Green building design planning should be clear about the project positioning, determine the overall objectives and sub-objectives of green building design, the corresponding technical strategies, cost and benefit analysis, and prepare the green building design scheme.
The green building design scheme shall include the following contents:
1 Preliminary investigation;
2. Project positioning and target analysis;
3. Conceptual scheme and implementation strategy analysis of green design:
4. Technical and economic feasibility analysis.
The preliminary investigation shall include site selection analysis, market analysis and social environment analysis, and meet the following requirements:
The site analysis of 1 should include the geographical location of the project, site ecological environment, site climate environment, topography, surrounding environment, road traffic and municipal infrastructure planning conditions, etc.
2 market research should include the functional requirements, market demand, use mode and technical conditions of the construction project;
Social environment analysis should include regional resources, humanistic environment and quality of life, regional economic level and development space, opinions and suggestions from the surrounding public, and incentive policies for green buildings in the region.
Project positioning and target analysis shall include the following contents:
1 Analyze the characteristics and requirements of the project;
2. Determine the corresponding levels or requirements of the current national and Jiangsu green building evaluation standards;
3. Determine the appropriate overall goal and sub-goal, feasible technical route and corresponding index requirements.
Green design concept scheme and implementation strategy analysis should meet the following requirements:
1 Follow the principle of giving priority to passive measures and optimizing active measures;
2. Reasonable selection of appropriate technologies and integration technologies;
3. Choose efficient building products, equipment and green building materials;
If the existing conditions cannot meet the goal of green building, adjustment, balance and compensation measures can be taken.
The technical and economic feasibility analysis shall include the following contents:
Technical and economic feasibility analysis of 1;
2. Analysis of environmental and social benefits;
3 Risk analysis and assessment.