Yongning expressway —— Brief Introduction
Yong 'an-Ninghua (Fujian-Jiangxi border) expressway is a part of Quanzhou-Nanning horizontal line of National expressway Network, and also the western section of the third horizontal line of Fujian's "three verticals and four horizontals" expressway network. It starts in Yong 'an City and ends in Wu Liting, Huaitu Township, Ninghua (Fujian-Jiangxi border), connecting Shicheng, Jiangxi (Fujian-Jiangxi border) under construction to expressway, Ji 'an. Total length 123.5km (plus 3 1. 17km interchange connecting line), the whole line is built according to the standard of two-way and four-lane expressway, with design speed 100km/h and subgrade width of 26m, with Jishan, Cao Yuan, Mingxi, Songkou, Liu Qing and Ninghua. The total length of this project is 123.5km, and the second-class highway connecting line is 29km. Design two-way four lanes, speed 100km. The total investment of the project is estimated to be 96,543.80 billion yuan. There are 7 interchanges on the main line, namely Jishan (hub), Yong 'an West, Mingxi, Songkou, Liu Qing, Ninghua and Shibi, with 2 pairs of service areas and 1 pair of parking areas.
Yongning expressway-Influence
The highway starts from Yong 'an Jishan Junction Interchange, connects Quansan Expressway and Wu Yong Expressway, passes through Yong 'an Caoyuan Town, Huda Town, Mingxi Hufang Town, Qingliu County Julin, Dalukou, Chengguan, Ninghua South, Cuijiang and Shibi, ends at Ninghua Huaitu Wu Liting (Fujian-Jiangxi border) and connects Jiangxi Shicheng (Fujian-Jiangxi border) to Ji 'an Expressway. It is a part of Quanzhou-Nanning national expressway Quannan expressway. It goes to Hengyang and Yongzhou in Hunan, passes through Guilin and Liuzhou in Guangxi, and finally reaches Nanning. It is an important transportation corridor connecting South China, East China and the economic zone on the west side of the Taiwan Strait, and the most convenient sea passage connecting western Fujian and the southeast coast.
Yongning expressway-Project Progress
Yongning expressway Project was approved by the National Development and Reform Commission in June 2007, approved by the National Development and Reform Commission in June 4, 2008, started construction in June 2008 and was completed and opened to traffic in June 2008.
Yongning expressway-Opening Date
Yongning (Yong 'an-Ninghua) expressway was officially opened to traffic at 0: 00 on February 20th116th, and the provincial government agreed with the opinions of the Provincial Department of Transportation, the Provincial Department of Finance and the Provincial Price Bureau on the vehicle toll charging standard of Yongning expressway. When Yongning Expressway was opened to traffic, vehicle tolls were levied at the same time.
It is reported that Yongning expressway starts from the interchange of Jishan Hub in Yong 'an City, connects expressway, Shen Chang, passes through Yong 'an City, Mingxi County, Qingliu County and Ninghua County, ends in Wu Liting at the junction of Fujian and Jiangxi, and connects with Shishi to Jishan expressway in Jiangxi Province. The main line length of the route is 123.5km, and the tie line length is 3 1. 17km. The main line is built according to the four-lane expressway standard, with the designed driving speed of 100km/h, with 7 interchanges and 2 pairs of service areas along the line.
Yongning expressway-charging standard
The rate of all kinds of toll vehicles in Yongning expressway is 0.55 yuan per kilometer for small cars, among which,
The charging standard for Class I vehicles is 0.55 yuan/km/vehicle.
The charging standard for Class II vehicles is 1. 10 yuan/km/vehicle.
The charging standard for Class III vehicles is 1.54/ km/vehicle.
The charging standard for four types of vehicles is 1.65 yuan/km/vehicle.
The charging standard for five types of vehicles is 1.925 yuan/km/vehicle.
The classification and charging coefficient of toll vehicles shall be implemented according to the current classification standard and charging coefficient of expressway in our province. The tax reduction and exemption standards for trucks and international standard container trucks traveling on expressway in our province, and the tax reduction and exemption standards for ETC users (including non-cash payment users) vehicles shall be implemented in accordance with relevant regulations. The charging period is fifteen years from the date of project opening and operation.
The above is the introduction of Yimao Zhong Da Consulting to Yongning Expressway. For more information about expressways, please pay attention to the architectural knowledge column of Zhong Da Consulting.
For more exclusive information about the construction industry, please pay attention to the micro-signal of the construction network in real time.
For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.