Construction Technology of Beijing Shenghua Yuyang Building Decoration in Jinan Fan Fei Impression Decoration Office

1. Foundation engineering.

According to the design drawings, demolish the wall, remove the old veneer and re-plan the space.

2. Hydropower projects.

Hydropower engineering materials enter the site, the ground, wall and top surface are slotted, water supply pipes are laid, circuit wiring is carried out, water supply is electrified for detection, and wall surface is repaired.

3. Masonry engineering.

Ceramic tiles, cement and other materials come into play, kitchen and bathroom are waterproof, ceramic wall tiles are laid, and maintenance is completed.

4. Woodworking engineering.

Wood engineering materials enter the site, ceiling wall keel laying, panel installation, door cover window cover, wall decoration construction, wood fixed furniture.

5. Decoration works.

Paint and coating enter the site, wood components and furniture are painted, and the top surface and wall base are plastered, coated, cleaned and maintained.

6. Complete the project.

Installation of electrical equipment, lamps and sanitary ware, laying of ground materials, overall cleaning and maintenance, and completion acceptance.