(1) Overview of construction preparation
Must meet the owner's specifications and requirements in project management, data production and other aspects. Therefore, after admission, one of the first tasks is to accept the owner's disclosure in management, technology and data, and establish corresponding management mechanism and data control system according to the owner's requirements, so as to ensure smoother future work and more harmonious relationship with the owner and other construction units. Because our company has established its own quality system documents according to ISO900 1 standard in construction management and information production management, and is used to running according to its own management mode, therefore, in order to meet the requirements of the owner, relevant personnel must be properly trained. According to the contents of the tender, there are usually relevant personnel such as design team, quality inspection team, planning and statistics team, material team and construction team who receive training. The training mode is to participate in relevant meetings convened by the owner, give operational guidance to the documented management mode, and invite relevant personnel of the owner to evaluate it. Resolutely replace the management and technical personnel who do not adapt to the owner's management mode. In addition, the specific arrangements for providing services should be made clear to the owners in advance.
(two) the preparation of detailed construction schedule and other planning information
According to the owner's requirements, submit the following plans and materials within the specified time:
1, construction progress schedule;
2, material procurement and sample inspection plan;
3. Data management scheme;
4, special subdivisional work construction process and construction method;
5, the specific construction plan and other kinds of planning information.
According to the bidding documents and other specific requirements of the owner, on the basis of engineering quantity calculation, the advanced project management software is adopted to prepare the construction plan agreed with the owner, and the cooperation of electromechanical construction is considered when preparing the plan, forming a "construction cooperation schedule"; The material group shall prepare the material and equipment procurement plan according to the "Project Quality Plan" and the format required by the owner. The documenter shall prepare the data management document of this project according to the company system documents and the requirements of the owner, so as to ensure that it becomes an integral part of the owner's data system; Construction organization design studies and tests the special sub-projects to form documented construction techniques and methods, and at the same time, according to the requirements of construction progress, formulate detailed concrete construction plans.
(3) Procurement and confirmation of materials and equipment
According to the material procurement and sample inspection plan approved by the owner, the material group will organize relevant materials and equipment samples (or data) to be submitted to the owner, design unit and supervision unit for confirmation within the time specified by the owner. The specifications and standards of material samples will be in duplicate according to the requirements of the owner. One sample of the materials (or materials) after approval is sealed, and the other is made by our company as a procurement model.