XX Town People's Government:
XX Village is located in the southeast of XX Town, XX District, XXXkm away from the XX Town Government, and there are XXXX villagers in the area under its jurisdiction, which are inhabited by Han people. At present, the economy is mainly developed by planting rice, corn, cassava, aquatic plants, litchi, longan, fast-growing eucalyptus with sugar orange and breeding chickens, ducks and pigs.
In recent years, our village has made effective use of various natural conditions, responded to various national policies to benefit farmers, actively developed the rural economy, and made great progress in planting and aquaculture. But all the roads in my village are still loess roads. When it rains, it is muddy and the road conditions are extremely poor.
Due to the merger of schools in recent years, there is only one primary school in our village at present. Many children have to walk more than 3 kilometers to school, but because of the bad road conditions, parents don't trust their children to go to school by bike, so most of them walk. If the walking time is too long, many unpredictable things may happen on the road, which really worries parents. In addition, with the development needs, many machines are unable or unwilling to enter the village, and agricultural products cannot be transported safely and quickly, which seriously hinders the development of rural construction.
Therefore, it is an urgent task to harden the road in our village.
In order to avoid potential safety hazards on children's way to school as much as possible, effectively solve the problem of children's difficulty in going to school, speed up the pace of poverty alleviation of residents in our village, and promote the rapid development of economic construction in our village, our village Committee decided to build the road from XX to XX first after on-the-spot investigation. (See Annex: Schematic Diagram of Road Construction in XX Village) The total length of this section of road is XXXkm, covering XXX production teams in XX and XX villages, with a direct beneficiary population of XXX and an indirect beneficiary population of more than XXX.
The construction of Mao subgrade began in XXX. Subgrade width XXm-XXm, average subgrade XXXm. It is necessary to build a bridge with Xm treaty or a drainage channel with XXX cubic meters of flow for flood control. The villagers responded enthusiastically to the fund-raising and it is now in full swing. Please give me hope for the project construction.
No, please indicate.
XX villagers' committee
XXX year, XX month, XX day