Guangyuan South Station, built at 1967, is an important marshalling station on the baoji-chengdu railway, located at Lizhou West Road, Hexi Street, Lizhou District, Guangyuan City, Sichuan Province. Postal code: 628000. It belongs to Guangyuan Locomotive Depot of Chengdu Railway Bureau and is now a first-class station.
General situation of station
Guangyuan South Station, built at 1967, is an important marshalling station on the baoji-chengdu railway, located at Lizhou West Road, Hexi Street, Lizhou District, Guangyuan City, Sichuan Province. Postal code: 628000.
Radio station location
Guangyuan South Station is 360 kilometers away from Baoji Station on Baocheng Line and 309 kilometers away from Chengdu Railway Station. It's 0/57km away from Bazhong Station of Guangba Line/KLOC-.
The development of history
1958, baoji-chengdu railway was completed and opened to traffic.
1967, Guangyuan south station, a new marshalling station connected with Luoguang branch line, was completed and put into use, and it was under the jurisdiction of Chengdu Railway Branch of Chengdu Railway Bureau.
On July 1975 and 1, baoji-chengdu railway completed the electrification transformation and became the first electrified railway in China.
198 1, the construction of Luoguang branch line stopped after it was built to Puji Station in wangcang county, and it was renamed Wangguang Railway, which was still organized by Guangyuan South Station.
In 2005, the railway sub-bureau was abolished and the direct management of stations and sections was implemented. Guangyuan South Station belongs to Guangyuan Locomotive Depot of Chengdu Railway Bureau, and is now a first-class station.
On June 5438+February 3, 20091day, Wangguang Railway was merged into Guangba (Guangyuan-Bazhong) Railway, and construction officially started.
20111216, the trial operation of Guangzhou-Pakistan Railway started, and Guangyuan South Station was still used as a marshalling station connecting with Baocheng Line.
With the speed-up of trains and the completion and operation of the Daba Railway, passenger trains from Chengdu to Bazhong no longer travel through the Guangba Line, and the passenger service at Guangyuan South Station is also suspended.
From July, 20 15 to February, 20 15, Guangyuan Station was closed for renovation, and the stopped trains in Guangyuan were changed to Guangyuan South Station and Zhao Hua Station, and Guangyuan South Station resumed passenger service. However, with the reopening of Guangyuan Station after renovation, Guangyuan South Station stopped its passenger service.
Freight business: handling the delivery of road goods for the whole vehicle.
Commercial Status of Guangyuan South Station
Passenger transport: no passenger transport business.
Freight: handle the delivery of the whole vehicle.
Guangyuan south station
For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.