Simple engineering labor service contract

Do you know the contract? How to write the format of the labor contract? The following is the "Simple Engineering Labor Contract" compiled by me for your reference only. Welcome to read it.

Labor Contract for Simple Works (I) Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B: _ _ _ _ _ _ _ _ _ _ _

According to the Contract Law of People's Republic of China (PRC), relevant national laws, regulations and company documents, Party A and Party B, following the principles of equality, voluntariness, fairness and good faith, reached an agreement on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Sign this contract.

Article 1 General situation of the project

Project name: _ _ _ _ _ _ _

Project location: _ _ _ _ _ _ _ _ _ _ _

Article 2 Scope of project contracting

___________________________________

Article 3 Construction period

1. Planned commencement date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

2. Duration of major nodes: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

3. Party B shall unconditionally implement Party A's schedule (including the newly adjusted schedule). Excerpt from the model essay on construction labor contract!

Article 4 Engineering quality standards

The project quality within the scope of the contracted project must reach _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Article 5 Composition and Interpretation Order of Contract Documents

The documents constituting this contract and the priority interpretation order are as follows:

1. This contract;

2. Annexes to this contract;

3. Bidding documents;

4. Project construction drawings and current national or industry standards and specifications;

Note: The above documents should complement each other. If there is any ambiguity or inconsistency in the contract, it shall be interpreted in the above order. Can't explain clearly, on the premise of not affecting the normal construction progress of the project, solved by both parties through consultation.

Article 6 Standards and Specifications

Standards and specifications applicable to this contract: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Article 7 Responsibilities and Obligations of Party A

1. Responsible for formulating all management objectives in a unified way, organizing the preparation of construction plans and material consumption plans, and controlling, supervising, inspecting and accepting the project quality, construction period, safe production, civilized construction, measurement and testing.

2. Responsible for working contact with the owner, supervision, design and relevant departments, and coordinating the working relationship on site.

3. According to the engineering situation, Party B needs to increase or decrease the construction personnel to meet the needs of construction and production. Those who are poor in construction quality, poor in technology, disobedient to orders and violate the law and discipline will be retired.

4. Provide construction machinery and equipment and turnover materials supplied by Party A in time. Excerpt from the model essay on construction labor contract!

5. Pay Party B labor remuneration according to this contract.

6. Coordinate and solve the temporary living facilities, water use and _ _ _ _ _ _ _ expenses of Party B's construction personnel;

7. Assist Party B to handle the entry and exit certificates of site construction personnel, and the expenses shall be borne by Party B. ..

Article 8 Responsibilities and Obligations of Party B

1. Comply with national policies, laws and regulations; Abide by the relevant rules and regulations of the owner and Party A's enterprise, and do a good job in safety, civilized construction, environment and occupational health and safety, labor protection, etc.

2. Carefully organize the construction in strict accordance with the design drawings, construction acceptance specifications, relevant technical requirements and construction organization design to ensure that the project quality reaches the agreed standards, and be responsible to Party A for the project quality within the scope of the labor service contract; According to the plan requirements of the owner or Party A (including the adjusted plan), reasonably organize and scientifically arrange the operation plan, and invest enough manpower and material resources to ensure the construction period; Take responsibility for quality repair, construction delay and various fines.

3. Management personnel and safety personnel (certified) should be in place according to the requirements and commitments in the tender documents. Skilled workers must hold relevant certificates according to national regulations, and technicians must have professional skills operation certificates, with a certificate-holding rate of _ _%. Special types of work must have a special operation certificate, and the certificate-holding rate reaches _ _%.

4. Obey the supervision, inspection and management of Party A and the owner; Accept the management of quality, progress, technology, safe production, civilized construction, environmental protection, etc. by Party A and the relevant personnel of the owner: accept Party A to check the storage and use of its equipment and materials and the valid certificates and certificates of its operators at any time;

5. Do a good job in the protection of finished products of buildings, structures, underground pipelines and completed projects around the construction site. If the damage is caused by Party B's responsibility, Party B shall bear all economic losses and various fines caused thereby:

6. Stack materials, machines and tools according to the unified planning of Party A; Properly keep and reasonably use the machines and tools, turnover materials and other facilities provided or leased by Party A to Party B;

7. Sign a labor contract with each migrant worker according to national policies and regulations, and pay the wages of migrant workers according to the terms stipulated in the contract (the wages of migrant workers are recorded monthly), and bear the disputes caused by the inadequacy of this work or the punishment and responsibility consequences of relevant local administrative departments;

8. Provide necessary labor protection and safety protection articles for construction personnel (such as safety helmet, safety belt, work clothes, gloves and other related protective articles);

9. Requirements to enter the site construction personnel have good ideological quality, good health, skilled technology and other conditions; /kloc-minors under the age of 0/8, the elderly over the age of 55 and the sick and disabled are not allowed to enter; It is strictly forbidden to use illegal personnel, and Party B shall bear the responsibilities and consequences caused by using the above unqualified personnel.

10. When Party A's funds are not in place temporarily and the owner cannot pay the project payment on time, Party B shall not affect the normal construction or gather people to make trouble to show his understanding of Party A. ..

Article 9 Environmental protection, safe production and civilized construction

1. Party A focuses on organizing the education of Party B's construction personnel on safety production, civilized construction, environmental protection and relevant company systems; Supervise and monitor the implementation of Party B's related work according to national laws and regulations and relevant company rules and regulations, so as to make its system run effectively.

2. Party B shall abide by the management regulations on safety production in engineering construction and carry out construction in strict accordance with safety construction standards; Strengthen the safety education of field operators; Seriously implement safety measures and take necessary safety protection measures to eliminate hidden dangers of accidents and ensure safe production; Accept the supervision and inspection carried out by safety inspectors according to law at any time. If an accident is caused by ineffective safety measures or illegal operation, all responsibilities, consequences and economic expenses shall be borne by myself.

In case of any safety accident, Party B shall immediately report to relevant departments of Party A in accordance with relevant regulations, and handle the accident in accordance with relevant national laws.

3. Party B shall strictly implement the management regulations of the competent construction department and relevant departments of environmental protection, fire protection and health on the construction site, so as to achieve civilized construction; Ensure that the construction site is clean and orderly, conform to the relevant regulations and requirements of civilized construction, maintain the good corporate image of Party A, and bear the losses and fines caused by violating relevant regulations.

Strengthen site management, take all appropriate measures to protect the internal and external environment of the site and limit noise or other pollution caused by construction operations; Avoid causing damage and obstruction to the property of the public and third parties.

Article 10 Supply and management of materials and equipment

1. The turnover materials provided by Party A to Party B shall be adjusted and extracted according to the needs of the project plan and provided to Party B..

2. Party B shall properly keep and reasonably use the materials and equipment supplied by Party A (including receiving, keeping, loading and unloading, returning to the warehouse, handling relevant formalities, and stacking according to the site designated by Party A); In case of loss or damage due to improper storage and use, Party B shall pay compensation according to the price at the time of collection.

3. Give Party B a fixed amount of materials according to the budget, and Party B shall use the materials reasonably and pay attention to saving. If the use of materials exceeds the budgeted amount, Party B shall bear the cost of the excess; The material saving part shall be divided by Party A and Party B in the proportion of _ _ _ _ _ _.

Article 11 Contract Method, Price and Content

1. Contract method and unit price

2. The contract price includes:

The contract price includes all kinds of risks of Party B during the construction period, wages of construction personnel and deployment fees: small machinery fees; Secondary transportation of various materials on site; Natural climate affects unforeseen working day expenses such as water cut, power cut and waiting for materials; Including the collection, loading and unloading, storage, storage and return of reusable materials; Expenses for labor protection articles (safety helmet, safety belt, gloves, etc.). ); Erection and removal of safety protection facilities (safety net, protective railing, protective shed, etc.). );

Civilized construction costs (including temporary labor for on-site inspections by superior departments); Cooperate with survey and setting out, material test, electrician, mechanical equipment maintenance and installation and disassembly within the scope of contracted projects; Labor costs of measures taken to prevent general natural disasters; 3. The unit price of this contract is the total price, which will not be adjusted or changed due to other factors during the execution of the contract.

Article 12 Methods of settlement and payment

1. On 25th of each month, Party A shall settle the labor contract fee according to the actual workload completed by Party B (or according to the project progress node), and settle it according to the contract price on 5th of each month, and submit it to the finance department of Party A as the basis for paying the labor contract fee.

2. Party A does not prepay Party B's living expenses, but pays the labor contract fee on a monthly basis (or according to the project progress node), and the payment time is _ _ _ _% of the settlement amount of last month after the owner pays. Pay _ _ _ _ _ _% of the settlement amount after the completion of the contracted project (the settlement payment amount shall be subject to the amount after deducting the labor management fee).

3. In the monthly contract fee settlement, Party B shall deduct _ _ _ _ _% of the labor service management fee payable to Party A's labor service company.

Article 13 Construction acceptance

1. Party B shall organize the construction according to the quality standards agreed in this contract to ensure the construction quality. After the construction is completed, Party B shall submit the self-inspection report to Party A in time to inform the acceptance. Party A shall promptly organize relevant departments to conduct preliminary acceptance of Party B's construction achievements, and enter the next working procedure after passing the acceptance; When the acceptance results show that Party B's construction quality is unqualified, Party B shall be responsible for free repair, without extending the construction period, and bear the relevant losses caused to Party A from this.

When the project is completed and accepted, Party B shall repair the quality defects of the project proposed by the owner, supervisor and other interested parties free of charge, and bear the relevant losses of Party A, without lightening Party B's responsibilities because it has been accepted by Party A in advance.

2. Party B shall cooperate with Party A in the preliminary acceptance of its work and the completion acceptance of the project; When Party A or a third party on the construction site must cooperate with Party B, Party B shall cooperate according to Party A's instructions. (The cost of cooperation with third parties shall be negotiated separately)

Article 14 Project Warranty

1. Warranty scope and duration: _ _ _ _ _ _ _

2. During the warranty period, after receiving the maintenance notice, Party B shall send personnel to carry out maintenance according to the content and time required by Party A.. If Party B fails to carry out maintenance as required by Party A, Party A may entrust other units or personnel to carry out maintenance, and the expenses shall be borne by Party B.. ..

Article 15 Insurance

1. The person in charge of Party B must take out accident insurance for the personnel engaged in dangerous operations, and take out insurance for the life and property of its personnel and construction machinery and equipment at the construction site and pay the insurance premium.

When the insured accident happens, both parties have the responsibility to take necessary measures to reduce the loss.

Article 16 Disputes

1. During the performance of this contract, if there is any dispute between Party A and Party B, it can be settled through negotiation; Otherwise, both parties shall settle it in the labor arbitration department or the people's court in the place where the contract is signed.

2. After the dispute occurs, both parties shall continue to perform the contract, maintain the continuity of work and protect the finished work results, unless the following circumstances occur:

2. 1 The contract cannot be performed due to unilateral breach, and both parties agree to terminate the contract;

2.2 Mediation requires to stop the contract work, which is accepted by both parties;

2.3 The arbitration institution requests to stop the contract work;

2.4 The court requested to stop the contract work.

Article 17 Contract performance bond

1. Party B shall pay a performance bond of RMB to Party A. ..

2. The contents of the performance bond shall include the bid-winning approval stipulated in this contract and the commitment conditions in the bidding documents, such as: time limit for a project, quality, safety, environmental protection, civilized construction, the number of personnel in place during the peak construction period, the number of personnel in busy farming season, farmers' wage payment, and compliance with laws and regulations.

If the above requirements cannot be met, a certain amount shall be deducted from the performance bond; If Party A breaches the contract seriously or suffers irreparable losses, the security deposit will be totally confiscated and the consequences caused to Party A will be compensated.

3. After the completion of this project, if Party B completes it according to the contents of the contract signed by both parties, and it meets the requirements stipulated in this contract after acceptance by the relevant departments, Party A will return the performance bond (without interest) to Party B within one month.

Article 18 Force Majeure

1. The standard of force majeure shall be subject to the contract signed by Party A and the owner. When there is no corresponding standard in the contract signed between Party A and the owner, the regulations of the state or local government shall be implemented.

2. After the force majeure event occurs, Party B shall immediately notify Party A's project manager, and take measures quickly within its power to minimize the loss, and Party A shall assist Party B to take measures.

3. The working hours delayed due to force majeure events will be postponed.

4. If force majeure occurs after one party delays the performance of the contract, the delaying party shall not be exempted from the corresponding responsibilities.

Article 19 Termination of the Contract

1. If the contract cannot be performed due to force majeure, or the project is stopped or delayed due to one party's breach of contract or the owner's reasons, the contract can be terminated.

2. If the contract is terminated due to force majeure or the owner's reasons, Party B will properly protect and hand over the completed project and surplus materials and equipment, and evacuate the construction site as required; Party A shall pay the labor remuneration for the completed work as agreed in the contract.

Article 20 Termination of the Contract

Both parties perform all obligations under this contract; Labor remuneration has been paid; After Party B delivers the operating results of the contracted project to Party A and passes the completion acceptance; This contract shall be terminated when the quality guarantee period expires and there are no quality problems.

Article 21 number of contract copies

This contract is signed on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Article 22 Supplementary Provisions

__________________________________________

Article 23 This contract comes into effect.

This contract shall come into effect after both parties agree.

Party A (seal): Party B (seal): Party A (seal): Party B (seal): Party B.

Signing time: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Contract signing place: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Labor Contract for Simple Works (II) Project Contractor: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Labor Subcontractor: _ _ _ _ _ _ _ _ _ _ _ _

According to the Contract Law of People's Republic of China (PRC) and the Construction Law of People's Republic of China (PRC).

Relevant laws and administrative regulations follow the principles of equality, voluntariness, fairness, honesty and credibility. Whereas _ _ _ _ (hereinafter referred to as "the Employer") has signed a construction contract with the project contractor.

General contracting contract or professional contracting (subcontracting) contract (hereinafter referred to as "general contracting (subcontracting) contract"), both parties reach an agreement on labor subcontracting through consultation and conclude this contract.

1, qualification of labor subcontractor

Qualification certificate number: _ _ _ _ _ _ _

Issuing Authority: _ _ _ _ _ _ _ _ _ _ _

Professional qualification and grade: _ _ _ _ _ _ _

Review time and validity period: _ _ _ _ _ _ _

2. The object of labor subcontracting and the content of providing labor services

Project name: _ _ _ _ _ _ _ _ _ _ _

Project location: _ _ _ _ _ _ _ _ _ _ _

Subcontracting scope: _ _ _ _ _ _ _ _ _ _ _ _

Contents of subcontracted services: _ _ _ _ _ _ _

3, the subcontract work cycle

Start Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

The total calendar working days of _ _ _ days are: _ _ days.

4, quality standards

Project quality: According to the quality agreement in the general (subcontract) contract, the current national construction and acceptance standards for construction and installation projects and the quality evaluation standards for construction and installation projects, this project will reach the quality evaluation level of _ _ _.

5. Contract documents and interpretation sequence

The documents constituting this contract and the priority interpretation order are as follows:

(1) This contract;

(2) Annexes to this contract;

(3) General construction contract of this project;

(4) Professional undertaking of project construction (subcontracting).

6. Standards and norms

Unless otherwise agreed in the general (sub-contract) of this project, the standards and specifications applicable to this contract are as follows:

( 1)___________________

(2)___________________

7. General (Subcontract) Contract

7. 1 The project contractor shall provide the general (sub-) contract (except the price details of the contracted project) for the labor subcontractors to consult. When required by the subcontractor, the contractor shall provide the subcontractor with a copy of the general contract or professional subcontract (except the price breakdown of the contracted project).

7.2 The labor subcontractor shall fully understand the terms of the general (sub-) contract (except the price details of the contracted project).

8. Mapping

8. 1 The engineering contractor shall provide _ _ sets of drawings and _ _ sets of standard drawings related to the contract work to the labor subcontractor _ _ days before the labor subcontracting work starts.

9. Project manager

9. 1 The project manager appointed by the project contractor to perform this contract at the construction site is _ _, with the title of _ _ and the position of _ _.

9.2 The project manager appointed by the labor subcontractor to perform this contract on site is, with the position and title.

10, obligations of project contractor

10. 1. Set up a project management team suitable for the project, fully perform the general (sub-) contract, organize the implementation of construction management, and be responsible to the employer for the construction period and quality of the project;

10.2. Unless otherwise agreed in this contract, the project contractor shall complete the following work of the labor subcontractor in the early stage of construction and bear the corresponding expenses:

(1) before _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

(2) Water, electricity, heat, communication and other construction pipelines and roads shall be completed before _ _ _ _ _ _ _ _ _ _, so as to meet the time and quality requirements of energy supply, communication and smooth construction roads required for the completion of labor services under this contract;

(3) Provide the corresponding engineering site to the labor subcontractor before _ _ _ _ _ _.

Party A (seal): Party B (seal): Party A (seal): Party B (seal): Party B.

Signing time: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Simple project labor contract (3) 1. Project name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Project name

Two. Project location: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Three. Contract method: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Four. Contract unit price: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Verb (abbreviation of verb) Contract contents: According to the contents involved in design and construction, drawings and descriptions, design changes and technical disclosure, masonry of more than three layers of aerated bricks and placement of Rachel bars of secondary structure, plastering and sanitary cleaning of air wells, water wells, electric wells and elevator wells.

Six, the construction requirements:

1, wall verticality within _ _ mm, wall flatness within _ _ mm, horizontal mortar joint within _ _ mm. ..

2, the joint is tight, and the joint of each wall _ _ _ skin block shall not exceed _ _, and there shall be no joint of four skin blocks and four skin blocks above the height, and the mortar joint shall be uniform.

3. If: the mortar should be dense, the blocks should be smooth, and if it is damaged or loose, it should be sealed.

4. Connection between blocks and doors and windows: Precast concrete blocks shall be placed at door openings and window openings, mortar around the concrete blocks shall be dense and full, and the lintel of precast doors shall be coated with primer. It is forbidden to place lintels that have not been dusted.

Seven, safety requirements:

1. Party B must carry out the construction according to the requirements of Party A and equip with necessary safety protection equipment, such as safety helmet. , and illegal operation is strictly prohibited. If a safety accident occurs unexpectedly during the construction, Party B shall be responsible for the extra _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

2. Workers must be healthy workers who have reached the age of _ _ _, and hold corresponding qualification certificates.

3. Party B must carry out civilized construction, and it is forbidden to work on the construction site after drinking. Fighting, brawling and theft are not allowed on the construction site, and all consequences caused by any reason shall be borne by Party B. ..

Eight, time limit for a project arrangement:

Party B must complete the workload within the time specified by Party A. If Party B is understaffed or disobeys Party A's arrangement, Party A has the right to stop Party B's construction.

Nine. Payment terms:

In the process of construction, Party A usually guarantees the basic living expenses of Party B's workers every day, and the personal expenses shall not exceed RMB. When allocating funds, Party B shall pay _ _ _% of the workload in advance, and _ _ _% one week after the project is completed and accepted by Party A, and the final payment shall be settled in one month.

X this contract shall come into effect as of the date of signature by both parties, and shall automatically become invalid after the project is completed and the balance is settled. This contract is made in duplicate, one for each party. Matters not covered shall be settled by both parties through consultation.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

Signing place: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.