The latest supervision entrustment contract general edition

Party A: _ _ _ _ _ _ _ _ _ _ _ _

Party B: _ _ _ _ _ _ _ _ _ _ _

Party A entrusts Party B to perform: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. The total cost of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Party B accepts the entrustment of Party A and signs this contract.

General conditions of contract

Article 1 The supervision basis of Party A and Party B is _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Article 2 Party A and Party B shall abide by this contract and carry out supervision work according to this contract.

Article 3 Party A is the organizer of the project construction, responsible for fund raising, land acquisition and demolition, and coordinating the relationship with the local area during the project construction, and fully responsible for the construction benefits of the project by the state.

Entrusted by Party A, Party B, as the supervision unit of this project, shall carry out supervision work in accordance with the provisions of this contract, exercise the power entrusted by Party A, and be responsible to Party A. ..

Article 4 The scope and contents of the project supervision referred to in this contract can be found in the service scope and contents in Annex B. ..

Article 5 The supervision fees and payment methods referred to in this contract are detailed in Annex D. ..

Article 6 During the execution of the contract, all contacts between the parties to the contract shall be subject to the written notice. Special circumstances can be notified orally first, and then supplemented by written notice. The relevant documents signed by both parties are supplementary documents to this contract. Letters, faxes and emails confirmed by both parties are an integral part of this contract and have the effect of this contract. Specific provisions (representative, place, method, etc.). The contact information of both parties is specified in the special terms and conditions.

Article 7 Commencement, Completion and Alteration of this Contract

7. 1 This contract shall come into effect immediately after all valid signatures and seals stipulated in this contract are completed.

7.2 The supervision unit shall start the service within the time limit specified in the special terms and conditions of this contract.

7.3 The supervision unit shall complete the service within the time limit agreed in the special terms and conditions of this contract.

7.4 If the situation changes and the contract needs to be changed, it can only be established with the written consent of both parties. Therefore, suggestions made by one party need to be sent to the other party for proper consideration.

7.5 If this contract needs to be extended (force majeure, etc.). ), Party A and Party B shall sign a supplementary contract or explain in advance in the special terms and conditions.

7.6 After the signing of this contract, when the national laws, regulations and policies change, both parties to the contract can make adjustments through consultation and agree in the special terms.

Article 8 Rights and Responsibilities of Party A

8. 1 Party A shall supervise and inspect Party B's work according to the supervision contract.

8.2 If Party A thinks that Party B's poor performance in performing the contract will seriously affect the project progress, Party A has the right to request the replacement of Party B's key personnel until the contract is terminated. If Party A requests to terminate the contract, it shall notify Party B. When the notice reaches Party B, the contract will be terminated. If Party B has any objection, it may request the people's court or arbitration institution to confirm the validity of the contract.

8.3 In case of major changes in the project duration, quality, cost, etc., it shall be finalized by Party A and handled according to the basic construction procedures stipulated by the state.

8.4 Party A supports Party B's work and ensures the unity of Party B's duties and powers under this contract. Party A shall provide Party B with the specified equipment, facilities and materials on time according to Appendix C. ..

8.5 Party A shall provide Party B with the contract texts, materials, drawings and data required for the supervision work stipulated in this contract. At the same time, the method, number of copies, recycling and confidentiality should be clearly stipulated in the special terms and conditions.

8.6 Party A is responsible for coordinating the external conditions of the project and its relationship with the local government.

8.7 Party A shall make a decision on the reports and documents submitted by Party B that need Party A's decision within the time limit agreed by both parties in the Special Terms and Conditions.

8.8 Party A shall pay the supervision fee to Party B on time according to Appendix D. ..

Article 9 Rights and Responsibilities of Party B

9. 1 Party B has the rights stipulated in the contract and undertakes all corresponding responsibilities.

9.2 Party B must have the skills, prudence and diligence required to perform this contract, and must complete all its duties according to the professional standards of the supervisor.

9.3 In the process of supervision, if the supervision unit needs to hire other experts for consultation or assistance, the expenses incurred within the scope of supervision service responsibility shall be borne by Party B; If the supervision service responsibility is exceeded, the expenses incurred shall be borne by Party A after obtaining the written consent of Party A. ..

9.4 Party B shall bring the designated equipment, materials and facilities on time according to Appendix C. The specific use agreement is stipulated in Appendix C..

9.5 Party B must dispatch the supervision personnel and project supervision institutions required for supervision work according to Appendix E ... The qualifications and service conditions of its main personnel must be reviewed and approved by Party A, and Party A shall not refuse without reason. Party A agrees to the project supervision organization proposed by Party B according to the supervision objectives, and determines the chief supervision engineer.

9.6 Supervision shall be carried out by the personnel specified in this contract within the prescribed time limit. In order to ensure the effective implementation of supervision, Party B may make reasonable adjustments within this period. If field personnel are replaced, they shall be replaced by personnel with the same skills, among which the replacement of main supervisors shall be subject to the consent of Party A, and the field supervisors stationed by Party B shall be continuous and stable to ensure the normal supervision work.

9.7 Party B has veto power over the quality of this supervision project, and has the right to issue payment vouchers, start, stop, rework and resume work.

9.8 The remuneration charged by Party B to Party A is its only remuneration for this contract. Party B and its personnel shall not accept other allowances, rewards and indirect payments related to this contract or its obligations.

9.9 In the process of supervision, Party B has the obligation of confidentiality, and shall not disclose the secrets declared by Party A, nor the secrets provided and declared by the design and contracting units.

Article 10 Mediation and arbitration

During the execution of the contract, if there is any dispute between Party A and Party B, both parties shall first fully negotiate to solve the dispute on the principle of mutual understanding, trust, equality and mutual benefit. If negotiation fails, either party may apply to the competent supervision department for mediation; If mediation fails, either party may request arbitration according to law. In the process of mediation and arbitration, both parties shall ensure the normal construction of the project.

Article 11 breach of contract

If the contract is terminated due to Party A's reasons, Party A shall notify Party B at least two months in advance, and bear the liability for breach of contract and pay the agreed compensation fees.

If the contract is terminated due to Party B's reasons, Party B shall notify Party A at least two months in advance, and bear the liability for breach of contract and pay the agreed compensation fees.

If Party A or Party B fails to reply within fifteen days after receiving the notice of termination of the contract, the contract shall be deemed to be terminated.

Compensation for breach of contract or other breach of contract shall be specifically agreed by both parties in the special terms and conditions.

The termination of the contract does not affect the validity of the settlement and liquidation clauses in the contract, nor does it affect the right of the parties to claim compensation for losses.

Article 12 Party A may reward and punish Party B according to its supervision work. The specific content shall be agreed by both parties in the special terms and conditions.

Article 13 For matters not covered in this contract, both parties shall negotiate separately and sign supplementary documents as an integral part of this contract.

Special terms of the contract

In view of the characteristics and actual needs of this project, Party A and Party B agree to sign the following special terms and conditions as a supplement to the general terms and conditions of this contract. In case of any inconsistency between the General Terms and Conditions, the Special Terms and Conditions shall prevail. The specific terms are as follows:

Article 5 supplement

Additional services: If Party A entrusts Party B to complete tasks beyond the scope of this contract, Party A shall sign another entrustment contract. If Party A or the contracted construction unit obstructs or delays the service, thus increasing the workload and duration of the service, Party B shall inform Party A of this situation and the possible impact, and Party A shall increase the extra service fee.

Article 6 supplement

Contact information of both parties: the important issue is the letter, and the general issue is telephone or oral, but it must be recorded. The meeting shall be subject to the minutes.

Contact person: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Location: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Tel: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Article 7-2 Supplement