The first phase of Shenzhen Outer Ring Expressway was officially opened to traffic on February 29 18, which will open the east-west traffic artery in northern Shenzhen, relieve the traffic pressure at border ports such as Jihe Expressway and Nanping Expressway, and make the traffic from Longgang to Baoan, Guangming and Longhua more convenient.
Shenzhen Outer Ring Expressway is 93km long, including 76km in Shenzhen and17km in Dongguan. The first phase of this project starts from Guangzhou-Shenzhen Expressway along the river, reaches Baoan, Guangming, Longhua and Longgang in the east, and ends in the second phase, with a line length of 5 1km, including the section from Longcheng to Pingping 15.06km. On the same day, the main line of the Dongguan section of the first phase of the Outer Ring Expressway was also opened. Citizens can save more than half an hour's drive from Longgang to Dongguan and realize the construction of one-hour living circle in Dongguan and Shenzhen.
Extended data
Expressway, the outer ring of Shenzhen, runs through the east and north of Shenzhen and the southeast of Dongguan, and is connected with ten expressway cities including Guangzhou-Shenzhen, Nanguang, Long Da, Meiguan, Boshen, Yan Hui and Shenshan respectively, and crosses with eight first-class highways such as 107 National Highway, Shen Dong Highway, 205 National Highway and Shenshan Highway, as well as a number of urban roads and all the longitudinal port-dredging passages in Shenzhen, and then with expressway in the Pearl River Delta.
As a three-ring east-west fast connecting channel in Shenzhen, the Outer Ring Expressway is of great significance for establishing and perfecting the pattern of fast channels outside the original special zone. It can effectively communicate the main skeleton of north and south expressway, and give full play to the overall benefits of expressway network.
Longgang Government Online-Shenzhen Outer Ring Expressway Phase I was officially opened to traffic.