Power outage time: 165438+ 10/7: 00 to 17: 00.
Reason and scope of power outage: Power outage in non-core distribution network reconstruction project: South 16th Street, Ma Kewei Commercial Building, Fourth Hospital standby power supply, North 15th Street, North 16th Street and other areas.
Tel: 84662592
Power outage line: 220kV Haxi Substation 10kV Wanggang Line.
Power outage time: 165438+ 10/7 05: 00 to 12: 00.
Reason and scope of power outage: Hada Village, temporary railway power supply and tax school are out of power due to non-core distribution network reconstruction project.
Tel: 84662474
Power outage lines: 66kV positive transformer 10kV steel plant line and Wushang transformer 10kV Shimao A line.
Power outage time: 1 16:00 10/0/7: 00.
Reason and scope of power outage: Yinhe Community and Shimao Phase I Four Districts suffered power outage due to non-core distribution network reconstruction project.
Tel: 88 1 10264
Power outage lines: 66kV Xinsongpu Substation 10kV Jiangbei Line and Sugar Factory Line.
Power outage time: 10/7 19: 00 to 15: 00.
Reason and scope of power outage: residents of Huacheng Plastic Factory, Shipyard Peking University, Shipyard, Songhua River Shipping Office and Niudian due to the transformation project of distribution network in non-core area; Power outages occurred in areas such as Songpu residents, Dalai Street residents, 249 residents, lighthouse fund-raising building shipyard 630 residents, Niudian residents, shipyard Peking University residents, improved seed factory residents, brick and tile residents, Guangxin residents, Taiyangsheng No.2 Team, Dongming No.1 Team, shipyard, Songhua River shipping residents, simple house residents, sugar factory residents, Jieneng Thermal Power and Songpu Irrigation Station.
Tel: 87 125530