1, power generation equipment
Power generation equipment of Shandong Guodian Feixian Power Plant: 2 domestic 600MW supercritical condensing coal-fired generating units.
2. Installed capacity
The planned total installed capacity of Guodian Feixian Power Plant in Shandong Province is 7.2 million kilowatts.
The overall planned installed capacity of Feixian Power Plant is 7200MW, and it is planned and built according to the scale of the largest thermal power plant in Asia. Two domestic 600MW supercritical condensing coal-fired generating units (currently under construction) will be installed in Phase I, two 1 1,000 MW supercritical condensing coal-fired generating units will be installed in Phase II, and four 1 1,000 MW supercritical condensing coal-fired generating units will be installed in Phase III. The installed capacity of 2× 1000 MW units in the first phase is planned to be put into production in 2007, and the 2× 1000 MW units in the second phase are planned to be put into production in 2009. When all units are completed, it will be the largest thermal power plant in Asia and the largest thermal power base in China.
It is understood that Guodian Feixian Power Plant is jointly funded by China Guodian Corporation, Shandong Luneng Development Group Co., Ltd. and Linyi Investment Co., Ltd., with a total investment of 49 1 billion yuan, which is the largest project invested by the state in Linyi after the founding of the People's Republic of China. It is estimated that the first phase of the project will be completed and put into operation in 2007. The long-term planning of the power plant project is 8 thermal power generating units with a total investment of 35 billion yuan and a total installed capacity of 7.2 million kWh, which will become the largest thermal power plant in Asia. A few days ago, Shandong Power Construction Company No.1 and No.2 are making every effort to complete power generation as soon as possible.
According to Shi Peizhen, general manager of Guodian Feixian Power Generation Co., Ltd., the first phase of the project consists of two 600,000 (kW) supercritical generating units. After the two units were put into operation in 2007, they can generate more than 6 billion kWh of electricity every year, which can not only meet the needs of local economic development, but also promote the development of the province's industrial economy and contribute to the development of the province.