only set the price with that specific thing. Now, if you are here, you'd better choose enterprises in Jiangsu to make steel structures and grid structures. There are many steel structure companies in Xuzhou, Jiangsu, with low prices, good quality and qualifications.
This is my opinion. I just make steel structures.
Www.sxthgjg.com Shaoxing Steel Structure Company;