Introduction to expressway, Xia Quan?

Quanxia Expressway is the first expressway in Fujian Province, starting from Xifu in Quanzhou and ending at Guanlintou in Xiamen, with a total length of 8 1.9km. Zhong Da consulted CBI Construction Network and obtained the relevant information of Xia Quan Expressway:

Quanzhou to Xiamen expressway is the first expressway in Fujian Province. Quanzhou, Jinjiang, Shuitou, Maxiang, Tongan and Xiamen 6 toll stations. The total length of the highway is 8 1.898km, with a design budget of 2.786 billion yuan, starting from Xifu in Quanzhou and ending at Guanlintou in Xiamen, with a total length of 8 1.9km. At the end of 2007, Xia Quan expressway was expanded and the main body was completed and opened to traffic on September 2, 20 10. After the expansion, Xia Quan expressway was widened from four lanes to eight lanes, announcing the new look of the first two-way eight-lane expressway in Fujian Province.

Planning programming

As the first expressway in Fujian Province, expressway, Xia Quan is a part of the 12 national trunk line system planned by the Ministry of Communications, and was listed as the first batch of key highway construction projects by the Ministry of Communications during the Eighth Five-Year Plan period. The total length of the highway is 8 1.898 km, and the design budget is 2.786 billion yuan, starting from Xifu in Quanzhou and ending at Guanlintou in Xiamen.

The whole line shall be constructed according to the technical standard of highway engineering JTJ0 1-88 issued by the Ministry. The roadbed width is 26 meters, and the roadway width is 2×7.5 meters. It is designed according to the fully enclosed two-way four-lane expressway standard. The designed driving speed is 1.20km/h, and the designed capacity is 64,000 standard cars/day.

Quanzhou-Xiamen expressway is the first expressway project in Fujian Province to be built with World Bank loans. Through international competitive bidding, the construction unit was selected fairly, justly and openly. In strict accordance with the requirements of World Bank loan projects, a three-level supervision organization system was established by adopting Fidyk clause and Sino-foreign joint supervision mode. In the national completion acceptance, the overall quality of the project was rated as excellent.

Due to special reasons such as topography, the Chengzhou Bridge, Xun Mei Bridge, Dapingshan Tunnel, Sucuo Tunnel and Shantou Tunnel in Quanxia section are separated in the same direction, that is, the four lanes that were originally connected together are separated into two lanes. After the separation, the two lanes on the left are automobile lanes and the two lanes on the right are large lanes, and the speed limit of the tunnel section is increased from the original 80 km/h to 100.

work progress

Quanxia Expressway started construction in September, 1994, officially opened to traffic in February, 1997, 15, and started charging in February, 1997, Quanzhou, Jinjiang, Shuitou, Maxiang, Tongan, September.

1997 65438+February 15, expressway, Xia Quan was opened to traffic, and it was officially put into operation on February 20th of the same year. The completed Xia Quan expressway has a total length of 8 1.898km, four lanes in both directions and a designed driving speed of1.20km/h. There are six interchanges in Quanzhou, Jinjiang, Shuitou, Maxiang, Tongan and Xiamen, and there is a comprehensive service area in the park, which has relatively perfect traffic engineering facilities such as toll collection, monitoring, lighting and safety. In addition, two connecting lines will be built along the whole line, namely, the connecting line from Niu Shan to Diandian is 5.9 km, and the connecting line from Hotan to Jimei is 6. 17 km.

Expressway, Xia Quan is one of the trunk highways in Fujian Province. In order to change the rapid growth and saturation of traffic volume in this section, Xia Quan expressway began to expand in 2008. After the expansion and opening to traffic, the daily maximum capacity of this expressway will increase from 50,000 vehicles to 654.38+10,000 vehicles. In addition, there is a Chidian Interchange between Quanzhou (Xifu) Interchange and Jinjiang (Niu Shan) Interchange, which is located next to Gufu Village, Gaocuo Village and Xizhai Village in Chidian Town. The total length of the connecting line and ramp leading to the interchange is 1.25km, with 14 crossings, 9 entrances and 5 exits.

The above is the introduction of Zhong Da Consulting to Xia Quan Expressway. For more information about expressways, please pay attention to the architectural knowledge column of Zhong Da Consulting.