The estuary is connected with the old street in Vietnam and is a national port. Xinhe Expressway is the first expressway in Yunnan to reach the country.
The whole line of Xinhe expressway is designed as a four-lane expressway, with subgrade width of 24.5m, designed load of more than 20 vehicles, trailer-120, and designed traffic volume of 26 108 vehicles/day (passenger cars). There are two interchanges in Nanping and Beishan.
On May 8, 2005, construction of Xinhe expressway started, and it was completed and opened to traffic on February 26, 2008.
The above is the introduction of CBI Zhong Da Consulting to Xinhe Expressway. For more information about expressways, please pay attention to the architectural knowledge column of Zhong Da Consulting.
For more exclusive information about the construction industry, please pay attention to the micro-signal of the construction network in real time.
For more information about bid writing and improving the winning rate, click on the bottom customer service for free consultation.